[go: up one dir, main page]

Zhao et al., 2023 - Google Patents

Platform-independent visual installation progress monitoring for construction automation

Zhao et al., 2023

Document ID
14898175310182499217
Author
Zhao X
Jin Y
Selvaraj N
Ilyas M
Cheah C
Publication year
Publication venue
Automation in Construction

External Links

Snippet

Efficient interior progress monitoring is crucial for the timely completion of construction projects. Although robots have been used for data acquisition to automate interior progress monitoring, existing methods do not adequately consider the variations of robot platforms …
Continue reading at www.sciencedirect.com (other versions)

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T7/00Image analysis
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B15/00Systems controlled by a computer
    • G05B15/02Systems controlled by a computer electric
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models

Similar Documents

Publication Publication Date Title
Ekanayake et al. Computer vision-based interior construction progress monitoring: A literature review and future research directions
Li et al. Universal path planning for an indoor drone
KR102342152B1 (en) Methods and systems for creating and aligning environment maps
Braun et al. Combining inverse photogrammetry and BIM for automated labeling of construction site images for machine learning
Loupos et al. Autonomous robotic system for tunnel structural inspection and assessment
Kim et al. SLAM-driven intelligent autonomous mobile robot navigation for construction applications
Charron et al. Automated bridge inspection using mobile ground robotics
Kucuksubasi et al. Transfer learning-based crack detection by autonomous UAVs
Ibrahim et al. BIM-driven mission planning and navigation for automatic indoor construction progress detection using robotic ground platform
Zhao et al. Platform-independent visual installation progress monitoring for construction automation
Kim et al. UAV-UGV cooperative 3D environmental mapping
Halder et al. A methodology for BIM-enabled automated reality capture in construction inspection with quadruped robots
Shim et al. Remote robotic system for 3D measurement of concrete damage in tunnel with ground vehicle and manipulator
Hu et al. Multi-agent robotic system (MARS) for UAV-UGV path planning and automatic sensory data collection in cluttered environments
JP2024083371A (en) DATA PROCESSING METHOD, RECORDING MEDIUM, PROGRAM, AND SYSTEM
Wang et al. Automated UAV path-planning for high-quality photogrammetric 3D bridge reconstruction
Kim et al. As-is geometric data collection and 3D visualization through the collaboration between UAV and UGV
Adán et al. An autonomous thermal scanning system with which to obtain 3D thermal models of buildings
Tavakoli et al. Cooperative multi-agent mapping of three-dimensional structures for pipeline inspection applications
Guida et al. Scan-to-bim procedure for an old industrial plant
Liu et al. Framework for automated UAV-based inspection of external building façades
Kayhani et al. Tag-based indoor localization of UAVs in construction environments: Opportunities and challenges in practice
Braun et al. Bim-based progress monitoring
Hamledari et al. UAV mission planning using swarm intelligence and 4D BIMs in support of vision-based construction progress monitoring and as-built modeling
Saveliev et al. Method of autonomous survey of power lines using a multi-rotor UAV