WO2016058617A1 - Control of wind turbines - Google Patents

Control of wind turbines Download PDF

Info

Publication number
WO2016058617A1
WO2016058617A1 PCT/DK2015/050321 DK2015050321W WO2016058617A1 WO 2016058617 A1 WO2016058617 A1 WO 2016058617A1 DK 2015050321 W DK2015050321 W DK 2015050321W WO 2016058617 A1 WO2016058617 A1 WO 2016058617A1
Authority
WO
WIPO (PCT)
Prior art keywords
cable
overrating
power
temperature
control signal
Prior art date
Application number
PCT/DK2015/050321
Other languages
French (fr)
Inventor
Chris Spruce
Kelvin Hales
Original Assignee
Vestas Wind Systems A/S
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vestas Wind Systems A/S filed Critical Vestas Wind Systems A/S
Priority to CN201580056271.1A priority Critical patent/CN107076117A/en
Priority to US15/519,784 priority patent/US10480485B2/en
Priority to EP15784561.1A priority patent/EP3207247B1/en
Priority to ES15784561T priority patent/ES2800675T3/en
Publication of WO2016058617A1 publication Critical patent/WO2016058617A1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D7/00Controlling wind motors 
    • F03D7/02Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor
    • F03D7/028Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor controlling wind motor output power
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D9/00Adaptations of wind motors for special use; Combinations of wind motors with apparatus driven thereby; Wind motors specially adapted for installation in particular locations
    • F03D9/20Wind motors characterised by the driven apparatus
    • F03D9/25Wind motors characterised by the driven apparatus the apparatus being an electrical generator
    • F03D9/255Wind motors characterised by the driven apparatus the apparatus being an electrical generator connected to electrical distribution networks; Arrangements therefor
    • F03D9/257Wind motors characterised by the driven apparatus the apparatus being an electrical generator connected to electrical distribution networks; Arrangements therefor the wind motor being part of a wind farm
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2270/00Control
    • F05B2270/10Purpose of the control system
    • F05B2270/103Purpose of the control system to affect the output of the engine
    • F05B2270/1033Power (if explicitly mentioned)
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2270/00Control
    • F05B2270/10Purpose of the control system
    • F05B2270/107Purpose of the control system to cope with emergencies
    • F05B2270/1075Purpose of the control system to cope with emergencies by temporary overriding set control limits
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2270/00Control
    • F05B2270/30Control parameters, e.g. input parameters
    • F05B2270/303Temperature
    • F05B2270/3032Temperature excessive temperatures, e.g. caused by overheating
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Definitions

