JPH10263974A - Work shifting device and its method for machine tool - Google Patents
Work shifting device and its method for machine toolInfo
- Publication number
- JPH10263974A JPH10263974A JP7425297A JP7425297A JPH10263974A JP H10263974 A JPH10263974 A JP H10263974A JP 7425297 A JP7425297 A JP 7425297A JP 7425297 A JP7425297 A JP 7425297A JP H10263974 A JPH10263974 A JP H10263974A
- Authority
- JP
- Japan
- Prior art keywords
- work
- station
- processing
- jig
- transfer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Feeding Of Workpieces (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は工作機械用ワーク移
載装置及び工作機械のワーク移載方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a work transfer device for a machine tool and a method for transferring a work of a machine tool.
【0002】[0002]
【従来の技術】ワークの移載装置としては、例えば、
特開平2−185341号公報「パレット交換装置付き
工作機械」、特公昭60−5417号「工作機械にお
ける治具台装置」、ワークの加工ステーションと着脱
ステーションとを設けたものが知られている。2. Description of the Related Art As a work transfer device, for example,
Japanese Patent Application Laid-Open No. Hei 2-185341, "Machine Tool with Pallet Changer", Japanese Patent Publication No. Sho 60-5417, "Jig Stand Device for Machine Tool", and a machine provided with a work processing station and a work attaching / detaching station are known.
【0003】上記技術は、複数台の工作機械を据付け
る場合に据付けスペースが少なくて済むようにしたパレ
ット交換装置を有する工作機械に関するものであり、同
公報の第3図に示される通り、コラム12の前方のワー
クテーブル20上に載せたワークパレット22と、ワー
クテーブル20上に設けたパレット交換位置Aと、この
パレット交換位置Aのコラム12から離れる側に設けた
パレット待機位置Bと、このパレット待機位置Bのコラ
ム12から離れる側に配置したパレットマガジン26に
設けたパレット搬出入位置Cと、ワークパレット22を
パレット交換位置A〜パレット待機位置B間で移動させ
るパレット交換アーム29とを備えるものである。[0003] The above technique relates to a machine tool having a pallet changing device which requires a small installation space when a plurality of machine tools are installed. As shown in FIG. A work pallet 22 placed on a work table 20 in front of the pallet 12, a pallet change position A provided on the work table 20, a pallet standby position B provided on the side of the pallet change position A away from the column 12, and It is provided with a pallet loading / unloading position C provided on a pallet magazine 26 disposed on a side of the pallet standby position B away from the column 12, and a pallet exchange arm 29 for moving the work pallet 22 between the pallet exchange position A and the pallet standby position B. Things.
【0004】上記技術は、治具台と搬送部材とを係合
可能な係合爪部材を昇降テーブルの上下動に連動させて
係合位置と係合解除位置とに切換可能とするものであ
り、同公報の第1図に示される通り、工作機械の基台2
上にワークaを載せた加工ステーションAと、この加工
ステーションAの両側に設けたワーク着脱ステーション
B,Bと、これら加工ステーションA、ワーク着脱ステ
ーションB,B間を搬送手段5で移動可能な治具台3,
3とを備えるものである。[0004] In the above-mentioned technique, an engaging claw member capable of engaging a jig table and a conveying member can be switched between an engaging position and a disengaging position by interlocking with the vertical movement of a lifting table. , As shown in FIG. 1 of the publication,
A work station A on which a work a is placed, work attachment / detachment stations B provided on both sides of the work station A, and a jig movable between the work station A and the work attachment / detachment stations B by the transfer means 5. Table 3
3 is provided.
【0005】上記技術は、図17に説明するワーク移
載装置である。図17(a)〜(f)は従来のワーク移
載装置の構成、作用を説明する模式図であり、図では、
未加工のワークWにはWに丸を付け、加工済みのワーク
WにはWに二重丸を付ける。(a)において、ワーク移
載装置100は、ワークWを加工する加工ステーション
101と、ワークWを外部から載せたり、外部へ取外し
たりする着脱ステーション102と、ワークWを運ぶた
めに加工ステーション101及び着脱ステーション10
2間に移動可能に設けた治具台103とからなる。The above technique is a work transfer device described in FIG. FIGS. 17A to 17F are schematic diagrams illustrating the configuration and operation of a conventional work transfer device.
The unprocessed work W is rounded, and the processed work W is double circled. 1A, a work transfer apparatus 100 includes a processing station 101 for processing a work W, a detachment station 102 for mounting and removing the work W from outside, and a processing station 101 for carrying the work W. Removal station 10
And a jig table 103 movably provided between the two.
【0006】まず、着脱ステーション102に位置する
治具台103に未加工のワークWを載せる。(b)にお
いて、着脱ステーション102から加工ステーション1
01へ治具台103に載せたワークWを移動する。
(c)において、加工ステーション101にてワークW
を加工する。[0006] First, an unprocessed work W is placed on a jig table 103 located at the attachment / detachment station 102. In (b), from the attachment / detachment station 102 to the processing station 1
The workpiece W placed on the jig table 103 is moved to 01.
In (c), the work W is
To process.
【0007】(d)において、加工ステーション101
から着脱ステーション102へ加工済みのワークWを移
動する。(e)において、着脱ステーション102の治
具台103からワークWを取外す。(f)において、着
脱ステーション102の治具台103に別の未加工のワ
ークWを載せる。更にワークWの加工を続ける場合は、
(b)から繰返す。In (d), the processing station 101
Then, the processed workpiece W is moved to the attaching / detaching station 102. In (e), the work W is removed from the jig table 103 of the attachment / detachment station 102. In (f), another unprocessed work W is placed on the jig table 103 of the attachment / detachment station 102. To continue processing the workpiece W,
Repeat from (b).
【0008】[0008]
【発明が解決しようとする課題】上記では、ワークパ
レット22を移動させるものとして、パレット交換アー
ム29と、パレット待機位置B〜パレット搬出入位置C
間の移動装置(不図示)と、パレット搬出入位置Cへの
移動を行うパレットマガジン26とが必要になり、装置
構成が複雑になるという不都合がある。In the above description, the pallet exchange arm 29, the pallet standby position B to the pallet loading / unloading position C are used to move the work pallet 22.
A moving device (not shown) between them and a pallet magazine 26 for moving to the pallet carry-in / out position C are required, and there is a disadvantage that the device configuration becomes complicated.
【0009】上記では、2つのワーク着脱ステーショ
ンB,Bを備えるので、ワークaを着脱するために作業
者がこれらステーションB,B間を往復しなければなら
ず、作業者の負担が大きくなるという不都合がある。上
記では、着脱ステーション102でワークWを外部か
ら治具台103に載せてからワークWを外部へ取外すま
での加工のサイクル時間が多くかかり、このサイクル時
間を更に短縮することが望まれている。そこで、本発明
の目的は、装置構成が単純で、且つ作業者の負担を軽減
するとともに、加工のサイクル時間を短縮することので
きる工作機械のワーク移載装置及びワーク移載方法を提
供することにある。In the above, since two work attaching / detaching stations B, B are provided, the worker has to reciprocate between these stations B, B in order to attach / detach the work a, which increases the burden on the worker. There are inconveniences. In the above description, a long cycle time is required for processing from mounting the work W to the jig table 103 from the outside at the attachment / detachment station 102 to removing the work W to the outside, and it is desired to further reduce the cycle time. Therefore, an object of the present invention is to provide a work transfer device and a work transfer method for a machine tool, which have a simple device configuration, can reduce a burden on an operator, and can shorten a processing cycle time. It is in.
【0010】[0010]
【課題を解決するための手段】上記目的を達成するため
に本発明の請求項1は、工作機械にてワークを加工する
ワーク加工ステーションと、外部へ受け渡すワークを載
せる若しくは外部から受けとったワークを載せるために
ワーク加工ステーションに臨む位置に設けたワーク授受
ステーションと、ワーク加工ステーションとワーク授受
ステーションとを結ぶワークの第1の動線に直交する第
2の動線上に且つワーク授受ステーションの両側に各々
配置した第1・第2ワーク待機ステーションと、第1・
第2の動線上をワークを移動させる第1・第2のワーク
移動手段とでワーク移載装置を構成する。In order to achieve the above object, a first aspect of the present invention is a work processing station for processing a work by a machine tool, and a work on which a work to be transferred to the outside is placed or received from the outside. A work transfer station provided at a position facing the work processing station for mounting the work, and a second flow line orthogonal to a first flow line of the work connecting the work processing station and the work transfer station, and on both sides of the work transfer station. First and second work standby stations respectively arranged in the first and second work stations.
The first and second work moving means for moving the work on the second flow line constitute a work transfer device.
