Zhao et al., 2023 - Google Patents
Platform-independent visual installation progress monitoring for construction automationZhao et al., 2023
- Document ID
- 14898175310182499217
- Author
- Zhao X
- Jin Y
- Selvaraj N
- Ilyas M
- Cheah C
- Publication year
- Publication venue
- Automation in Construction
External Links
Snippet
Efficient interior progress monitoring is crucial for the timely completion of construction projects. Although robots have been used for data acquisition to automate interior progress monitoring, existing methods do not adequately consider the variations of robot platforms …
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T7/00—Image analysis
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B15/00—Systems controlled by a computer
- G05B15/02—Systems controlled by a computer electric
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ekanayake et al. | Computer vision-based interior construction progress monitoring: A literature review and future research directions | |
Li et al. | Universal path planning for an indoor drone | |
KR102342152B1 (en) | Methods and systems for creating and aligning environment maps | |
Braun et al. | Combining inverse photogrammetry and BIM for automated labeling of construction site images for machine learning | |
Loupos et al. | Autonomous robotic system for tunnel structural inspection and assessment | |
Kim et al. | SLAM-driven intelligent autonomous mobile robot navigation for construction applications | |
Charron et al. | Automated bridge inspection using mobile ground robotics | |
Kucuksubasi et al. | Transfer learning-based crack detection by autonomous UAVs | |
Ibrahim et al. | BIM-driven mission planning and navigation for automatic indoor construction progress detection using robotic ground platform | |
Zhao et al. | Platform-independent visual installation progress monitoring for construction automation | |
Kim et al. | UAV-UGV cooperative 3D environmental mapping | |
Halder et al. | A methodology for BIM-enabled automated reality capture in construction inspection with quadruped robots | |
Shim et al. | Remote robotic system for 3D measurement of concrete damage in tunnel with ground vehicle and manipulator | |
Hu et al. | Multi-agent robotic system (MARS) for UAV-UGV path planning and automatic sensory data collection in cluttered environments | |
JP2024083371A (en) | DATA PROCESSING METHOD, RECORDING MEDIUM, PROGRAM, AND SYSTEM | |
Wang et al. | Automated UAV path-planning for high-quality photogrammetric 3D bridge reconstruction | |
Kim et al. | As-is geometric data collection and 3D visualization through the collaboration between UAV and UGV | |
Adán et al. | An autonomous thermal scanning system with which to obtain 3D thermal models of buildings | |
Tavakoli et al. | Cooperative multi-agent mapping of three-dimensional structures for pipeline inspection applications | |
Guida et al. | Scan-to-bim procedure for an old industrial plant | |
Liu et al. | Framework for automated UAV-based inspection of external building façades | |
Kayhani et al. | Tag-based indoor localization of UAVs in construction environments: Opportunities and challenges in practice | |
Braun et al. | Bim-based progress monitoring | |
Hamledari et al. | UAV mission planning using swarm intelligence and 4D BIMs in support of vision-based construction progress monitoring and as-built modeling | |
Saveliev et al. | Method of autonomous survey of power lines using a multi-rotor UAV |