  • This invention relates to control of wind turbines and wind power plants and, in particular to control methods and apparatus which take into account the temperature of power collection cables when making control decisions.
  • the rated power of a wind turbine is defined in IEC 61400 as the maximum continuous electrical power output which a wind turbine is designed to achieve under normal operating and external conditions.
  • Large commercial wind turbines are generally designed for a lifetime of 20 years and their rated power output takes into account that lifespan.
  • Wnd turbines are commonly operated as part of a wind power plant comprising a plurality of wind turbines.
  • US-A-6,724,097 discloses operation of such a wind plant.
  • the output of each turbine is determined and one or more turbines controlled so that the output power of one or more turbines is reduced if the total output exceeds the rated output of the plant.
  • Such an arrangement is useful as the sum of the individual rated powers may exceed the rated output of the wind power plant, but at any one time not all turbines may be operating at full capacity; some may be shut down for maintenance and some may be experiencing less than ideal wind conditions.
  • one or more power collection cables are used to transport the generated power from a wind turbine, or from a plurality of wind turbines, for export to the grid.
  • Power cables are designed to operate within a temperature range defined by published cable temperature ratings and exceeding this temperature rating can lead to cable failure due to thermal degradation of the insulation surrounding the cable conductor.
  • common maximum allowable temperatures at the surface of the conductor are 60, 75 and 90 °C. Heat is generated as a function of the electric current passing through the cable core. Therefore, the current carried by a power cable is typically limited to avoid increasing cable temperature to above the design temperature.
  • turbines are typically controlled such that boosting of their output is prevented where there is a risk that the increased current from overproduction could lead to one or more collection cables exceeding their design temperature.
  • the present invention aims to provide improved methods and apparatus for controlling wind turbines.
  • a method of controlling a wind turbine comprising the steps of generating and outputting an overrating control signal to the wind turbine, the overrating control signal setting an amount by which the power output of the wind turbine is to be overrated; measuring cable temperature values for at least one power collection cable connected to the wind turbine using at least one cable temperature sensor; determining whether the measured cable temperature values exceed a temperature set point; and modifying the overrating control signal to reduce the amount of overrating if the measured cable temperature values exceed the temperature set point.
  • a method of controlling a plurality of wind turbines connected to a common node from which power generated by the plurality of turbines is exported by at least one power collection cable comprising the steps of generating and outputting an overrating control signal to the plurality of wind turbines, the overrating control signal setting an amount by which the power output of the plurality of wind turbines is to be overrated; measuring cable temperature values for the at least one power collection cable using at least one cable temperature sensor; determining whether the measured cable temperature values exceed a temperature set point; and modifying the overrating control signal of at least one of the wind turbines to reduce the amount of overrating if the measured cable temperature values exceed the temperature set point.
  • the power output of a wind turbine, or a plurality of wind turbines is modified based on actual cable temperature measurements, rather than estimations of cable temperature which require safety margins to be factored in to account for possible inaccuracies.
  • inaccuracies in cable temperature estimations may arise from uncertainties about the thermal properties of the cables and of the installation environment. Since safety margins are not required with the present invention, power output can be increased beyond that possible with cable temperature estimations, while staying within cable temperature rating limitations.
  • the step of modifying the overrating control signal may involve reducing the amount of overrating by any suitable amount in order to reduce the cable temperature.
  • the step of modifying the overrating control signal comprises reducing the amount of overrating to zero.
  • the step of modifying the overrating control signal may comprise reducing the amount of overrating independently of the extent to which the temperature set point is exceeded.
  • the step of modifying the overrating control signal may comprise reducing the amount of overrating according to a predetermined control regime.
  • the step of modifying the overrating control signal comprises incrementally reducing the amount of overrating based on the extent to which the temperature set point is exceeded.
  • the at least one cable temperature sensor may be provided separately from the at least one power collection cable.
  • the at least one cable temperature sensor may be a separate component that is attached to the outside of the at least one power collection cable at one or more locations along the length of the cable.
  • the at least one cable temperature sensor may be integral with the at least one power collection cable.
  • the at least one cable temperature sensor is a distributed temperature sensor extending along a substantial part of the length of the at least one power collection cable.
  • a wind turbine control system comprising at least one cable temperature sensor for measuring cable temperature values for at least one power collection cable connected to the wind turbine; and a controller arranged to generate and output an overrating control signal to the wind turbine, the overrating control signal setting an amount by which the power output of the wind turbine is to be overrated, determining whether the measured cable temperature values exceed a temperature set point and modifying the overrating control signal to reduce the amount of overrating if the temperature set point is exceeded.
  • Figure 1 is a schematic view of a known wind power plant control regime using a power plant controller
  • Figure 2 is a schematic view of a known cluster, or sub-set, of a known wind power plant
  • Figure 3 is a graph of wind speed against power showing a power curve for a typical wind turbine
  • Figure 4 is a schematic view of a further known wind power plant control regime using a power plant controller
  • Figure 5 is a similar view to figure 4 showing a refinement of the control regime
  • Figure 6 is a graph illustrating cut-off control of an amount of overrating in response to changes in cable temperature
  • Figure 7 is a graph of cable temperature against distance along the cable
  • Figure 8 is a schematic view of a wind power plant control regime in accordance with the present invention
  • Figure 9 is a graph illustrating proportional control of the amount of overrating in response to changes in cable temperature
  • Figure 10 is a graph illustrating non-linear control of the amount of overrating in response to changes in cable temperature
  • Figures 11 and 12 are cross-sectional views of cables for use with the present invention.
  • FIG. 1 shows, schematically, a conventional wind power plant 10 comprising a plurality of wind turbines 20 each of which communicates with a power plant controller PPC 30.
  • the PPC 30 can communicate bi-directionally with each turbine.
  • the turbines output power to a grid connection point 40 using collection cables 50, as illustrated by the thick line.
  • the collection cables 50 are typically buried, along at least a portion of their length, in a trench which has been dug in the ground and back-filled, typically with soil or sand.
  • each of the wind turbines will output maximum active power up to their nominal set point. This is their rated power as specified by the manufacturer.
  • the power that is output to the grid connection point is simply the sum of the outputs of each of the turbines.
  • FIG. 1 shows schematically in figure 1 as being arranged in series, this is just one example arrangement.
  • the turbines 20 may be arranged in clusters, or sub-sets of turbines, as illustrated in figure 2.
  • Figure 2 shows, schematically, a wind turbine cluster 15 comprising a plurality of wind turbines 20 each having a power collection cable 50 running to a node 25. The generated power is then transported by a further power collection cable 55 from the node 25 to the grid connection point (not shown) either directly or via an adjacent node.
  • the collection cable 50 of each turbine 20 should have a current-carrying capacity, i.e. a current rating, which exceeds the level of electrical current generated by the turbine 20 while operated at its rated power output.
  • the collection cable 55 running from the node 25 carries current from each of the turbines 20 in the cluster 15, it should have a current rating which is correspondingly larger than that of the collection cables 50 running from each turbine 20.
  • the collection cable 55 running from the node 25 will typically have a current rating of at least 10MW to enable all of the turbines to be simultaneously operated at their rated power outputs, without power restrictions due to insufficient cable current-carrying capacity.
  • Figure 3 illustrates a conventional power curve P of a wind turbine plotting wind speed on the x axis against power output on the y axis.
  • Curve P is the normal power curve for the wind turbine and defines the power output by the wind turbine generator as a function of wind speed.
  • the wind turbine starts to generate power at a cut in wind speed V min .
  • the turbine then operates under part load (also known as partial load) conditions until the rated wind speed is reached at point V R .
  • part load also known as partial load
  • the rated (or nominal) generator power is reached and the turbine is operating under full load.
  • the cut in wind speed in a typical wind turbine is 3 m/s and the rated wind speed is 12 m/s.
  • Point V max is the cut out wind speed which is the highest wind speed at which the wind turbine may be operated while delivering power. At wind speeds equal to and above the cut out wind speed the wind turbine is shut down for safety reasons, in particular to reduce the loads acting on the wind turbine.
  • the rated power of a wind turbine is defined in IEC 61400 as the maximum continuous electrical power output which a wind turbine is designed to achieve under normal operating and external conditions. Therefore, a conventional wind turbine is designed to operate at the rated power so that the design loads of components are not exceeded and that the fatigue life of components is not exceeded.
  • the turbine can be controlled such that it produces more power than the rated power, as indicated by shaded area A.
  • the term "over-rating” is understood to mean producing more than the rated active power during full load operation.
  • the turbine is run more aggressively than normal and the generator has a power output which is higher than the rated power for a given wind speed.
  • the over-rating is characterised by a transient behaviour.
  • a turbine When over-rated it may be for as short as a few seconds, or for an extended period of time if the wind conditions and the fatigue life of the components are favourable to over-rating.
  • the over-rating power level may be up to 30% above the rated power output.
  • the PPC 30 is shown schematically in figure 1 for ease of illustration. It communicates with each of the turbines and can receive data from the turbines, such as data relating to pitch angle, rotor speed, power output, etc and can send commands to individual turbines, such as set points for pitch angle, rotor speed, power output, etc.
  • the PPC 30 also receives commands from the grid, for example from the grid operator to boost or reduce active or reactive power output in response to demand or a fault on the grid.
  • each wind turbine also has its own controller which is responsible for operation of the turbine and communicates with the PPC 30.
  • the PPC 30 receives power output data from each of the turbines and is therefore aware of the active and reactive power output by each turbine and by the plant as a whole at the grid connection point 40. If required, the PPC 30 can receive an operating set point for the power plant as a whole and divide this among each of the turbines so that the output does not exceed the operator assigned set point.
  • the active power plant set point may be anywhere from 0 up to the rated power output for the plant.
  • the "rated power" or “nominal power” output for the plant is the sum of the rated power output of the individual turbines in the plant.
  • the power plant set point may even be above the rated power output of the plant, i.e. the whole plant is overrated. This is discussed further below.
  • Figure 4 shows an arrangement in which an over-rating signal is provided to the turbines 20.
  • the power plant controller 30 instead of receiving an input directly from the grid connection point 40, receives a signal which is a measure of the difference between the total power plant output and the nominal power plant output. This difference is used to provide the basis for over-rating by individual turbines.
  • the actual output of the power park is subtracted from the nominal or rated output of the power park at subtractor 60.
  • the difference, shown as error signal e in figure 4 is input to an integrator 70.
  • the integrator includes in-built saturation which prevents integral wind up which is a well-known problem in controllers where a large change in set point occurs and the integral terms accumulate a significant error during the rise (wind up), thus overshooting and continuing to increase as this accumulated error is offset by errors in the other direction (unwound).