【0011】外部から未加工の第1のワークをワーク授
受ステーションに載せ、この未加工品を第1のワーク移
動手段で第1の動線上をワーク加工ステーションへ移動
して加工を開始し、空いたワーク授受ステーションへ未
加工の第2のワークを載せ、この未加工品を第2のワー
ク移動手段で第2の動線上を第1ワーク待機ステーショ
ンへ移動し、空いたワーク授受ステーションへ第1の動
線上を第1のワーク移動手段で加工済みの第1のワーク
を移動し、次に、加工済みの第1のワーク及び未加工の
第2のワークを第2のワーク移動手段で第2の動線上を
同時に移動することで、加工済みの第1のワークを第2
ワーク待機ステーションへ、未加工の第2のワークをワ
ーク授受ステーションへ移動し、この第2のワークを第
1のワーク移動手段で第1の動線上をワーク加工ステー
ションへ移動して加工を開始し、空になったワーク授受
ステーションへ加工済みの第1のワークを戻し、この第
1のワークを外部へ移動し、空いたワーク授受ステーシ
ョンへ外部から未加工の第3のワークを載せることで、
順次ワークを加工する。An unprocessed first work is placed on the work transfer station from the outside, and the unprocessed product is moved to the work processing station on the first flow line by the first work moving means, and the work is started. The unprocessed second work is placed on the work transfer station, and the unprocessed product is moved on the second flow line to the first work standby station by the second work moving means, and the first work is transferred to the empty work transfer station. The first work that has been processed is moved by the first work moving means on the flow line, and then the first work that has been processed and the second work that has not been processed are moved by the second work moving means to the second work. By moving simultaneously on the flow line of
The unprocessed second work is moved to the work waiting station, the work is transferred to the work transfer station, and the second work is moved to the work processing station on the first flow line by the first work moving means to start processing. Returning the processed first work to the empty work transfer station, moving the first work to the outside, and placing an unprocessed third work from the outside on the vacant work transfer station,
Work is processed sequentially.
【0012】ワークの移動手段として、第1・第2のワ
ーク移動手段だけであり、設備構成を簡素化することが
できる。また、ワーク授受ステーションが1ヵ所のみで
あり、ワーク授受のために作業者が移動することがな
く、作業者の負担を軽減することができる。更に、第1
・第2ワーク待機ステーションを設けたことで、ワーク
を加工中に加工済みのワークを外部へ受け渡すために待
機ステーションに待機させたり、次の未加工のワークを
加工するために待機ステーションに待機させたりするこ
とができ、ワーク加工から次のワーク加工までの1サイ
クルの時間内からワーク授受時間を省くことができ、ワ
ーク加工ステーション及びとワーク授受ステーションし
か持たない工作機械でワーク加工時間にワーク授受の時
間が含まれるのに比較して上記1サイクルの時間を短縮
することができる。Only the first and second work moving means are used as the work moving means, so that the equipment configuration can be simplified. Further, since there is only one work transfer station, the worker does not move to transfer the work, and the burden on the worker can be reduced. Furthermore, the first
・ By providing the second work standby station, the work is processed and the processed work is transferred to the outside to be transferred to the outside, or the standby work is performed to process the next unprocessed work. The work transfer time can be omitted from the time of one cycle from the work processing to the next work processing, and the work processing time can be reduced with the work processing station and the machine tool having only the work transfer station. The time of the one cycle can be reduced as compared with the time of the exchange.
【0013】請求項2は、工作機械の加工ステーション
と、この加工ステーションの手前に設けた外部へのワー
クのワーク授受ステーションと、このワーク授受ステー
ションの左右に設けたワーク待機ステーションとから各
ステーションへワークを移載するときに、外部から第1
の未加工品であるワークを授受ステーションに載せ、こ
の第1の未加工品を加工ステーションへ移動して加工を
開始し、空いたワーク授受ステーションへ第2の未加工
品であるワークを載せ、この第2の未加工品を一方のワ
ーク待機ステーションへ移動し、空いたワーク授受ステ
ーションへ第1の加工品であるワークを移動し、次に、
第1の加工品及び第2の未加工品を同時に移動すること
で、第1の加工品を他方のワーク待機ステーションへ、
第2の未加工品をワーク授受ステーションへ移動し、こ
の第2の未加工品を加工ステーションへ移動して加工を
開始し、空になったワーク授受ステーションへ第1の加
工品を戻し、この第1の加工品を外部へ移動し、空いた
ワーク授受ステーションへ外部から第3の未加工品であ
るワークを載せることで、順次ワークを加工する。According to a second aspect of the present invention, each of the processing stations of a machine tool, a work transfer station provided outside of the work station, and a work standby station provided on the left and right sides of the work transfer station are connected to the respective stations. When transferring the work, the first
The first unprocessed product is placed on the transfer station, the first unprocessed product is moved to the processing station to start processing, and the second unprocessed work is mounted on the empty work transfer station. The second unprocessed product is moved to one of the work standby stations, and the work, which is the first processed product, is moved to an empty work transfer station.
By simultaneously moving the first processed product and the second unprocessed product, the first processed product is transferred to the other work standby station.
The second unprocessed product is moved to the work transfer station, the second unprocessed product is moved to the work station, processing is started, and the first processed product is returned to the empty work transfer station. The first workpiece is moved to the outside, and a third workpiece, which is an unprocessed workpiece, is placed on an empty workpiece transfer station from the outside to sequentially process the workpieces.
【0014】ワーク加工ステーションでワークを加工中
に、ワーク授受ステーションで治具台から加工品である
ワークを取外し、次の未加工品であるワークを取付ける
ので、ワーク加工から次のワーク加工までの1サイクル
の時間内からワーク授受時間を省くことができ、ワーク
加工ステーション及びとワーク授受ステーションしか持
たない工作機械でワーク加工時間にワーク授受の時間が
含まれるのに比較して上記1サイクルの時間を短縮する
ことができる。While the work is being processed at the work processing station, the work, which is a processed product, is removed from the jig stand at the work transfer station and the next unprocessed work is attached. The work transfer time can be omitted from the time within one cycle, and the work transfer time is included in the work processing time in a work machine and a machine tool having only the work transfer station compared to the work transfer time. Can be shortened.
【0015】[0015]
【発明の実施の形態】本発明の実施の形態を添付図に基
づいて以下に説明する。なお、図面は符号の向きに見る
ものとする。図1は本発明に係るワーク移載装置を組込
んだホーニング加工装置の斜視図であり、工作機械とし
てのホーニング加工装置1は、コラム2の前面に上下動
可能に吊り下げたスライドベース3と、このスライドベ
ース3に取付けた主軸台4及び主軸台4の主軸5を駆動
する駆動モータ6と、ホーニング加工のための複数の砥
石を備えたホーンヘッド7と、このホーンヘッド7を上
下往復動させるためのクランク機構8と、上記スライド
ベース3を上下方向(図のZ軸方向)に移動可能なZ軸
シリンダ11と、コラム2の手前側に設置した基台12
と、この基台12の側方に設けたX軸モータ13と、こ
のX軸モータ13でX軸方向に移動可能なX軸スライド
テーブル14と、以下に説明する治具台16(図2参
照)、加工ステーション20(図2参照)、移載手段3
0、ワーク着脱ステーション40(図4参照)、待機ス
テーション50(図7参照)、搬送手段60(図8参
照)で構成するワーク移載装置80(図8参照)とから
なる。Embodiments of the present invention will be described below with reference to the accompanying drawings. The drawings should be viewed in the direction of reference numerals. FIG. 1 is a perspective view of a honing apparatus 1 incorporating a work transfer apparatus according to the present invention. The honing apparatus 1 as a machine tool includes a slide base 3 suspended vertically on a front surface of a column 2 so as to be vertically movable. A drive motor 6 for driving a headstock 4 attached to the slide base 3 and a spindle 5 of the headstock 4, a horn head 7 having a plurality of grinding wheels for honing, and a vertical reciprocating motion of the horn head 7 A crank mechanism 8 for moving the slide base 3, a Z-axis cylinder 11 capable of moving the slide base 3 in the vertical direction (Z-axis direction in the drawing), and a base 12 installed on the near side of the column 2.
And an X-axis motor 13 provided on the side of the base 12, an X-axis slide table 14 movable in the X-axis direction by the X-axis motor 13, and a jig table 16 described below (see FIG. 2). ), Processing station 20 (see FIG. 2), transfer means 3
0, a work mounting / dismounting station 40 (see FIG. 4), a standby station 50 (see FIG. 7), and a work transfer device 80 (see FIG. 8) constituted by a transport means 60 (see FIG. 8).
【0016】加工ステーション20は、上記X軸スライ
ドテーブル14に設けたチルト用モータ21と、このチ
ルト用モータ21でY軸方向に傾斜可能なチルトテーブ
ル22と、このチルトテーブル22に昇降可能に設けた
治具台テーブル23とからなる。The machining station 20 is provided with a tilt motor 21 provided on the X-axis slide table 14, a tilt table 22 which can be tilted in the Y-axis direction by the tilt motor 21, and a vertically movable table provided on the tilt table 22. And a jig table 23.
【0017】図2は本発明に係るワーク移載装置を組込
んだホーニング加工装置の側面図であり、加工ステーシ
ョン20のチルトテーブル22上に治具台テーブル23
を設け、この治具台テーブル23でワークを載せるため
の治具台16を昇降し、この治具台16を加工ステーシ
ョン20とワーク着脱ステーション40(図4参照)と
の間に移動させるための第1のワーク移動手段である移
載手段30をコラム2に設けたことを示す。FIG. 2 is a side view of a honing apparatus incorporating the work transfer apparatus according to the present invention, and a jig table 23 is provided on a tilt table 22 of a processing station 20.
The jig table 16 for placing a work on the jig table 23 is moved up and down, and the jig table 16 is moved between the processing station 20 and the work attaching / detaching station 40 (see FIG. 4). This shows that the transfer means 30 as the first work moving means is provided in the column 2.