  • the output from integrator 70 is input to a gain G which scales the integrator output to provide an over-rating amount which is then provided to the PPC 30 and sent by the PPC 30 to each of the turbines 20.
  • G which scales the integrator output to provide an over-rating amount which is then provided to the PPC 30 and sent by the PPC 30 to each of the turbines 20.
  • the over-rating signal sent to each turbine is not a fixed control but an indication of a maximum amount of over-rating that each turbine may perform.
  • Each turbine has a controller which will determine whether the turbine can respond to the overrating signal and, if so, by what amount.
  • the turbine controllers determine that conditions are favourable and implement the over-rating signal, the output of the power plant will rise and so the error signal produced by the subtractor 60 will decrease.
  • the integrator will reach equilibrium as the error either reaches zero or the integrator saturates.
  • the turbine controller may be located at the turbine, at a cluster of turbines, or centrally, as described below.
  • an over-rating signal is generated which is indicative of the amount of over-rating that may be performed by turbines of the power plant as a whole and is the same for each turbine.
  • Each turbine responds individually to the over-rating signal in accordance with its controller. If conditions are such that the total control results in over-rating that threatens to exceed the power plant nominal output, the difference will reduce and individual controllers will reduce the amount of over-rating applied.
  • each turbine is given its own over-rating amount by a central turbine controller 110.
  • a central controller 110 provides an input into the PPC 30.
  • the central controller 110 receives an input 120 from each turbine which indicates the over-rating capability of that turbine.
  • the central controller 1 10 then calculates an over-rating value for each turbine based on the present over-rating capability of that turbine and communicates that value to each turbine via the PPC 30.
  • the PPC 30 will take other factors into account, such as the need to ensure that the total power output does not exceed the rated output for the power plant.
  • FIGS 4 and 5 illustrate ways in which the over-rating of each turbine may be implemented via a power plant controller either by generating a common over-rating command for each turbine or by generating an individual over-rating command for each turbine.
  • the output of turbines is over-rated as the total output of the power plant is below the nominal output of the plant. This could be for a variety of reasons. For example, if the total rated output of all turbines is equal to the rated output of the power plant, over-rating may be used if some turbines are shut down for maintenance or are not operating at rated power, for example because the local wind conditions do not permit it.
  • the power plant may be designed to have a rated power output that is higher than the sum of the rated outputs of all the turbines. This is advantageous as over-rating may then be used even when all turbines are at rated output. This enables the plant operator easily to take advantage of changes in operating during favourable market conditions by using over-rating and so boosting income generated from the power plant.
  • the operator may choose to over-rate at any time when additional revenue is required, even if the market data or the tariffs are not particularly favourable at the time. This gives the operator the ability to generate additional cash-flow which may be required for a variety of business reasons.
  • over-rating can be used to boost the output of individual turbines in response to a detected shortfall in power plant output or in response to external economic conditions.
  • over-rating carries inherent risks, particularly to the integrity of turbine and power plant components, such as power collection cables, and it is important to control the extent to which over-rating is used.
  • One way in which this may be achieved is for each turbine to be controlled within the limits of hard and/or soft constraints programmed into the turbine controller, or the PPC, as discussed below.
  • a turbine has hard constraints defined as the maximum and minimum torque and speed at which it can operate. These constraints are imposed by the controller and dictated by factors such as noise limits, gearbox lubrication, component lifetime etc. These constraints are referred to as hard constraints as the controller may not violate them except in the extreme case of performing a shutdown. Although these constraints are rigid, they may vary over time.
  • the controller also imposes soft constraints which are intended to prevent the turbine shutting down during overrating, typically as thermal limits or maximum generator speed are approached. A temperature increase in key components will occur during overrating, for example throughout the drive train, and could cause a shutdown to be triggered. Soft constraints may be lower than hard constraints but result in the controller reducing the amount of overrating rather than performing a shut down. Thus the turbine controller may include soft constraint values for drive train related parameters and generator speed. When the controller detects that a measured value is approaching a soft constraint value the over- rating signal is reduced.
  • the controller includes soft constraints for cable temperature values to prevent damage to the collection cables caused by exceeding their temperature rating during overrating.
  • the temperature of the cable is dependent on several variables including the current flowing through the cable conductor, the electrical resistance of the conductor, the ambient temperature and the ability of the cable to dissipate heat, the latter of which depends on the cable geometry and its surroundings.
  • the controller makes assumptions about these variables to calculate values of temperature along the length of the cable using a cable temperature model. To allow for uncertainties in the calculation, the controller is typically programmed to add a safety margin to the temperature values calculated to ensure that the temperature cable is not underestimated. The controller then limits over-rating where the calculated cable temperature equals or exceeds the temperature rating of the cable.
  • Figure 6 shows a graph illustrating cut-off control of the amount of over-rating in response to the calculated temperature of the cable.
  • the x-axis of the graph indicates the maximum temperature along the length of the cable, as calculated by the controller and the y-axis indicates the power reference set point output by the over-rating controller, on the basis of which the generator output is controlled.
  • a value of P ref of 1.0 corresponds to the rated or nominal power and a value of P re f greater than 1.0 indicates an overrating set point for which the controller requires the generator to produce more than its rated power.
  • the value for P re f is 1.1 , indicating that the controller requires the generator to produce 10% more than the rated power.
  • hotspots may occur at any point between any of the wind turbines and the grid connection point. For example, hotspots may occur in a collection cable running directly from an individual wind turbine, or in a collection cable running from a node and transporting power generated by a number of wind turbines.
  • FIG 7 illustrates an example variation in cable temperature along the length of a collection cable in which cable temperature is plotted on the y-axis and distance along the cable is plotted on the x-axis.
  • the cable temperature calculated by the controller, including the safety margin, is shown as line A and the actual cable temperature is illustrated by line B. As can be seen, two main temperature hotspots occur along the length of the cable.
  • the first of these occurs at approximately one third of the way along the cable and the second at approximately two thirds along the length of the cable. It is apparent that at points along the cable length there is a significant difference between the calculated cable temperature and the actual cable temperature. In particular, the temperature at the hotspots is calculated to exceed the maximum cable temperature, T cut . 0 ff, whereas the actual temperature does not exceed the maximum cable temperature. Therefore, in this example, overrating of the turbine or turbines providing power to that cable will be cancelled by the controller and the lack of accurate information regarding cable temperature has led to an unnecessary reduction in power output.
  • FIG 8 shows, schematically, an arrangement according to a first embodiment of the present invention.
  • the collection cables comprise one or more integral cable temperature sensors (not shown).
  • the sensors monitor the temperature at the surface of the conductors of the collection cables 50, 55 and provide this information to the controller 1 1 0.
  • the controller 1 1 0 uses the cable temperature readings to determine the degree to which the turbines may be overrated.
  • the controller 1 1 0 is programmed with one or more cable temperature set points, or thresholds, and reduces the amount of overrating if the measured cable temperature exceeds the programmed temperature set point(s).
  • the controller 1 1 0 may cancel the overrating control of a wind turbine 20 feeding power to that cable 50, 55 in the manner shown in figure 6.
  • the controller 1 1 0 adjusts the overrating control signal to prevent overrating and instead instructs the turbine to output power at its rated power.
  • the controller 1 10 may adjust the overrating amount in the manner illustrated in figure 9.
  • a lower limit temperature set point S1 is defined. Below temperature S1 , over-rating control is fully activated and the power reference set point is at its maximum value of 1.1. At temperatures in excess of temperature S1 , the controller reduces the power reference set point linearly from 1.1 to 1.0 as the temperature increases. At higher temperature limit, S2, the amount of over-rating is set to be zero.
  • the control is implemented by a single set point S1 and an associated closed-loop control proportionally reduces the power reference over the predetermined range of temperatures (S1 to S2). In this example, the controller is only required to store a single new set point S1 and the parameters to implement the closed loop control. In another example, both temperature limits S1 and S2 may be stored as set points.
  • the over-rating controller operation illustrated in figure 9 provides smoother control at marginal operating conditions than the control of Figure 8.
  • such a system allows the controller to push closer to the maximum power level at which the turbine can generate at a sustainable level.
  • the set point S2 lies in the previous safety margin of Figure 8, meaning that over-rating can take place over a larger range of temperatures, but at reduced levels to the previous case.
  • the controller 110 can adjust the overrating control signal for one or more of the wind turbines connected to the node 25.
  • the overrating control signal may be adjusted in the manner described above in relation to any of figures 6, 9 or 10. This restricts the power output of the cluster 15 of turbines 20 in the node 25 to prevent the temperature of the power collection cable 55 running from the node from exceeding the temperature rating of the cable.
  • overrating can be reduced by the controller 110 where the amount of overrated production needs to be limited, for example due to external grid conditions.
  • the amount of overrated production may need to be limited to 1.02 times rated power at a time when the individual turbines are able to deliver between 1.0 and 1.1 times rated power.
  • the controller 1 10 can use the temperature information from the various cable temperature sensors throughout the wind power plant to selectively constrain power production of the most heavily-loaded parts of the power plant to prolong cable life, even where cable temperature limits are not exceeded.
  • the required production level can instead be achieved by distributing power generation to less heavily loaded parts of the wind power plant.
  • the controller 1 10 is sub-divided into several controllers, each arranged to control a group of wind turbines supplying the same cable. Although the arrangement is slightly different, the principles of operation are the same as described above. As a further alternative, the controller 110 could be further sub-divided to form part of the individual controller of each turbine.
  • the cable temperature sensors may be of any suitable type.
  • the sensors are distributed temperature sensors, such as the Linear Power Series, available from AP Sensing GmbH of Boblingen Germany. These are passive optical sensing fibres which use the RAMAN effect to provide continuous distributed temperature monitoring along the length of the cable.
  • Sensors 90 may be embedded in the insulation 91 of the cable 50 and, for example, adjacent to the cable conductor 92, as shown in figure 1 1.
  • sensors 90 may be attached to and run alongside the insulation 91 of the cable 50, as shown in figure 12.
  • one or more sensors may be attached to the cable 50 in specific locations along the length of the cable. However this is generally suitable only where the exact location of hotspots is already known.
  • Embodiments of the invention enable the amount of over-rating to be modified based on actual cable temperature measurements. Since the actual cable temperature is known, embodiments of the invention enable a wind turbine to be operated within cable temperature rating limitations without the need for additional safety margins relating to cable temperature. Consequently, power output can be increased.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Wind Motors (AREA)

Abstract

The present invention relates to a method and control system comprising at least one cable temperature sensor for measuring cable temperature values for at least one power collection cable (50, 55) connected to a wind turbine (20) and a controller (110) arranged to generate and output an overrating control signal to the wind turbine (20). The output overrating control signal sets an amount by which the power output of the wind turbine (20) is to be overrated. It is determined whether the measured cable temperature values exceed a temperature set point and modifying the overrating control signal to reduce the amount of overrating if the temperature set point is exceeded.

Description

Control of Wind Turbines
This invention relates to control of wind turbines and wind power plants and, in particular to control methods and apparatus which take into account the temperature of power collection cables when making control decisions.
The rated power of a wind turbine is defined in IEC 61400 as the maximum continuous electrical power output which a wind turbine is designed to achieve under normal operating and external conditions. Large commercial wind turbines are generally designed for a lifetime of 20 years and their rated power output takes into account that lifespan.
Wnd turbines are commonly operated as part of a wind power plant comprising a plurality of wind turbines. US-A-6,724,097 discloses operation of such a wind plant. The output of each turbine is determined and one or more turbines controlled so that the output power of one or more turbines is reduced if the total output exceeds the rated output of the plant. Such an arrangement is useful as the sum of the individual rated powers may exceed the rated output of the wind power plant, but at any one time not all turbines may be operating at full capacity; some may be shut down for maintenance and some may be experiencing less than ideal wind conditions.
While the approach taken in US-A-6,724,097 deals with avoiding overproduction by a wind power plant, the total output of the plant may not reach the rated plant power if some turbines are shut down, for example for maintenance, or are not operating at their rated power, for example because the local wind conditions at those turbines do not allow rated power output to be achieved. It is economically desirable, therefore, to boost the output of one or more of the turbines to increase the total output of the power plant to its rated output.
Typically, one or more power collection cables are used to transport the generated power from a wind turbine, or from a plurality of wind turbines, for export to the grid. Power cables are designed to operate within a temperature range defined by published cable temperature ratings and exceeding this temperature rating can lead to cable failure due to thermal degradation of the insulation surrounding the cable conductor. For example, common maximum allowable temperatures at the surface of the conductor are 60, 75 and 90 °C. Heat is generated as a function of the electric current passing through the cable core. Therefore, the current carried by a power cable is typically limited to avoid increasing cable temperature to above the design temperature.
l As a result, turbines are typically controlled such that boosting of their output is prevented where there is a risk that the increased current from overproduction could lead to one or more collection cables exceeding their design temperature.
The present invention aims to provide improved methods and apparatus for controlling wind turbines.
According to a first aspect of the invention, there is provided a method of controlling a wind turbine, the method comprising the steps of generating and outputting an overrating control signal to the wind turbine, the overrating control signal setting an amount by which the power output of the wind turbine is to be overrated; measuring cable temperature values for at least one power collection cable connected to the wind turbine using at least one cable temperature sensor; determining whether the measured cable temperature values exceed a temperature set point; and modifying the overrating control signal to reduce the amount of overrating if the measured cable temperature values exceed the temperature set point.
According to a second aspect of the invention, there is provided a method of controlling a plurality of wind turbines connected to a common node from which power generated by the plurality of turbines is exported by at least one power collection cable, the method comprising the steps of generating and outputting an overrating control signal to the plurality of wind turbines, the overrating control signal setting an amount by which the power output of the plurality of wind turbines is to be overrated; measuring cable temperature values for the at least one power collection cable using at least one cable temperature sensor; determining whether the measured cable temperature values exceed a temperature set point; and modifying the overrating control signal of at least one of the wind turbines to reduce the amount of overrating if the measured cable temperature values exceed the temperature set point. With methods according to the present invention, the power output of a wind turbine, or a plurality of wind turbines, is modified based on actual cable temperature measurements, rather than estimations of cable temperature which require safety margins to be factored in to account for possible inaccuracies. For example, inaccuracies in cable temperature estimations may arise from uncertainties about the thermal properties of the cables and of the installation environment. Since safety margins are not required with the present invention, power output can be increased beyond that possible with cable temperature estimations, while staying within cable temperature rating limitations.
The step of modifying the overrating control signal may involve reducing the amount of overrating by any suitable amount in order to reduce the cable temperature. In certain embodiments, the step of modifying the overrating control signal comprises reducing the amount of overrating to zero.
The step of modifying the overrating control signal may comprise reducing the amount of overrating independently of the extent to which the temperature set point is exceeded. For example, the step of modifying the overrating control signal may comprise reducing the amount of overrating according to a predetermined control regime. In certain embodiments, the step of modifying the overrating control signal comprises incrementally reducing the amount of overrating based on the extent to which the temperature set point is exceeded. The at least one cable temperature sensor may be provided separately from the at least one power collection cable. For example, the at least one cable temperature sensor may be a separate component that is attached to the outside of the at least one power collection cable at one or more locations along the length of the cable. The at least one cable temperature sensor may be integral with the at least one power collection cable. In certain embodiments, the at least one cable temperature sensor is a distributed temperature sensor extending along a substantial part of the length of the at least one power collection cable.
According to a third aspect of the present invention, there is provided a wind turbine control system comprising at least one cable temperature sensor for measuring cable temperature values for at least one power collection cable connected to the wind turbine; and a controller arranged to generate and output an overrating control signal to the wind turbine, the overrating control signal setting an amount by which the power output of the wind turbine is to be overrated, determining whether the measured cable temperature values exceed a temperature set point and modifying the overrating control signal to reduce the amount of overrating if the temperature set point is exceeded.
Embodiments of the invention will now be described, by way of example only, and with reference to the accompanying drawings, in which: Figure 1 is a schematic view of a known wind power plant control regime using a power plant controller; Figure 2 is a schematic view of a known cluster, or sub-set, of a known wind power plant;
Figure 3 is a graph of wind speed against power showing a power curve for a typical wind turbine;
Figure 4 is a schematic view of a further known wind power plant control regime using a power plant controller; Figure 5 is a similar view to figure 4 showing a refinement of the control regime;
Figure 6 is a graph illustrating cut-off control of an amount of overrating in response to changes in cable temperature; Figure 7 is a graph of cable temperature against distance along the cable;
Figure 8 is a schematic view of a wind power plant control regime in accordance with the present invention; Figure 9 is a graph illustrating proportional control of the amount of overrating in response to changes in cable temperature;
Figure 10 is a graph illustrating non-linear control of the amount of overrating in response to changes in cable temperature;
Figures 11 and 12 are cross-sectional views of cables for use with the present invention.
The following description addresses the general control of turbines in a wind turbine power plant, the control of output power from those turbines, and the adjustment of this control based on cable temperature. It describes control regimes which are both devised by a multi- turbine controller and sent as commands to individual turbines, and control regimes which are implemented by individual turbines and then communicated to a multi-turbine controller such as a power plant controller. Figure 1 shows, schematically, a conventional wind power plant 10 comprising a plurality of wind turbines 20 each of which communicates with a power plant controller PPC 30. The PPC 30 can communicate bi-directionally with each turbine. The turbines output power to a grid connection point 40 using collection cables 50, as illustrated by the thick line. The collection cables 50 are typically buried, along at least a portion of their length, in a trench which has been dug in the ground and back-filled, typically with soil or sand.
In operation, and assuming that wind conditions permit, each of the wind turbines will output maximum active power up to their nominal set point. This is their rated power as specified by the manufacturer. The power that is output to the grid connection point is simply the sum of the outputs of each of the turbines.
Although the turbines 20 are shown schematically in figure 1 as being arranged in series, this is just one example arrangement. For example, the turbines 20 may be arranged in clusters, or sub-sets of turbines, as illustrated in figure 2. Figure 2 shows, schematically, a wind turbine cluster 15 comprising a plurality of wind turbines 20 each having a power collection cable 50 running to a node 25. The generated power is then transported by a further power collection cable 55 from the node 25 to the grid connection point (not shown) either directly or via an adjacent node. The collection cable 50 of each turbine 20 should have a current-carrying capacity, i.e. a current rating, which exceeds the level of electrical current generated by the turbine 20 while operated at its rated power output. As the collection cable 55 running from the node 25 carries current from each of the turbines 20 in the cluster 15, it should have a current rating which is correspondingly larger than that of the collection cables 50 running from each turbine 20. For example, where the cluster 15 comprises five turbines 20, each with a rated power of 2MW, the collection cable 55 running from the node 25 will typically have a current rating of at least 10MW to enable all of the turbines to be simultaneously operated at their rated power outputs, without power restrictions due to insufficient cable current-carrying capacity.