【0018】チルトテーブル22は、治具台テーブル2
3が下降したときに治具台16の下面に設けた凹部(不
図示)に嵌合する凸部22a,22bを有する。移載手
段30は、シリンダ31と、このシリンダ31内のピス
トン(不図示)に連結したロッド32と、このロッド3
2の先端に設けた爪部33と、ロッド32を支持するロ
ッドガイド34とからなる。なお、35はロッド32を
補助するための補助ロッド、36は加工ステーション2
0に設けたレール(不図示)及び後述する中間テーブル
81(図4参照)上を滑る滑り部材である。The tilt table 22 is a jig table 2
The projection 3 has projections 22a and 22b that fit into recesses (not shown) provided on the lower surface of the jig base 16 when the projection 3 is lowered. The transfer means 30 includes a cylinder 31, a rod 32 connected to a piston (not shown) in the cylinder 31,
2 and a rod guide 34 for supporting the rod 32. In addition, 35 is an auxiliary rod for assisting the rod 32, and 36 is the processing station 2
0 and a sliding member that slides on an intermediate table 81 (see FIG. 4) described later.
【0019】爪部33は、チルトテーブル22の治具台
テーブル23が上昇した時に治具台16に設けた上方凹
部16a(図5参照)に嵌合するものであり、治具台1
6に移載手段30を結合するものである。移載手段30
が治具台16と結合した状態で、移載手段30は、治具
台16を加工ステーション20とワーク着脱ステーショ
ン40(図4参照)との間を移動させることができる。The claw portion 33 fits into the upper concave portion 16a (see FIG. 5) provided on the jig base 16 when the jig base table 23 of the tilt table 22 is raised.
The transfer means 30 is connected to the transfer means 6. Transfer means 30
The transfer means 30 can move the jig table 16 between the processing station 20 and the work attaching / detaching station 40 (see FIG. 4) in a state where the jig table 16 is connected to the jig table 16.
【0020】以上に述べたチルトテーブル及び移載手段
の作用を次に説明する。図3(a)〜(c)は本発明に
係るチルトテーブル及び移載手段の作用を説明する側面
図であり、(a)は治具台テーブルの上昇時、(b)は
治具台テーブルの下降時、(c)は治具台テーブルの傾
斜時の状態を示す。(a)において、治具台テーブル2
3が上昇時、即ち治具台16をワーク着脱ステーション
40(図4参照)から加工ステーション20に引き込ん
だ状態では、治具台16の端部に設けた凹部16aに移
載手段30の爪部33が嵌合している。The operation of the tilt table and the transfer means described above will now be described. 3A to 3C are side views for explaining the operation of the tilt table and the transfer means according to the present invention. FIG. 3A is a view when the jig table is raised, and FIG. (C) shows the state when the jig table is inclined. In (a), the jig table 2
3 is raised, that is, when the jig base 16 is pulled into the processing station 20 from the work attaching / detaching station 40 (see FIG. 4), 33 are fitted.
【0021】(b)において、治具台テーブル23が下
降すると、治具台テーブル23の下面に設けた凹部(不
図示)にチルトテーブル22の凸部22a,22bが嵌
合する。また、治具台テーブル23の下降により治具台
16の上方凹部16a(図3(a)参照)と移載手段3
0の爪部33との嵌合が解除される。ここで、移載手段
30のロッド32はコラム2側に後退する。In FIG. 2B, when the jig table 23 is lowered, the projections 22a and 22b of the tilt table 22 are fitted into recesses (not shown) provided on the lower surface of the jig table 23. The lowering of the jig table 23 causes the upper recess 16a (see FIG. 3A) of the jig table 16 and the transfer means 3 to move.
The engagement with the claw portion 33 of No. 0 is released. Here, the rod 32 of the transfer means 30 retreats to the column 2 side.
【0022】(c)において、治具台16に取付けたワ
ークWが、例えばV型エンジン用シリンダブロックであ
る場合は、シリンダボアCBの軸線を主軸5(図1参
照)の軸線と一致するようにチルトテーブル22を回転
軸Rを中心に回転させて傾斜させる。この時、治具台1
6の下面をチルトテーブル22の凸部22a,22bと
嵌合させているので、治具台16は滑り落ちない。In (c), when the work W mounted on the jig base 16 is, for example, a cylinder block for a V-type engine, the axis of the cylinder bore CB is aligned with the axis of the main shaft 5 (see FIG. 1). The tilt table 22 is rotated around the rotation axis R and tilted. At this time, jig stand 1
6 is fitted to the projections 22a and 22b of the tilt table 22, the jig base 16 does not slide down.
【0023】上記したように、治具台テーブル23を上
昇させることにより治具台16を移載手段30に結合
し、治具台テーブル23を下降させることにより治具台
16をチルトテーブル22に結合する構成にしたこと
で、治具台16と移載手段30との結合及び治具台16
とチルトテーブル22との結合を治具台テーブル23の
昇降で容易に且つ迅速に切換えることができ、加工ステ
ーション20にワークWが到着してからワーク加工まで
の時間及びワーク加工後からワークWが加工ステーショ
ン20を離れるまでの時間を短縮することができる。As described above, the jig table 16 is connected to the transfer means 30 by raising the jig table 23, and the jig table 16 is moved to the tilt table 22 by lowering the jig table 23. With the configuration for coupling, the coupling between the jig table 16 and the transfer means 30 and the jig table 16
And the tilt table 22 can be easily and quickly switched by raising and lowering the jig table 23. The time from when the work W arrives at the processing station 20 to the work processing and the work W after the work processing are performed. The time required to leave the processing station 20 can be reduced.
【0024】図4は本発明に係るワーク移載装置の側面
図であり、ワーク移載装置80のワーク授受ステーショ
ンであるワーク着脱ステーション40は、外部へ受け渡
すワークを載せる若しくは外部から受けとったワークを
載せるために加工ステーション20のコラム2(図2参
照)とは反対側に中間テーブル81を介して配置したも
のであり、治具台16を後述する昇降シリンダ41で昇
降可能な昇降テーブル42と、この昇降テーブル42の
位置確認手段43と、昇降テーブル42上のワークの有
無を確認するためのワーク確認手段44と、治具台16
にクランプしたワークのクランプを解除するためのクラ
ンプ解除手段45とからなる。FIG. 4 is a side view of the work transfer apparatus according to the present invention. The work transfer station 80 of the work transfer apparatus 80 has a work attaching / detaching station 40 on which a work to be transferred is placed or received from the outside. Is placed on the opposite side of the column 2 (see FIG. 2) of the processing station 20 via an intermediate table 81, and the jig base 16 can be moved up and down by an elevating cylinder 41 which will be described later. A position confirming means 43 of the elevating table 42, a work confirming means 44 for confirming the presence or absence of a work on the elevating table 42,
And a clamp releasing means 45 for releasing the clamp of the work clamped on the workpiece.
【0025】位置確認手段43は、シリンダ43aと、
このシリンダ43aで上下動させるロッド部材43b
と、このロッド部材43bを支持するガイド部材43c
とからなり、治具台16の下面に形成した基準穴16b
にロッド部材43bの先端43dを嵌合することで治具
台16bの位置を確認するものである。ワーク確認手段
44は、シリンダ44aと、このシリンダ44a内を上
下動する可動部材44bとからなる。The position confirmation means 43 includes a cylinder 43a,
A rod member 43b which is moved up and down by the cylinder 43a.
And a guide member 43c for supporting the rod member 43b.
And a reference hole 16b formed on the lower surface of the jig base 16.
The position of the jig base 16b is confirmed by fitting the tip 43d of the rod member 43b to the jig base 16b. The work confirmation unit 44 includes a cylinder 44a and a movable member 44b that moves up and down in the cylinder 44a.
【0026】上記したワーク着脱ステーション40にお
いて、外部へワークを受け渡す若しくは外部からワーク
を受けとる手段として、例えば、ワークを把持して、上
方又は図の左方へ排出するアンローダー、若しくは上方
又は図の左方から供給するためのローダーが好適であ
る。In the above-mentioned work attaching / detaching station 40, as a means for transferring the work to the outside or receiving the work from the outside, for example, an unloader for grasping the work and discharging it upward or to the left in the drawing, Is preferred.
【0027】図5(a),(b)は本発明に係る治具台
とワーク移動手段との結合を説明する側面図であり、
(a)は昇降テーブルが下降した状態、(b)は昇降テ
ーブルが上昇した状態を示す。(a)において、治具台
16は側面に下方凹部16cを有する。このワーク着脱
ステーション40では、治具台16が下降した時に治具
台16の下方凹部16cと搬送手段60の凸部61とが
嵌合し、搬送手段60によって治具台16が移動可能と
なる。この時、治具台16の上方凹部16aと移載手段
30の爪部33とは嵌合していない。FIGS. 5A and 5B are side views for explaining the connection between the jig table and the work moving means according to the present invention.
(A) shows a state where the lifting table is lowered, and (b) shows a state where the lifting table is raised. In (a), the jig base 16 has a lower recess 16c on the side surface. In the work attachment / detachment station 40, when the jig table 16 is lowered, the lower concave portion 16c of the jig table 16 and the projection 61 of the transfer means 60 are fitted, and the jig table 16 can be moved by the transfer means 60. . At this time, the upper concave portion 16a of the jig base 16 and the claw portion 33 of the transfer means 30 are not fitted.