Figure 3 illustrates a conventional power curve P of a wind turbine plotting wind speed on the x axis against power output on the y axis. Curve P is the normal power curve for the wind turbine and defines the power output by the wind turbine generator as a function of wind speed. As is well known in the art, the wind turbine starts to generate power at a cut in wind speed Vmin. The turbine then operates under part load (also known as partial load) conditions until the rated wind speed is reached at point VR. At the rated wind speed, at point VR, the rated (or nominal) generator power is reached and the turbine is operating under full load. The cut in wind speed in a typical wind turbine is 3 m/s and the rated wind speed is 12 m/s. Point Vmax is the cut out wind speed which is the highest wind speed at which the wind turbine may be operated while delivering power. At wind speeds equal to and above the cut out wind speed the wind turbine is shut down for safety reasons, in particular to reduce the loads acting on the wind turbine.
As described above, the rated power of a wind turbine is defined in IEC 61400 as the maximum continuous electrical power output which a wind turbine is designed to achieve under normal operating and external conditions. Therefore, a conventional wind turbine is designed to operate at the rated power so that the design loads of components are not exceeded and that the fatigue life of components is not exceeded.
As shown in figure 3, the turbine can be controlled such that it produces more power than the rated power, as indicated by shaded area A. The term "over-rating" is understood to mean producing more than the rated active power during full load operation. When the turbine is over-rated, the turbine is run more aggressively than normal and the generator has a power output which is higher than the rated power for a given wind speed.
The over-rating is characterised by a transient behaviour. When a turbine is over-rated it may be for as short as a few seconds, or for an extended period of time if the wind conditions and the fatigue life of the components are favourable to over-rating.
The over-rating power level may be up to 30% above the rated power output.
The PPC 30 is shown schematically in figure 1 for ease of illustration. It communicates with each of the turbines and can receive data from the turbines, such as data relating to pitch angle, rotor speed, power output, etc and can send commands to individual turbines, such as set points for pitch angle, rotor speed, power output, etc. The PPC 30 also receives commands from the grid, for example from the grid operator to boost or reduce active or reactive power output in response to demand or a fault on the grid. Although not shown in the schematic figure, each wind turbine also has its own controller which is responsible for operation of the turbine and communicates with the PPC 30.
The PPC 30 receives power output data from each of the turbines and is therefore aware of the active and reactive power output by each turbine and by the plant as a whole at the grid connection point 40. If required, the PPC 30 can receive an operating set point for the power plant as a whole and divide this among each of the turbines so that the output does not exceed the operator assigned set point. The active power plant set point may be anywhere from 0 up to the rated power output for the plant. The "rated power" or "nominal power" output for the plant is the sum of the rated power output of the individual turbines in the plant. The power plant set point may even be above the rated power output of the plant, i.e. the whole plant is overrated. This is discussed further below.
Figure 4 shows an arrangement in which an over-rating signal is provided to the turbines 20. In this example, instead of receiving an input directly from the grid connection point 40, the power plant controller 30 receives a signal which is a measure of the difference between the total power plant output and the nominal power plant output. This difference is used to provide the basis for over-rating by individual turbines. The actual output of the power park is subtracted from the nominal or rated output of the power park at subtractor 60. The difference, shown as error signal e in figure 4 is input to an integrator 70. The integrator includes in-built saturation which prevents integral wind up which is a well-known problem in controllers where a large change in set point occurs and the integral terms accumulate a significant error during the rise (wind up), thus overshooting and continuing to increase as this accumulated error is offset by errors in the other direction (unwound).
The output from integrator 70 is input to a gain G which scales the integrator output to provide an over-rating amount which is then provided to the PPC 30 and sent by the PPC 30 to each of the turbines 20. In theory, only a single turbine may be over-rated, but it is preferred to over-rate a plurality of the turbines, and most preferred to send the over-rating signal to all the turbines. The over-rating signal sent to each turbine is not a fixed control but an indication of a maximum amount of over-rating that each turbine may perform. Each turbine has a controller which will determine whether the turbine can respond to the overrating signal and, if so, by what amount. Where the turbine controllers determine that conditions are favourable and implement the over-rating signal, the output of the power plant will rise and so the error signal produced by the subtractor 60 will decrease. The integrator will reach equilibrium as the error either reaches zero or the integrator saturates. The turbine controller may be located at the turbine, at a cluster of turbines, or centrally, as described below. Thus, in this example an over-rating signal is generated which is indicative of the amount of over-rating that may be performed by turbines of the power plant as a whole and is the same for each turbine. Each turbine responds individually to the over-rating signal in accordance with its controller. If conditions are such that the total control results in over-rating that threatens to exceed the power plant nominal output, the difference will reduce and individual controllers will reduce the amount of over-rating applied.
In the previous example, the same over-rating set point signal is sent to each turbine using the total power plant output to provide a control input. In the embodiment of figure 5, each turbine is given its own over-rating amount by a central turbine controller 110. Thus in figure 5, a central controller 110 provides an input into the PPC 30. The central controller 110 receives an input 120 from each turbine which indicates the over-rating capability of that turbine. The central controller 1 10 then calculates an over-rating value for each turbine based on the present over-rating capability of that turbine and communicates that value to each turbine via the PPC 30. Of course the PPC 30 will take other factors into account, such as the need to ensure that the total power output does not exceed the rated output for the power plant.
Thus figures 4 and 5 illustrate ways in which the over-rating of each turbine may be implemented via a power plant controller either by generating a common over-rating command for each turbine or by generating an individual over-rating command for each turbine. In these examples, the output of turbines is over-rated as the total output of the power plant is below the nominal output of the plant. This could be for a variety of reasons. For example, if the total rated output of all turbines is equal to the rated output of the power plant, over-rating may be used if some turbines are shut down for maintenance or are not operating at rated power, for example because the local wind conditions do not permit it.
Alternatively, the power plant may be designed to have a rated power output that is higher than the sum of the rated outputs of all the turbines. This is advantageous as over-rating may then be used even when all turbines are at rated output. This enables the plant operator easily to take advantage of changes in operating during favourable market conditions by using over-rating and so boosting income generated from the power plant. The operator may choose to over-rate at any time when additional revenue is required, even if the market data or the tariffs are not particularly favourable at the time. This gives the operator the ability to generate additional cash-flow which may be required for a variety of business reasons. Thus, over-rating can be used to boost the output of individual turbines in response to a detected shortfall in power plant output or in response to external economic conditions.
However, over-rating carries inherent risks, particularly to the integrity of turbine and power plant components, such as power collection cables, and it is important to control the extent to which over-rating is used. One way in which this may be achieved is for each turbine to be controlled within the limits of hard and/or soft constraints programmed into the turbine controller, or the PPC, as discussed below. A turbine has hard constraints defined as the maximum and minimum torque and speed at which it can operate. These constraints are imposed by the controller and dictated by factors such as noise limits, gearbox lubrication, component lifetime etc. These constraints are referred to as hard constraints as the controller may not violate them except in the extreme case of performing a shutdown. Although these constraints are rigid, they may vary over time.
The controller also imposes soft constraints which are intended to prevent the turbine shutting down during overrating, typically as thermal limits or maximum generator speed are approached. A temperature increase in key components will occur during overrating, for example throughout the drive train, and could cause a shutdown to be triggered. Soft constraints may be lower than hard constraints but result in the controller reducing the amount of overrating rather than performing a shut down. Thus the turbine controller may include soft constraint values for drive train related parameters and generator speed. When the controller detects that a measured value is approaching a soft constraint value the over- rating signal is reduced.