【0028】(b)において、治具台16が上昇した時
には治具台16の下方凹部16cと搬送手段60の凸部
61との嵌合が解除されるとともに、治具台16の上方
凹部16aと移載手段30の爪部33とが嵌合し、移載
手段30によって治具台16が移動可能となる。このよ
うに、ワーク着脱ステーション40では、昇降テーブル
42(図4参照)の昇降によって治具台16と移載手段
30及び治具台16と搬送手段60の結合を迅速に切換
えることができる。In FIG. 3B, when the jig base 16 is raised, the fitting between the lower concave part 16c of the jig base 16 and the convex part 61 of the conveying means 60 is released, and the upper concave part 16a of the jig base 16 is released. And the claw 33 of the transfer means 30 are fitted to each other, and the jig base 16 can be moved by the transfer means 30. As described above, in the work attachment / detachment station 40, the coupling between the jig table 16 and the transfer unit 30 and the coupling between the jig table 16 and the transfer unit 60 can be quickly switched by elevating the elevating table 42 (see FIG. 4).
【0029】以上に述べた移載手段30の作用を次に説
明する。図6(a),(b)は本発明に係る移載手段の
作用を説明する側面図であり、(a)は移載手段のロッ
ドを伸ばした状態、(b)はロッドを引込んだ状態を示
す。(a)において、ワーク着脱ステーション40に治
具台16が位置する時に移載手段30のロッド32を伸
ばしておき、昇降テーブル42により治具台16を上昇
させると、図5(b)に示したように、治具台16と移
載手段30とが結合する。そして、移載手段30のシリ
ンダ31(図2参照)を作動させてロッド32を引込む
ことで、(b)に示すように、ワーク着脱ステーション
40から治具台16を加工ステーション20へ移動する
ことができる。The operation of the transfer means 30 described above will now be described. 6 (a) and 6 (b) are side views for explaining the operation of the transfer means according to the present invention, where (a) is a state where the rod of the transfer means is extended, and (b) is a state where the rod is retracted. Indicates the status. 5A, when the jig base 16 is positioned at the work attaching / detaching station 40, the rod 32 of the transfer means 30 is extended and the jig base 16 is raised by the elevating table 42, as shown in FIG. As described above, the jig base 16 and the transfer means 30 are connected. Then, by operating the cylinder 31 (see FIG. 2) of the transfer means 30 and retracting the rod 32, the jig table 16 is moved from the work attaching / detaching station 40 to the processing station 20 as shown in FIG. Can be.
【0030】また、この図6(b)の状態から移載手段
30のシリンダ31を作動させてロッド32を押出すこ
とで、図6(a)のように、加工ステーション20から
治具台16をワーク着脱ステーション40へ移動するこ
とができる。上記したように、ホーニング加工装置1
(図2参照)側、即ちホーニング加工装置1のコラム2
(図2参照)に移載手段30を設けたことで、ホーニン
グ加工装置1の前方に移載手段を設けるよりもホーニン
グ加工装置1の前方のスペースを有効に利用することが
できる。Further, by operating the cylinder 31 of the transfer means 30 to push out the rod 32 from the state of FIG. 6B, the jig table 16 is moved from the processing station 20 as shown in FIG. Can be moved to the work attaching / detaching station 40. As described above, the honing machine 1
(See FIG. 2), ie, the column 2 of the honing machine 1
By providing the transfer means 30 in (see FIG. 2), the space in front of the honing apparatus 1 can be used more effectively than providing the transfer means in front of the honing apparatus 1.
【0031】図7は本発明に係るワーク移載装置の正面
図であり、ワーク移載装置80は、ワーク着脱ステーシ
ョン40の両側に待機ステーション50R,50Lを有
する。なお、この図で右側の待機ステーション50Rの
構成部品の符号にはRを付け、左側の待機ステーション
50Lの構成部品の符号にはLを付ける。また、待機ス
テーション50R,50Lは勝手違いの構造であり、詳
細説明は待機ステーション50Rのみ行う。FIG. 7 is a front view of the work transfer device according to the present invention. The work transfer device 80 has standby stations 50R and 50L on both sides of the work attachment / detachment station 40. In this figure, the reference numeral of the component of the standby station 50R on the right is denoted by R, and the reference numeral of the component of the standby station 50L on the left is denoted by L. The standby stations 50R and 50L have different structures, and the detailed description will be made only for the standby station 50R.
【0032】待機ステーション50Rは、基台82に取
付けた支柱51R,51Rと、この支柱51R,51R
の上部に取付けた複数のローラ52R…(…は複数個を
示す。以下同様。)を有する搬送台53Rと、この搬送
台53Rの端部に取付けたリミットスイッチ54Rとか
らなる。治具台16は、搬送台53R,53Lのローラ
52R…,52L…及びワーク着脱ステーション40に
設けた搬送台46のローラ47…に載って待機ステーシ
ョン50R,50Lとワーク着脱ステーション40との
間を移動することができる。The standby station 50R includes columns 51R, 51R mounted on a base 82, and columns 51R, 51R.
(... denotes a plurality of rollers, the same applies hereinafter.) And a limit table 54R mounted at an end of the transfer table 53R. The jig table 16 is placed on the rollers 52R, 52L of the transfer tables 53R, 53L and the rollers 47 of the transfer table 46 provided in the work mounting / dismounting station 40, and moves between the standby stations 50R, 50L and the work mounting / dismounting station 40. You can move.
【0033】図8は本発明のワーク移載装置の平面図で
あり、ワーク着脱ステーション40及び2つの待機ステ
ーション50R,50Lの後方に搬送手段60を配置し
たことを示す。(図5(a),(b)も参照) 搬送手段60は、第2のワーク移動手段であり、基台8
2に取付けた両端のベース部62,63と、このベース
部62,63間に渡した上下2本のレール64,64
(1本は省略。図5(a)参照)と、これらのレール6
4,64を移動可能な移動体65,66,67と、これ
らの移動体65,66,67を一体的に連結する連結部
材68と、移動体65,66,67を移動させるために
レール64,64の間に平行に配置し移動体65にねじ
結合したボールねじ69(図5(a)参照)とからな
る。FIG. 8 is a plan view of the work transfer device of the present invention, and shows that the transfer means 60 is disposed behind the work attaching / detaching station 40 and the two standby stations 50R, 50L. (See also FIGS. 5 (a) and 5 (b).) The transfer means 60 is a second work moving means,
2 and two upper and lower rails 64, 64 extending between the base portions 62, 63.
(One is omitted. See FIG. 5 (a).)
4, 64, a moving member 65, 66, 67, a connecting member 68 for integrally connecting the moving bodies 65, 66, 67, and a rail 64 for moving the moving bodies 65, 66, 67. , 64 and a ball screw 69 (see FIG. 5A) screwed to the moving body 65 in parallel.
【0034】ベース部62,63は、移動体65,67
のストッパ62a,63aを有する。移動体66,67
は、治具台16に結合するための前述した凸部61,6
1を有する。移動体65は、基台82に取付けた近接セ
ンサ83,83に検知される検出片65aを有する。ボ
ールねじ69は、図示せぬモータ等の駆動手段で回転す
るものである。The bases 62 and 63 are movable bodies 65 and 67
Have stoppers 62a and 63a. Moving bodies 66, 67
Are the above-mentioned convex portions 61 and 6 for coupling to the jig table 16.
One. The moving body 65 has a detection piece 65a that is detected by the proximity sensors 83, 83 attached to the base 82. The ball screw 69 is rotated by driving means such as a motor (not shown).
【0035】以上に述べた搬送手段60の作用を次に説
明する。図9(a),(b)は本発明に係る搬送手段の
作用を説明する平面図であり、(a)は治具台がワーク
着脱ステーションと右側の待機ステーションに位置する
状態、(b)は治具台がワーク着脱ステーションと左側
の待機ステーションに位置する状態を示す。(a)にお
いて、ワーク着脱ステーション40と待機ステーション
50Rに治具台16M,16N(ここでは、右側の治具
台を16M、左側の治具台を16Nとする。)が位置す
る時に、昇降テーブル42(図7参照)により治具台1
6Nを下降させると、治具台16Nの下方凹部16cと
搬送手段60の凸部61とが嵌合し、図9(a)の治具
台16Nと搬送手段60の移動体67とが結合する。ま
た、待機ステーション50Rの治具台16Mの下方凹部
16cは搬送手段60の移動体66の凸部61と嵌合
し、治具台16Mと移動体66とが結合している。The operation of the conveying means 60 described above will now be described. 9 (a) and 9 (b) are plan views for explaining the operation of the transfer means according to the present invention. FIG. 9 (a) shows a state where the jig table is located at the work attaching / detaching station and the right standby station, and FIG. Indicates a state in which the jig table is located at the work attaching / detaching station and the left standby station. In (a), when the jig tables 16M and 16N (here, the right jig table is 16M and the left jig table is 16N) are located at the work attaching / detaching station 40 and the standby station 50R, the lifting table is set. 42 (see FIG. 7), the jig table 1
When the 6N is lowered, the lower concave portion 16c of the jig table 16N and the convex portion 61 of the transporting means 60 are fitted, and the jig table 16N and the moving body 67 of the transporting means 60 in FIG. . The lower concave portion 16c of the jig table 16M of the standby station 50R is fitted with the convex section 61 of the moving body 66 of the transport means 60, and the jig table 16M and the moving body 66 are connected.
【0036】この状態で、搬送手段60の駆動手段によ
りボールねじ69(図5(a)参照)を回転させ、
(b)に示すように、移動体65,66,67を一体的
に図の左方に移動させ、治具台16Mをワーク着脱ステ
ーション40へ、治具台16Nを待機ステーション50
Lへ同時に移動させる。In this state, the ball screw 69 (see FIG. 5A) is rotated by the driving means of the conveying means 60,
As shown in (b), the moving bodies 65, 66, 67 are integrally moved to the left in the figure, the jig table 16M is moved to the work attaching / detaching station 40, and the jig table 16N is moved to the standby station 50.