The controller includes soft constraints for cable temperature values to prevent damage to the collection cables caused by exceeding their temperature rating during overrating. The temperature of the cable is dependent on several variables including the current flowing through the cable conductor, the electrical resistance of the conductor, the ambient temperature and the ability of the cable to dissipate heat, the latter of which depends on the cable geometry and its surroundings. The controller makes assumptions about these variables to calculate values of temperature along the length of the cable using a cable temperature model. To allow for uncertainties in the calculation, the controller is typically programmed to add a safety margin to the temperature values calculated to ensure that the temperature cable is not underestimated. The controller then limits over-rating where the calculated cable temperature equals or exceeds the temperature rating of the cable.
Figure 6 shows a graph illustrating cut-off control of the amount of over-rating in response to the calculated temperature of the cable. The x-axis of the graph indicates the maximum temperature along the length of the cable, as calculated by the controller and the y-axis indicates the power reference set point output by the over-rating controller, on the basis of which the generator output is controlled. A value of Pref of 1.0 corresponds to the rated or nominal power and a value of Pref greater than 1.0 indicates an overrating set point for which the controller requires the generator to produce more than its rated power. In this example, the value for Pref is 1.1 , indicating that the controller requires the generator to produce 10% more than the rated power. Overrating is permitted up to a maximum temperature indicated by Tcut-off- Once the cable temperature is calculated to have reached Tcut-0ff at any point along the cable length, the controller cancels the overrating mode of operation and the power output is set at the rated power.
As cable temperature is dependent on external factors which are not constant along the length of the cable, such as ambient temperature and the cable surroundings, local increases in cable temperature can occur along the cable length. For instance, local increases in temperature may occur where a cable is positioned close to other power cables, or where a section of the cable is buried and surrounded by material with low thermal conductivity, which inhibits the dissipation of heat. These local increases in cable temperature are termed "hotspots" and dictate the maximum current which can be safely carried by the cable. Such hotspots may occur at any point between any of the wind turbines and the grid connection point. For example, hotspots may occur in a collection cable running directly from an individual wind turbine, or in a collection cable running from a node and transporting power generated by a number of wind turbines.
Due to the safety margins required to allow for inaccuracies in the calculated cable temperature, for example to account for a situation where the cable is buried and the material used to back-fill the trench differs from that assumed by the cable model, there may be significant differences in the calculated and actual cable temperatures, as illustrated in figure 7. Figure 7 illustrates an example variation in cable temperature along the length of a collection cable in which cable temperature is plotted on the y-axis and distance along the cable is plotted on the x-axis. The cable temperature calculated by the controller, including the safety margin, is shown as line A and the actual cable temperature is illustrated by line B. As can be seen, two main temperature hotspots occur along the length of the cable. The first of these occurs at approximately one third of the way along the cable and the second at approximately two thirds along the length of the cable. It is apparent that at points along the cable length there is a significant difference between the calculated cable temperature and the actual cable temperature. In particular, the temperature at the hotspots is calculated to exceed the maximum cable temperature, Tcut.0ff, whereas the actual temperature does not exceed the maximum cable temperature. Therefore, in this example, overrating of the turbine or turbines providing power to that cable will be cancelled by the controller and the lack of accurate information regarding cable temperature has led to an unnecessary reduction in power output.
Figure 8 shows, schematically, an arrangement according to a first embodiment of the present invention. In this embodiment, which is similar to the arrangements shown in figures 2 and 5, the collection cables comprise one or more integral cable temperature sensors (not shown). The sensors monitor the temperature at the surface of the conductors of the collection cables 50, 55 and provide this information to the controller 1 1 0. The controller 1 1 0 then uses the cable temperature readings to determine the degree to which the turbines may be overrated. In particular, the controller 1 1 0 is programmed with one or more cable temperature set points, or thresholds, and reduces the amount of overrating if the measured cable temperature exceeds the programmed temperature set point(s).
For example, if the temperature sensors indicate that the temperature at any point along the length of a collection cable 50, 55 equals or exceeds the maximum allowable temperature, Tcut-off, the controller 1 1 0 may cancel the overrating control of a wind turbine 20 feeding power to that cable 50, 55 in the manner shown in figure 6. In this example, if the measured temperature exceeds or equals the temperature set point Tcut-0ff the controller 1 10 sends an overrating control signal with a power reference set point having a value of Pref= 1 .0. Thus, the controller 1 1 0 adjusts the overrating control signal to prevent overrating and instead instructs the turbine to output power at its rated power. This restricts the current carried by the collection cables 50, 55 to prevent damage caused by cable temperatures above the rated temperature of the cable. Alternatively, the controller 1 10 may adjust the overrating amount in the manner illustrated in figure 9. In figure 9, a lower limit temperature set point S1 is defined. Below temperature S1 , over-rating control is fully activated and the power reference set point is at its maximum value of 1.1. At temperatures in excess of temperature S1 , the controller reduces the power reference set point linearly from 1.1 to 1.0 as the temperature increases. At higher temperature limit, S2, the amount of over-rating is set to be zero. In one example, the control is implemented by a single set point S1 and an associated closed-loop control proportionally reduces the power reference over the predetermined range of temperatures (S1 to S2). In this example, the controller is only required to store a single new set point S1 and the parameters to implement the closed loop control. In another example, both temperature limits S1 and S2 may be stored as set points.
The over-rating controller operation illustrated in figure 9 provides smoother control at marginal operating conditions than the control of Figure 8. In addition, such a system allows the controller to push closer to the maximum power level at which the turbine can generate at a sustainable level. In other words, as illustrated in Figure 9, the set point S2 lies in the previous safety margin of Figure 8, meaning that over-rating can take place over a larger range of temperatures, but at reduced levels to the previous case. A wind turbine generator that operates for half the time at Pref = 1.1 and half the time at Pref = 1.0, controlled according to the over-rating control method of figure 8,would yield a mean power output of 105% rated power. In contrast, a generator controlled according to the overrating control method of figure 9 may stabilise at an approximately constant value of Pref = 1.07, yielding a mean power output of 107% rated power. This is particularly useful since the relationship between power and the heating of the cable is non-linear. That is, the majority of the temperature increase during over-rating occurs near to the maximum over-rated power (Pref = 1.1).
In alternative examples, it may preferable to use a non-linear control relationship between the cable temperature and the power reference set point, as illustrated by the graph in figure 10.
Where the temperature sensors indicate that the temperature of a power collection cable 55 running from a node 25 equals or exceeds Tcut-0ff for that cable, the controller 110 can adjust the overrating control signal for one or more of the wind turbines connected to the node 25. The overrating control signal may be adjusted in the manner described above in relation to any of figures 6, 9 or 10. This restricts the power output of the cluster 15 of turbines 20 in the node 25 to prevent the temperature of the power collection cable 55 running from the node from exceeding the temperature rating of the cable.
In addition to restricting power output where certain temperature limits are equalled or exceeded, overrating can be reduced by the controller 110 where the amount of overrated production needs to be limited, for example due to external grid conditions. For example, the amount of overrated production may need to be limited to 1.02 times rated power at a time when the individual turbines are able to deliver between 1.0 and 1.1 times rated power. The controller 1 10 can use the temperature information from the various cable temperature sensors throughout the wind power plant to selectively constrain power production of the most heavily-loaded parts of the power plant to prolong cable life, even where cable temperature limits are not exceeded. The required production level can instead be achieved by distributing power generation to less heavily loaded parts of the wind power plant.
In an alternative embodiment (not shown) the controller 1 10 is sub-divided into several controllers, each arranged to control a group of wind turbines supplying the same cable. Although the arrangement is slightly different, the principles of operation are the same as described above. As a further alternative, the controller 110 could be further sub-divided to form part of the individual controller of each turbine.
The cable temperature sensors may be of any suitable type. Preferably, the sensors are distributed temperature sensors, such as the Linear Power Series, available from AP Sensing GmbH of Boblingen Germany. These are passive optical sensing fibres which use the RAMAN effect to provide continuous distributed temperature monitoring along the length of the cable. Sensors 90 may be embedded in the insulation 91 of the cable 50 and, for example, adjacent to the cable conductor 92, as shown in figure 1 1. Alternatively, sensors 90 may be attached to and run alongside the insulation 91 of the cable 50, as shown in figure 12. As a further alternative, one or more sensors (not shown) may be attached to the cable 50 in specific locations along the length of the cable. However this is generally suitable only where the exact location of hotspots is already known.
Embodiments of the invention enable the amount of over-rating to be modified based on actual cable temperature measurements. Since the actual cable temperature is known, embodiments of the invention enable a wind turbine to be operated within cable temperature rating limitations without the need for additional safety margins relating to cable temperature. Consequently, power output can be increased.
Many alternatives to the embodiments described are possible and will occur to those skilled in the art without departing from the scope of the invention which is defined by the following claims.