To L simultaneously.
【0037】図10は本発明に係る治具台とワークとを
示す斜視図であり、治具台16にワーククランプ17…
(奥は省略)を設け、このワーククランプ17…でワー
クW、例えば、V型エンジンのエンジンブロックを固定
したことを示す。治具台16は、ワークWの下面に設け
たノックピン(不図示)を治具台16の上面に形成した
穴部(不図示)に嵌合させることでワークWの位置決め
を行い、且つ搬送を行うものである。従って、加工ステ
ーション20(図3(c)参照)にて、ワークWを加工
する場合に、治具台16をホーニング加工装置1(図1
参照)に位置決めすれば、ホーニング加工装置1のホー
ンヘッド7(図2参照)とワークWとが位置決めされる
ことになる。FIG. 10 is a perspective view showing a jig table and a work according to the present invention.
(The back is omitted), and indicates that the work W, for example, the engine block of the V-type engine is fixed by the work clamps 17. The jig base 16 positions the work W by fitting a knock pin (not shown) provided on the lower surface of the work W into a hole (not shown) formed on the upper surface of the jig base 16, and conveys the work W. Is what you do. Therefore, when the work W is processed at the processing station 20 (see FIG. 3C), the jig table 16 is connected to the honing processing apparatus 1 (FIG. 1).
), The horn head 7 (see FIG. 2) of the honing apparatus 1 and the workpiece W are positioned.
【0038】図11は本発明に係るクランプ解除手段の
斜視図であり、クランプ解除手段45は、治具台16
(図12(a)参照)に設けた被結合部16e(図12
(a)参照)に結合するずれ防止部材45aと、治具台
16の側面に開口した大径孔16f(図12(a)参
照)に挿入可能な作動油供給部材45bと、この作動油
供給部材45bを進退可能なシリンダ45cと、このシ
リンダ45cを支える基部45dと、この基部45dを
昇降可能なロッド45e,45eを備えた昇降装置45
f(図4参照)とからなる。ずれ防止部材45aは、突
部45g,45gを有し、この突部45g,45gを治
具台16の被係合部16dに挿入するものである。昇降
装置45fは、図4に示したように、昇降シリンダ45
hを有する。FIG. 11 is a perspective view of the clamp releasing means according to the present invention.
(See FIG. 12 (a)).
(See FIG. 12A), a hydraulic oil supply member 45b that can be inserted into a large-diameter hole 16f (see FIG. 12A) opened on the side surface of the jig base 16, and a hydraulic oil supply member 45b. A lifting / lowering device 45 including a cylinder 45c capable of moving the member 45b forward and backward, a base 45d supporting the cylinder 45c, and rods 45e, 45e capable of moving the base 45d up and down.
f (see FIG. 4). The displacement preventing member 45a has protrusions 45g, 45g, and inserts the protrusions 45g, 45g into the engaged portion 16d of the jig base 16. As shown in FIG. 4, the lifting / lowering device 45f includes a lifting / lowering cylinder 45.
h.
【0039】以上に述べたクランプ解除手段45の作用
を次に説明する。図12(a)〜(c)は本発明に係る
クランプ解除手段の作用を説明する断面図であり、
(a)はクランプ解除手段が下降した状態、(b)はク
ランプ解除手段が上昇した状態、(c)はクランプ解除
手段から治具台へ作動油を供給した状態を示す。(a)
において、ワーククランプ17は、シリンダ17aと、
このシリンダ17a内を移動可能なピストン17bと、
このピストン17bに固定したピストンロッド17c
と、このピストンロッド17cの端部に設けたクランプ
部17dと、ピストン17bを下方に押すためにシリン
ダ17a内に設けたスプリング17eとからなる。The operation of the above-described clamp releasing means 45 will now be described. FIGS. 12A to 12C are cross-sectional views illustrating the operation of the clamp release means according to the present invention.
(A) shows a state where the clamp releasing means is lowered, (b) shows a state where the clamp releasing means is raised, and (c) shows a state where hydraulic oil is supplied from the clamp releasing means to the jig base. (A)
, The work clamp 17 includes a cylinder 17a,
A piston 17b movable in the cylinder 17a,
A piston rod 17c fixed to the piston 17b
And a clamp 17d provided at the end of the piston rod 17c, and a spring 17e provided in the cylinder 17a to push the piston 17b downward.
【0040】また、治具台16は、側面に開けた大径孔
16fと、この大径孔16fに続いて、複数のワークク
ランプ17…の下部油室17fに連通する油路16gを
有する。図は、ワーククランプ17のスプリング17e
でクランプ部17dを介してワークWの端部を治具台1
6に押付けた状態を示す。ここで、16h,16j,1
6kはOリングである。(b)において、クランプ解除
手段45を上昇させると、治具台16の被結合部16e
にずれ防止部材45aが嵌合する。The jig base 16 has a large-diameter hole 16f formed in the side surface, and an oil passage 16g connected to the lower oil chamber 17f of the plurality of work clamps 17 following the large-diameter hole 16f. The figure shows the spring 17e of the work clamp 17.
And clamp the end of the work W via the clamp 17d to the jig base 1
6 shows the pressed state. Here, 16h, 16j, 1
6k is an O-ring. In (b), when the clamp releasing means 45 is raised, the coupled portion 16e of the jig base 16 is moved.
The slip prevention member 45a is fitted.
【0041】(c)において、治具台16の大径孔16
fにクランプ解除手段45の作動油供給部材45bを挿
入し、クランプ解除手段45側から治具台16の油路1
6gを介してワーククランプ17…の下部油室17f…
に作動油を供給する。そして、ワーククランプ17のピ
ストン17b及びクランプ部17dが上昇し、ワークW
のクランプを解除する。In (c), the large-diameter hole 16 of the jig table 16
f, the hydraulic oil supply member 45b of the clamp release means 45 is inserted, and the oil passage 1 of the jig base 16 is
6g, the lower oil chamber 17f of the work clamp 17 ...
Supply hydraulic oil to Then, the piston 17b and the clamp portion 17d of the work clamp 17 rise, and the work W
Release the clamp.
【0042】大径孔16fに作動油供給部材45bを挿
入する時及びクランプ解除手段45から油路16gに作
動油を供給する時に、ずれ防止部材45aにより、治具
台16の位置がずれるのを防止することができる。ここ
で、ワークWを再びクランプするには、作動油供給部材
45bからワーククランプ17への作動油の供給を停止
し、スプリング17e(図12(a)参照)の弾性力で
ピストン17bを押下げる。上記したように、クランプ
解除手段45により、ワークWの治具台16への着脱を
容易に且つ確実に行うことができる。When the hydraulic oil supply member 45b is inserted into the large-diameter hole 16f and when the hydraulic oil is supplied to the oil passage 16g from the clamp release means 45, the displacement of the jig table 16 is prevented from being shifted by the displacement prevention member 45a. Can be prevented. Here, in order to clamp the work W again, the supply of the working oil from the working oil supply member 45b to the work clamp 17 is stopped, and the piston 17b is pushed down by the elastic force of the spring 17e (see FIG. 12A). . As described above, the work piece W can be easily and reliably attached to and detached from the jig base 16 by the clamp release means 45.
【0043】以上に述べたワーク移載装置80の作用を
次に説明する。図13(a)〜(h)は本発明に係るワ
ーク移載装置の作用を説明する模式図(第1作用図)で
あり、順に説明する。 (a)ワーク移載装置80のワーク着脱ステーション4
0にある治具台16に未加工のワークL(図ではLに丸
を付けて未加工であることを示す。以下同様。)を載せ
る。 (b)ワーク着脱ステーション40の治具台16を移載
手段30(図6参照)加工ステーション20へ移動す
る。The operation of the work transfer device 80 described above will now be described. FIGS. 13A to 13H are schematic diagrams (first operation diagrams) for explaining the operation of the work transfer device according to the present invention, and will be described in order. (A) Work loading / unloading station 4 of work transfer device 80
An unprocessed work L (in the figure, L is rounded to indicate unprocessed, the same applies hereinafter) is placed on the jig base 16 at 0. (B) The jig table 16 of the work attaching / detaching station 40 is moved to the transfer means 30 (see FIG. 6) processing station 20.
【0044】(c)加工ステーション20の治具台16
を下降させ、チルトテーブル22(図3(c)参照)を
傾け、ワークLの加工を開始し、また、待機ステーショ
ン50Rの治具台16をワーク着脱ステーション40へ
移動する。 (d)ワーク着脱ステーション40の治具台16を上昇
させ、この治具台16に未加工のワークR(図ではRに
丸を付けて未加工であることを示す。以下同様。)を載
せる。 (e)ワーク着脱ステーション40の治具台16を下降
させる。(C) The jig table 16 of the processing station 20
Is lowered, the tilt table 22 (see FIG. 3C) is tilted, the processing of the work L is started, and the jig table 16 of the standby station 50R is moved to the work attaching / detaching station 40. (D) The jig table 16 of the work attachment / detachment station 40 is raised, and an unprocessed work R (R is rounded to indicate unprocessed in the figure; the same applies hereinafter) is placed on the jig table 16. . (E) The jig base 16 of the work attaching / detaching station 40 is lowered.