Claims

Claims
1. A method of controlling a wind turbine, the method comprising the steps of:
generating and outputting an overrating control signal to the wind turbine, the overrating control signal setting an amount by which the power output of the wind turbine is to be overrated;
measuring cable temperature values for at least one power collection cable connected to the wind turbine using at least one cable temperature sensor;
determining whether the measured cable temperature values exceed a temperature set point; and
modifying the overrating control signal to reduce the amount of overrating if the measured cable temperature values exceed the temperature set point.
2. A method of controlling a plurality of wind turbines connected to a common node from which power generated by the plurality of turbines is exported by at least one power collection cable, the method comprising the steps of:
generating and outputting an overrating control signal to the plurality of wind turbines, the overrating control signal setting an amount by which the power output of the plurality of wind turbines is to be overrated;
measuring cable temperature values for the at least one power collection cable using at least one cable temperature sensor;
determining whether the measured cable temperature values exceed a temperature set point; and
modifying the overrating control signal of at least one of the wind turbines to reduce the amount of overrating if the measured cable temperature values exceed the temperature set point.
3. The method according to claim 1 or 2, wherein the step of modifying the overrating control signal comprises reducing the amount of overrating to zero.
4. The method according to claim 1 or 2 wherein the step of modifying the overrating control signal comprises incrementally reducing the amount of overrating based on the extent to which the temperature set point is exceeded.
5. The method according to any of claims 1 to 4, wherein the at least one cable temperature sensor is integral with the at least one power collection cable.
6. The method according to claim 5, wherein the at least one cable temperature sensor is a distributed temperature sensor extending along a substantial part of the length of the at least one power collection cable.
7. A wind turbine control system comprising:
at least one cable temperature sensor for measuring cable temperature values for at least one power collection cable connected to the wind turbine; and
a controller arranged to generate and output an overrating control signal to the wind turbine, the overrating control signal setting an amount by which the power output of the wind turbine is to be overrated, determining whether the measured cable temperature values exceed a temperature set point and modifying the overrating control signal to reduce the amount of overrating if the temperature set point is exceeded.
PCT/DK2015/050321 2014-10-17 2015-10-16 Control of wind turbines WO2016058617A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201580056271.1A CN107076117A (en) 2014-10-17 2015-10-16 The control of wind turbine
US15/519,784 US10480485B2 (en) 2014-10-17 2015-10-16 Control of wind turbines
EP15784561.1A EP3207247B1 (en) 2014-10-17 2015-10-16 Control of wind turbines
ES15784561T ES2800675T3 (en) 2014-10-17 2015-10-16 Wind turbine control

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DKPA201470643 2014-10-17
DKPA201470643 2014-10-17

Publications (1)

Publication Number Publication Date
WO2016058617A1 true WO2016058617A1 (en) 2016-04-21

Family

ID=54347465

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/DK2015/050321 WO2016058617A1 (en) 2014-10-17 2015-10-16 Control of wind turbines

Country Status (5)

Country Link
US (1) US10480485B2 (en)
EP (1) EP3207247B1 (en)
CN (1) CN107076117A (en)
ES (1) ES2800675T3 (en)
WO (1) WO2016058617A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018028753A1 (en) * 2016-08-09 2018-02-15 Mhi Vestas Offshore Wind A/S Wind turbine control method and system
WO2019001917A1 (en) * 2017-06-28 2019-01-03 Innogy Se Wind energy system and method for controlling a wind energy system
EP3792482A1 (en) * 2019-09-16 2021-03-17 Siemens Gamesa Renewable Energy A/S Power boost for a wind turbine
CN114183303A (en) * 2020-09-14 2022-03-15 维斯塔斯风力系统集团公司 Method of controlling wind turbine generator

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11062588B2 (en) * 2016-03-23 2021-07-13 Solaredge Technologies Ltd. Conductor temperature detector
US10658833B2 (en) 2016-03-23 2020-05-19 Solaredge Technologies Ltd. Conductor temperature detector
DE102017007132A1 (en) * 2017-07-31 2019-01-31 Senvion Gmbh Provision of control power in the operation of a regenerative power generation unit, in particular wind turbine
RU2020121441A (en) * 2017-11-30 2021-12-30 Микаэл МУНОЗ Wireless sensor system with Internet Control of Industrial Equipment (JOT) that enables process control, predictive maintenance of electrical distribution networks, liquid and gas pipelines, and monitoring of air pollutants, including nuclear, chemical and biological substances, using plug-in and/or embedded passive electromagnetic sensors
CN109372690B (en) * 2018-12-29 2022-12-13 新疆金风科技股份有限公司 Power control method, device, electronic equipment and medium of wind power generating set
CN111765055B (en) * 2020-07-08 2023-02-03 中国船舶重工集团海装风电股份有限公司 Refined safety protection method for power loop of wind turbine generator
CN114439681B (en) * 2020-10-30 2024-12-10 金风科技股份有限公司 Power boosting method and device for wind turbine generator set

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130270827A1 (en) * 2010-09-30 2013-10-17 Vestas Wind Systems A/S Over-rating control in wind turbines and wind power plants
WO2014048583A1 (en) * 2012-09-28 2014-04-03 Siemens Aktiengesellschaft Method and arrangement for controlling a wind turbine
WO2015014368A1 (en) * 2013-07-29 2015-02-05 Vestas Wind Systems A/S Simulation of a maximum power output of a wind turbine
WO2015135546A1 (en) * 2014-03-12 2015-09-17 Vestas Wind Systems A/S Wind turbine with over-rating control