【0045】(f)ワーク着脱ステーション40の治具
台16を待機ステーション50Rに移動する。また、加
工ステーション20ワークLの加工が終了し、加工ステ
ーション20の治具台16を上昇させる。(図ではLに
二重丸をつけて加工済みであることを示す。以下同
様。) (g)加工ステーション20の治具台16をワーク着脱
ステーション40へ移動する。 (h)ワーク着脱ステーション40の治具台16を下降
させる。(F) The jig table 16 of the work attaching / detaching station 40 is moved to the standby station 50R. Further, the processing of the work L of the processing station 20 is completed, and the jig table 16 of the processing station 20 is raised. (In the drawing, a double circle is added to L to indicate that processing has been completed. The same applies to the following.) (G) The jig table 16 of the processing station 20 is moved to the work attaching / detaching station 40. (H) The jig table 16 of the work attaching / detaching station 40 is lowered.
【0046】図14(a)〜(h)は本発明に係るワー
ク移載装置の作用を説明する模式図(第2作用図)であ
り、図13(h)に続いて順に説明する。 (a)ワーク着脱ステーション40の治具台16を待機
ステーション50Lに移動すると同時に、待機ステーシ
ョン50Rの治具台16をワーク着脱ステーション40
へ移動する。 (b)ワーク着脱ステーション40の治具台16を上昇
させる。FIGS. 14A to 14H are schematic diagrams (second operation diagrams) for explaining the operation of the work transfer device according to the present invention, and will be described in order following FIG. 13H. (A) The jig base 16 of the work attaching / detaching station 40 is moved to the standby station 50L, and at the same time, the jig base 16 of the standby station 50R is moved to the work attaching / detaching station 40L.
Move to. (B) The jig table 16 of the work attaching / detaching station 40 is raised.
【0047】(c)ワーク着脱ステーション40の治具
台16を加工ステーション20へ移動する。 (d)加工ステーション20の治具台16を下降させ、
チルトテーブル22(図3(c)参照)を傾け、ワーク
Rの加工を開始し、また、待機ステーション50Lの治
具台16をワーク着脱ステーション40へ移動する。 (e)ワーク着脱ステーション40の治具台16を上昇
させ、クランプ解除手段45(図12(c)参照)でワ
ークLのクランプを解除し、加工済みのワークLを治具
台16から取外す。(C) The jig table 16 of the work attaching / detaching station 40 is moved to the processing station 20. (D) Lower the jig table 16 of the processing station 20,
The tilt table 22 (see FIG. 3C) is tilted to start processing the work R, and the jig table 16 of the standby station 50L is moved to the work attachment / detachment station 40. (E) The jig base 16 of the work attaching / detaching station 40 is raised, the clamp of the work L is released by the clamp releasing means 45 (see FIG. 12C), and the processed work L is removed from the jig base 16.
【0048】(f)ワーク着脱ステーション40の治具
台16に未加工のワークLを載せ、クランプする。 (g)ワーク着脱ステーション40の治具台16を下降
させる。 (h)ワーク着脱ステーション40の治具台16を待機
ステーション50Lに移動する。また、加工ステーショ
ン20のワークRの加工が終了し、加工ステーション2
0の治具台16を上昇させる。(F) The unprocessed work L is placed on the jig table 16 of the work attaching / detaching station 40 and clamped. (G) The jig table 16 of the work attaching / detaching station 40 is lowered. (H) The jig table 16 of the work attaching / detaching station 40 is moved to the standby station 50L. Further, the processing of the work R in the processing station 20 is completed, and the processing station 2
The jig table 16 of 0 is raised.
【0049】図15(a)〜(g)は本発明に係るワー
ク移載装置の作用を説明する模式図(第3作用図)であ
り、図14(h)に続いて順に説明する。 (a)加工ステーション20の治具台16をワーク着脱
ステーション40へ移動する。 (b)ワーク着脱ステーション40の治具台16を下降
させる。 (c)ワーク着脱ステーション40の治具台16を待機
ステーション50Rに移動すると同時に、待機ステーシ
ョン50Lの治具台16をワーク着脱ステーション40
へ移動する。FIGS. 15A to 15G are schematic diagrams (third operation diagram) for explaining the operation of the work transfer device according to the present invention, and will be described in order following FIG. 14H. (A) The jig table 16 of the processing station 20 is moved to the work attaching / detaching station 40. (B) The jig table 16 of the work attaching / detaching station 40 is lowered. (C) At the same time as moving the jig table 16 of the work attaching / detaching station 40 to the standby station 50R, the jig table 16 of the standby station 50L is moved to the work attaching / detaching station 40R.
Move to.
【0050】(d)ワーク着脱ステーション40の治具
台16を上昇させる。 (e)ワーク着脱ステーション40の治具台16を加工
ステーション20へ移動する。 (f)加工ステーション20の治具台16を下降させ、
チルトテーブル22(図3(c)参照)を傾け、ワーク
Lの加工を開始し、また、待機ステーション50Rの治
具台16をワーク着脱ステーション40へ移動する。(D) The jig base 16 of the work attaching / detaching station 40 is raised. (E) The jig table 16 of the work attaching / detaching station 40 is moved to the processing station 20. (F) Lower the jig table 16 of the processing station 20,
The tilt table 22 (see FIG. 3C) is tilted to start processing the work L, and the jig table 16 of the standby station 50R is moved to the work attaching / detaching station 40.
【0051】(g)ワーク着脱ステーション40の治具
台16を上昇させ、クランプ解除手段45(図12
(c)参照)でワークRのクランプを解除し、加工済み
のワークRを治具台16から取外す。これで、ワークL
及びワークRの加工は完了する。更に他のワークを加工
する場合は上記サイクルを繰返す。(G) The jig base 16 of the work attaching / detaching station 40 is raised, and the clamp releasing means 45 (FIG. 12)
(See (c)), the clamp of the work R is released, and the processed work R is removed from the jig base 16. With this, work L
And the processing of the work R is completed. When processing another workpiece, the above cycle is repeated.
【0052】図16は本発明に係るワーク移載装置のワ
ークの流れを示すフロー図であり、比較例とともに示
す。なお、ST××はステップ番号である。比較例は、
図17に示したワーク移載装置のワークの流れを示すも
の、即ち、本発明のワーク移載装置の待機ステーション
がないものである。本発明のワーク移載装置のフロー図
は図13(a)〜(h)、図14(a)〜(h)、図1
5(a)〜(g)に対応するので、詳細説明は省略す
る。なお、フロー図中、「移動↑」は、ワーク着脱ステ
ーションから加工ステーションへの移動、「移動↓」
は、加工ステーションからワーク着脱ステーションへの
移動、「移動←」は、ワーク着脱ステーションから待機
ステーション50Lへの移動と、待機ステーション50
Rからワーク着脱ステーションへの移動とを同時に行
い、「移動→」は、ワーク着脱ステーションから待機ス
テーション50Rへの移動と、待機ステーション50L
からワーク着脱ステーションへの移動とを同時に行うこ
とを示す。また、ワーク着脱ステーション40での治具
台16の昇降のステップは省略した。FIG. 16 is a flowchart showing a work flow of the work transfer device according to the present invention, which is shown together with a comparative example. STxx is a step number. Comparative examples are
17 shows the work flow of the work transfer device shown in FIG. 17, that is, the work transfer device of the present invention does not have a standby station. 13 (a) to 13 (h), 14 (a) to 14 (h), and FIG.
5 (a) to 5 (g), detailed description will be omitted. In the flow chart, "Move ↑" means move from the work attaching / detaching station to the processing station, "Move ↓"
Indicates the movement from the processing station to the work attachment / detachment station, and “move ←” indicates the movement from the work attachment / detachment station to the standby station 50L and the standby station 50L.
R to the work attachment / detachment station are performed at the same time, and “move →” means movement from the work attachment / detachment station to the standby station 50R and the standby station 50L.
To the work attachment / detachment station. Also, the step of lifting and lowering the jig table 16 at the work attaching / detaching station 40 is omitted.
【0053】比較例について以下に順に説明する。 ST100……着脱ステーション102の治具台103
にワークWを載せる。 ST101……着脱ステーション102から加工ステー
ション101へワークWを移動する。 ST102……加工ステーション101にてワークWを
加工する。 ST103……加工ステーション101から着脱ステー
ション102へ加工済みワークWを移動する。The comparative examples will be described below in order. ST100: Jig table 103 of detachable station 102
The work W is placed on the work. ST101: The work W is moved from the attachment / detachment station 102 to the processing station 101. ST102 Work W is processed in the processing station 101. ST103: Move the processed workpiece W from the processing station 101 to the attachment / detachment station 102.
【0054】ST104……着脱ステーション102に
て加工済みワークWを治具台103から取外し、未加工
ワークWを治具台103に載せる。 ST105……着脱ステーション102から加工ステー
ション101へワークWを移動する。 ST106……加工ステーション101にてワークWを
加工する。 ST107……加工ステーション101から着脱ステー
ション102へ加工済みワークWを移動する。ST104: At the attaching / detaching station 102, the processed work W is removed from the jig table 103, and the unprocessed work W is placed on the jig table 103. ST105: The work W is moved from the attachment / detachment station 102 to the processing station 101. ST106 Processes the workpiece W at the processing station 101. ST107: Move the processed work W from the processing station 101 to the attachment / detachment station 102.
【0055】ST108……着脱ステーション102に
て加工済みワークWを治具台103から取外し、未加工
ワークWを治具台103に載せる。 ST109……着脱ステーション102から加工ステー
ション101へワークWを移動する。 ST110……加工ステーション101にてワークWを
加工する。この後、ST03に戻り繰返す。ST108: The processed work W is removed from the jig table 103 at the attaching / detaching station 102, and the unprocessed work W is placed on the jig table 103. ST109: Move the work W from the attachment / detachment station 102 to the processing station 101. ST110 Processing the work W at the processing station 101. Thereafter, the process returns to ST03 and repeats.
【0056】この本発明のフロー図では、二点鎖線で囲
んだ部分において、ワーク加工工程と、「移動←」、
「移動→」、特に太枠で示した「ワークを載せる」、
「加工済みワークを取外す」という大きな時間比率を占
める作業工程とが並列になっている。従って、前記作業
工程は、ワークの加工から次のワークの加工までのサイ
クルに含まれない。これに対して、比較例のフロー図で
は、二点鎖線内のワーク加工工程と、太枠で示した「加
工済みワークを取外し、別のワークを載せる」作業工程
とが直列になっている。従って、上記作業工程は、前記
サイクルに含まれる。In the flow chart of the present invention, in the portion surrounded by the two-dot chain line, the work processing step, “movement ←”,
"Move →", especially "Place work" shown in bold frame,
The work process that occupies a large time ratio of “removing the processed work” is arranged in parallel. Therefore, the work process is not included in the cycle from processing of a work to processing of the next work. On the other hand, in the flow chart of the comparative example, the work processing step within the two-dot chain line and the work step of “removing the processed work and mounting another work” indicated by the thick frame are in series. Therefore, the above operation steps are included in the cycle.
【0057】このことより、本発明では、ワークを加工
中に他のワークを治具台16に載せたり、治具台16か
ら取外すことができ、比較例のように、ワークを治具台
103に載せたり、治具台103から取外す作業に特に
時間を費やさなければならないということが本発明には
ない。従って、本発明では、ワークの加工から次のワー
クの加工までのサイクルの時間を短縮することができ
る。As a result, according to the present invention, another work can be placed on the jig table 16 or removed from the jig table 16 while the work is being processed. The present invention does not require any particular time to be put on the jig or removed from the jig stand 103. Therefore, according to the present invention, it is possible to reduce the cycle time from processing of a work to processing of the next work.
【0058】尚、本発明では、図13(f)、図14
(h)に示したように、2台の治具台16,16を搬送
手段60で移動した後、加工ステーション20でのワー
クの加工が終了するが、治具台16,16を搬送手段6
0で移動する時に、既に加工ステーション20でのワー
クの加工が終了していてもよい。このようにすれば、治
具台16,16を搬送手段60で移動後、直ちに加工済
みワークを加工ステーション20からワーク着脱ステー
ション40へ移動することができる。In the present invention, FIG. 13 (f), FIG.
As shown in (h), after the two jig tables 16, 16 are moved by the transfer means 60, the processing of the work in the processing station 20 is completed.
When moving at 0, the processing of the workpiece at the processing station 20 may have already been completed. In this way, the processed work can be moved from the processing station 20 to the work attaching / detaching station 40 immediately after the jig tables 16 and 16 are moved by the transfer means 60.
【0059】また、図12(c)において、治具台16
の大径孔16fに弁機構を設け、大径孔16fに作動油
供給部材45bを挿入した時にのみ弁機構を開き、作動
油供給部材45bと油路16gとの作動油の流通を可能
とし、作動油供給部材45bを挿入しない時には、弁機
構を閉じて油路16gと外部とを遮断するようにしても
よい。In FIG. 12C, the jig table 16
A valve mechanism is provided in the large-diameter hole 16f, and the valve mechanism is opened only when the hydraulic oil supply member 45b is inserted into the large-diameter hole 16f, thereby enabling the flow of hydraulic oil between the hydraulic oil supply member 45b and the oil passage 16g, When the hydraulic oil supply member 45b is not inserted, the valve mechanism may be closed to shut off the oil passage 16g from the outside.
【0060】更に、図4に示したワーク着脱ステーショ
ン40において、外部へワークを受け渡す若しくは外部
からワークを受けとる手段として、本実施の形態では、
アンローダー、ローダーを示したが、これに限るもので
はなく、クレーン等でもよく、要はワーク着脱ステーシ
ョン40からワークを排出又はワーク着脱ステーション
40にワークを供給できればよい。Further, in the work attaching / detaching station 40 shown in FIG. 4, as a means for delivering a work to the outside or receiving a work from the outside, in the present embodiment,
Although the unloader and the loader are shown, the present invention is not limited thereto, and a crane or the like may be used.
【0061】[0061]
【発明の効果】本発明は上記構成により次の効果を発揮
する。請求項1のワーク移載装置は、工作機械にてワー
クを加工するワーク加工ステーションと、外部へ受け渡
すワークを載せる若しくは外部から受けとったワークを
載せるためにワーク加工ステーションに臨む位置に設け
たワーク授受ステーションと、ワーク加工ステーション
とワーク授受ステーションとを結ぶワークの第1の動線
に直交する第2の動線上に且つワーク授受ステーション
の両側に各々配置した第1・第2ワーク待機ステーショ
ンと、第1・第2の動線上をワークを移動させる第1・
第2のワーク移動手段とからなるので、ワークの移動手
段として、第1・第2のワーク移動手段だけであり、設
備構成を簡素化することができる。According to the present invention, the following effects are exhibited by the above configuration. The work transfer device according to claim 1, wherein the work is provided at a position facing the work processing station for mounting a work to be transferred to the outside or for mounting a work received from the outside. A transfer station, first and second work standby stations respectively disposed on a second flow line orthogonal to a first flow line of the work connecting the work processing station and the work transfer station and on both sides of the work transfer station; First and second moving the workpiece on the first and second flow lines
Since it is composed of the second work moving means, only the first and second work moving means are used as the work moving means, and the equipment configuration can be simplified.
【0062】また、ワーク授受ステーションが1ヵ所だ
けであり、ワーク授受のために作業者が移動することが
なく、作業者の負担を軽減することができる。更に、第
1・第2ワーク待機ステーションを設けたことで、ワー
クを加工中に加工済みのワークを外部へ受け渡すために
待機ステーションに待機させたり、次の未加工のワーク
を加工するために待機ステーションに待機させたりする
ことができ、ワーク加工から次のワーク加工までの1サ
イクルの時間内からワーク授受時間を省くことができ、
ワーク加工ステーション及びとワーク授受ステーション
しか持たない工作機械でワーク加工時間にワーク授受の
時間が含まれるのに比較して上記1サイクルの時間を短
縮することができる。Also, since there is only one work transfer station, the worker does not move for work transfer, and the burden on the worker can be reduced. Further, by providing the first and second work standby stations, it is possible to make the standby station wait for transferring the processed work to the outside while processing the work, or to process the next unprocessed work. It can be made to stand by at a standby station, and the work transfer time can be omitted from the time of one cycle from work processing to the next work processing.
In the case of a machine tool having only a work processing station and a work transfer station, the time of one cycle can be reduced as compared with the work transfer time included in the work processing time.
【0063】請求項2の工作機械のワーク移載方法は、
工作機械の加工ステーションと、この加工ステーション
の手前に設けた外部へのワークのワーク授受ステーショ
ンと、このワーク授受ステーションの左右に設けたワー
ク待機ステーションとから各ステーションへワークを移
載するときに、外部から第1の未加工品であるワークを
授受ステーションに載せ、この第1の未加工品を加工ス
テーションへ移動して加工を開始し、空いたワーク授受
ステーションへ第2の未加工品であるワークを載せ、こ
の第2の未加工品を一方のワーク待機ステーションへ移
動し、空いたワーク授受ステーションへ第1の加工品で
あるワークを移動し、次に、第1の加工品及び第2の未
加工品を同時に移動することで、第1の加工品を他方の
ワーク待機ステーションへ、第2の未加工品をワーク授
受ステーションへ移動し、この第2の未加工品を加工ス
テーションへ移動して加工を開始し、空になったワーク
授受ステーションへ第1の加工品を戻し、この第1の加
工品を外部へ移動し、空いたワーク授受ステーションへ
外部から第3の未加工品であるワークを載せることで、
順次ワークを加工するので、ワーク加工ステーションで
ワークを加工中に、ワーク授受ステーションで治具台か
ら加工品であるワークを取外し、次の未加工品であるワ
ークを取付けるので、ワーク加工から次のワーク加工ま
での1サイクルの時間内からワーク授受時間を省くこと
ができ、ワーク加工ステーション及びとワーク授受ステ
ーションしか持たない工作機械でワーク加工時間にワー
ク授受の時間が含まれるのに比較して上記1サイクルの
時間を短縮することができる。A method of transferring a workpiece of a machine tool according to a second aspect is as follows.
When transferring a work to each station from a processing station of a machine tool, a work transfer station for work provided to the outside provided in front of the work station, and a work standby station provided on the left and right of the work transfer station, A work which is a first unprocessed product is placed on the transfer station from the outside, the first unprocessed product is moved to the processing station and processing is started, and a second unprocessed product is transferred to the empty work transfer station. A work is placed, the second unprocessed product is moved to one work standby station, the work which is the first processed product is moved to an empty work transfer station, and then the first processed product and the second By moving the unprocessed products at the same time, the first processed product is transferred to the other work standby station, and the second unprocessed product is transferred to the work transfer station. Move the second unprocessed product to the processing station to start processing, return the first processed product to the empty work transfer station, move the first processed product to the outside, By placing a third unprocessed work from the outside on the empty work transfer station,
Since the workpieces are machined sequentially, while the workpieces are being machined at the workpiece machining station, the workpieces are removed from the jig table at the workpiece transfer station, and the next unworked workpieces are attached. The work transfer time can be omitted from within one cycle time until the work processing, and the work transfer time is included in the work processing time with the work processing station and the machine tool having only the work transfer station. One cycle time can be reduced.