Family Cites Families (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102004048341A1 (en) * 2004-10-01 2006-04-13 Repower Systems Ag Wind farm with robust reactive power regulation and method of operation
US8649911B2 (en) * 2005-06-03 2014-02-11 General Electric Company System and method for operating a wind farm under high wind speed conditions
US7914250B2 (en) * 2006-12-08 2011-03-29 General Electric Company Method and system for estimating life of a gearbox
KR20110111299A (en) 2009-01-30 2011-10-10 지멘스 악티엔게젤샤프트 Power Frequency Inertia for Power Generation Systems
GB2484266A (en) * 2010-09-30 2012-04-11 Vestas Wind Sys As Over-rating control of a wind turbine power plant
DK2444659T3 (en) 2010-10-19 2016-10-03 Siemens Ag A method and system for adjusting an output parameter of a wind turbine
CN102622458B (en) 2011-01-30 2013-07-31 华锐风电科技(集团)股份有限公司 Wind generating set vibration and load integration evaluating system and evaluation method
US9127642B2 (en) 2011-03-29 2015-09-08 General Electric Company Methods for adjusting the power output of a wind turbine
ES2587854T3 (en) * 2011-06-30 2016-10-27 Vestas Wind Systems A/S System and method for controlling the power output of a wind turbine or a wind power plant
DK201170539A (en) * 2011-09-30 2013-03-31 Vestas Wind Sys As Control of wind turbines
CN102872556B (en) 2012-10-11 2015-06-03 国电联合动力技术有限公司 Cable fire prevention device and method of wind generating set
WO2014114295A1 (en) 2013-01-25 2014-07-31 Vestas Wind Systems A/S Control of wind turbines
DE102013210812A1 (en) * 2013-06-10 2014-12-11 Wobben Properties Gmbh Method for feeding electrical power into an electrical supply network
CN104811109B (en) * 2014-01-28 2017-09-15 台达电子工业股份有限公司 Power control system and method for generator
CN105337299B (en) * 2014-05-30 2019-05-28 通用电气公司 System and method for controlling the power generation system being connected in weak grid
ES2781599T3 (en) * 2014-11-24 2020-09-03 Vestas Wind Sys As Determination of wind turbine configuration
EP3224473B1 (en) * 2014-11-24 2020-09-16 Vestas Wind Systems A/S Over-rating control of a wind turbine
ES2873399T3 (en) * 2015-06-30 2021-11-03 Vestas Wind Sys As Method and control system for the protection of wind turbines
US10871146B2 (en) * 2015-06-30 2020-12-22 Vestas Wind Systems A/S Methods and systems for generating wind turbine control schedules
DK201570560A1 (en) * 2015-08-28 2017-03-27 Vestas Wind Sys As Wind Turbine Control Over-ride
EP3317519B1 (en) * 2015-06-30 2020-09-16 Vestas Wind Systems A/S Control method and system for wind turbines
US10746160B2 (en) * 2015-06-30 2020-08-18 Vestas Wind Systems A/S Methods and systems for generating wind turbine control schedules
WO2017000954A1 (en) * 2015-06-30 2017-01-05 Vestas Wind Systems A/S Initialisation of wind turbine control functions
CN107820540B (en) * 2015-06-30 2020-03-17 维斯塔斯风力系统集团公司 Prediction-based wind turbine control
EP3317523B1 (en) * 2015-06-30 2020-09-23 Vestas Wind Systems A/S Methods and systems for generating wind turbine control schedules
CN107709764B (en) * 2015-06-30 2019-10-18 维斯塔斯风力系统集团公司 The method and system arranged for generating wind turbine control
DK201570559A1 (en) * 2015-08-28 2017-03-27 Vestas Wind Sys As Methods and Systems for Generating Wind Turbine Control Schedules

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130270827A1 (en) * 2010-09-30 2013-10-17 Vestas Wind Systems A/S Over-rating control in wind turbines and wind power plants
WO2014048583A1 (en) * 2012-09-28 2014-04-03 Siemens Aktiengesellschaft Method and arrangement for controlling a wind turbine
WO2015014368A1 (en) * 2013-07-29 2015-02-05 Vestas Wind Systems A/S Simulation of a maximum power output of a wind turbine
WO2015135546A1 (en) * 2014-03-12 2015-09-17 Vestas Wind Systems A/S Wind turbine with over-rating control

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018028753A1 (en) * 2016-08-09 2018-02-15 Mhi Vestas Offshore Wind A/S Wind turbine control method and system
US10865774B2 (en) 2016-08-09 2020-12-15 Mhi Vestas Offshore A/S Wind turbine control method and system
WO2019001917A1 (en) * 2017-06-28 2019-01-03 Innogy Se Wind energy system and method for controlling a wind energy system
DE102017114309A1 (en) * 2017-06-28 2019-01-03 Innogy Se WIND ENERGY SYSTEM AND METHOD FOR REGULATING A WIND POWER PLANT
US12168974B2 (en) * 2017-06-28 2024-12-17 Innogy Se Wind energy system and method for controlling a wind power system
EP3792482A1 (en) * 2019-09-16 2021-03-17 Siemens Gamesa Renewable Energy A/S Power boost for a wind turbine
WO2021052655A1 (en) * 2019-09-16 2021-03-25 Siemens Gamesa Renewable Energy A/S Power boost for a wind turbine
US12215671B2 (en) 2019-09-16 2025-02-04 Siemens Gamesa Renewable Energy A/S Power boost for a wind turbine
CN114183303A (en) * 2020-09-14 2022-03-15 维斯塔斯风力系统集团公司 Method of controlling wind turbine generator
EP3967870A1 (en) * 2020-09-14 2022-03-16 Vestas Offshore Wind A/S Method of controlling a wind turbine generator
US11401916B2 (en) 2020-09-14 2022-08-02 Vestas Wind Systems A/S Method of controlling a wind turbine generator
CN114183303B (en) * 2020-09-14 2024-05-28 维斯塔斯风力系统集团公司 Method of controlling a wind turbine generator

Also Published As

Publication number Publication date
US20170248123A1 (en) 2017-08-31
ES2800675T3 (en) 2021-01-04
CN107076117A (en) 2017-08-18
US10480485B2 (en) 2019-11-19
EP3207247B1 (en) 2020-06-17
EP3207247A1 (en) 2017-08-23

Similar Documents

Publication Publication Date Title
EP3207247B1 (en) Control of wind turbines
US10436178B2 (en) Wind turbine with over-rating control
US7372173B2 (en) Wind farm and method for operating same
US9366227B2 (en) Control of electric output of a wind park
US8928163B2 (en) System and process for controlling active power in a power generation plant
CN107810324B (en) Method and system for generating a wind turbine control schedule
ES2813376T3 (en) Control of a group of wind turbines
US20100298991A1 (en) System and method for controlling a wind farm
KR20160005771A (en) Method for feeding electrical power into an electric supply network
US9515486B2 (en) Output control device and output control method for wind farm
US20180187650A1 (en) Wind turbine control over-ride
KR20160002958A (en) Method for controlling a wind park
CN107709765B (en) Method and system for generating a wind turbine control schedule
US20170356420A1 (en) Over-rating control of a wind turbine generator
US10865774B2 (en) Wind turbine control method and system
WO2017000959A1 (en) Wind turbine control over-ride
KR20190095402A (en) Appropriate wind turbines with a method for operating a wind turbine, means for controlling and / or regulating the wind turbine and a rotor and a generator driven by the rotor to generate power
US9500181B2 (en) Method for controlling a wind turbine including reversing an energy flow through a generator
CN119137832A (en) Method and system for controlling a power plant during network frequency fluctuations
CN117099282A (en) Method and system for enhancing active power control during frequency deviations
JP2016134928A (en) Device and method for controlling waterwheel generator

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15784561

Country of ref document: EP

Kind code of ref document: A1

REEP Request for entry into the european phase

Ref document number: 2015784561

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2015784561

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 15519784

Country of ref document: US