【図1】本発明に係るワーク移載装置を組込んだホーニ
ング加工装置の斜視図FIG. 1 is a perspective view of a honing machine incorporating a workpiece transfer device according to the present invention.
【図2】本発明に係るワーク移載装置を組込んだホーニ
ング加工装置の側面図FIG. 2 is a side view of a honing machine incorporating the workpiece transfer device according to the present invention.
【図3】本発明に係るチルトテーブル及び移載手段の作
用を説明する側面図FIG. 3 is a side view for explaining the operation of the tilt table and the transfer means according to the present invention.
【図4】本発明に係るワーク移載装置の側面図FIG. 4 is a side view of the work transfer device according to the present invention.
【図5】本発明に係る治具台とワーク移動手段との結合
を説明する側面図FIG. 5 is a side view for explaining the connection between the jig table and the work moving means according to the present invention.
【図6】本発明に係る移載手段の作用を説明する側面図FIG. 6 is a side view for explaining the operation of the transfer means according to the present invention.
【図7】本発明に係るワーク移載装置の正面図FIG. 7 is a front view of a work transfer device according to the present invention.
【図8】本発明のワーク移載装置の平面図FIG. 8 is a plan view of the work transfer device of the present invention.
【図9】本発明に係る搬送手段の作用を説明する平面図FIG. 9 is a plan view for explaining the operation of the conveying means according to the present invention.
【図10】本発明に係る治具台とワークとを示す斜視図FIG. 10 is a perspective view showing a jig base and a work according to the present invention.
【図11】本発明に係るクランプ解除手段の斜視図FIG. 11 is a perspective view of a clamp release unit according to the present invention.
【図12】本発明に係るクランプ解除手段の作用を説明
する断面図FIG. 12 is a sectional view for explaining the operation of the clamp releasing means according to the present invention.
【図13】本発明に係るワーク移載装置の作用を説明す
る模式図(第1作用図)FIG. 13 is a schematic diagram (first operation diagram) for explaining the operation of the workpiece transfer device according to the present invention.
【図14】本発明に係るワーク移載装置の作用を説明す
る模式図(第2作用図)FIG. 14 is a schematic diagram (second operation diagram) for explaining the operation of the work transfer device according to the present invention.
【図15】本発明に係るワーク移載装置の作用を説明す
る模式図(第3作用図)FIG. 15 is a schematic diagram (third operation diagram) for explaining the operation of the work transfer device according to the present invention.
【図16】本発明に係るワーク移載装置のワークの流れ
を示すフロー図FIG. 16 is a flowchart showing a work flow of the work transfer device according to the present invention.
【図17】従来のワーク移載装置の構成、作用を説明す
る模式図FIG. 17 is a schematic diagram illustrating the configuration and operation of a conventional work transfer device.
1…工作機械(ホーニング加工装置)、16…治具台、
20…ワーク加工ステーション、30…第1のワーク移
動手段(移載手段)、40…ワーク授受ステーション
(ワーク着脱ステーション)、50R,50L…ワーク
待機ステーション、60…第2のワーク移動手段(搬送
手段)、80…ワーク移載装置、L,R,W…ワーク。1: machine tool (Honing machine), 16: jig stand,
Reference numeral 20: work processing station, 30: first work moving means (transfer means), 40: work transfer station (work attaching / detaching station), 50R, 50L: work standby station, 60: second work moving means (transporting means) ), 80: Work transfer device, L, R, W: Work.
Claims (2)
工ステーションと、外部へ受け渡すワークを載せる若し
くは外部から受けとったワークを載せるために前記ワー
ク加工ステーションに臨む位置に設けたワーク授受ステ
ーションと、前記ワーク加工ステーションとワーク授受
ステーションとを結ぶワークの第1の動線に直交する第
2の動線上に且つワーク授受ステーションの両側に各々
配置した第1・第2ワーク待機ステーションと、前記第
1・第2の動線上をワークを移動させる第1・第2のワ
ーク移動手段とからなる工作機械用ワーク移載装置。1. A work processing station for processing a work by a machine tool, and a work transfer station provided at a position facing the work processing station for mounting a work to be transferred to the outside or mounting a work received from the outside. A first and a second work standby station respectively disposed on a second flow line orthogonal to a first flow line of a work connecting the work processing station and the work transfer station and on both sides of the work transfer station; A work transfer device for a machine tool comprising first and second work moving means for moving a work on a second flow line;
工ステーションの手前に設けた外部へのワークのワーク
授受ステーションと、このワーク授受ステーションの左
右に設けたワーク待機ステーションとから各ステーショ
ンへワークを移載するときに、外部から第1の未加工品
であるワークを授受ステーションに載せ、この第1の未
加工品を加工ステーションへ移動して加工を開始し、空
いたワーク授受ステーションへ第2の未加工品であるワ
ークを載せ、この第2の未加工品を一方のワーク待機ス
テーションへ移動し、空いたワーク授受ステーションへ
第1の加工品であるワークを移動し、次に、第1の加工
品及び第2の未加工品を同時に移動することで、第1の
加工品を他方のワーク待機ステーションへ、第2の未加
工品をワーク授受ステーションへ移動し、この第2の未
加工品を加工ステーションへ移動して加工を開始し、空
になったワーク授受ステーションへ第1の加工品を戻
し、この第1の加工品を外部へ移動し、空いたワーク授
受ステーションへ外部から第3の未加工品であるワーク
を載せることで、順次ワークを加工することを特徴とし
た工作機械のワーク移載方法。2. Transferring a work from a processing station of a machine tool, a work transfer station provided in front of the work station for external work, and a work standby station provided on the left and right of the work transfer station to each station. At the time of loading, a work which is a first unprocessed product is placed on the transfer station from the outside, the first unprocessed product is moved to the processing station and processing is started, and the second work is transferred to the empty work transfer station. A work as an unprocessed product is placed, the second unprocessed product is moved to one work standby station, the work as the first processed product is moved to an empty work transfer station, and then a first work is performed. By moving the processed product and the second unprocessed product at the same time, the first processed product is transferred to the other work standby station, and the second unprocessed product is transferred. The second unprocessed product is moved to the processing station, processing is started, the first processed product is returned to the empty work transfer station, and the first processed product is moved to the outside. A work transfer method for a machine tool, wherein a work, which is a third unprocessed product, is placed on a vacant work transfer station from the outside to sequentially process the work.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP7425297A JPH10263974A (en) | 1997-03-26 | 1997-03-26 | Work shifting device and its method for machine tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP7425297A JPH10263974A (en) | 1997-03-26 | 1997-03-26 | Work shifting device and its method for machine tool |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH10263974A true JPH10263974A (en) | 1998-10-06 |
Family
ID=13541792
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP7425297A Pending JPH10263974A (en) | 1997-03-26 | 1997-03-26 | Work shifting device and its method for machine tool |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH10263974A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007132507A1 (en) * | 2006-05-12 | 2007-11-22 | Oks Co., Ltd. | Machine tool apparatus |
WO2007132506A1 (en) * | 2006-05-12 | 2007-11-22 | Oks Co., Ltd. | Machine tool apparatus |
-
1997
- 1997-03-26 JP JP7425297A patent/JPH10263974A/en active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007132507A1 (en) * | 2006-05-12 | 2007-11-22 | Oks Co., Ltd. | Machine tool apparatus |
WO2007132506A1 (en) * | 2006-05-12 | 2007-11-22 | Oks Co., Ltd. | Machine tool apparatus |
US7640642B2 (en) | 2006-05-12 | 2010-01-05 | Oks Co., Ltd. | Machine tool apparatus |
JP5155854B2 (en) * | 2006-05-12 | 2013-03-06 | 株式会社オーケイエス | Machine tool equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4685850A (en) | Tool and workpiece change system | |
JPH0123263B2 (en) | ||
JP4901884B2 (en) | Machine Tools | |
US4423806A (en) | Pallet changing device for a numerically controlled machine tool | |
KR101606938B1 (en) | Auto workpiece loading device of the vertical turning center | |
EP2025452B1 (en) | Machine tool apparatus | |
US7640642B2 (en) | Machine tool apparatus | |
JPH0355141A (en) | Manually operated pallel changer | |
JP3597337B2 (en) | Work moving device for machine tools | |
JPH10263974A (en) | Work shifting device and its method for machine tool | |
JP3324931B2 (en) | Processing equipment | |
US20010027152A1 (en) | Machining centers | |
JPH03136734A (en) | Gear head exchanging device | |
JP3911441B2 (en) | Work delivery device | |
CN216945159U (en) | Flexible automatic machining line | |
JP2001038566A (en) | Method for conveying in work and method for conveying it out | |
US4675976A (en) | Grinding machine with facilities for storage of spare work holders and tools | |
JP2001038567A (en) | Exchange system for work mounting jig pallet | |
JP2855942B2 (en) | Flexible transfer machine | |
JPH10328965A (en) | Workpiece mounting device and machining system using this device | |
JP4396609B2 (en) | Spindle pick-up lathe | |
JP2549621Y2 (en) | Automatic jig changing device | |
JP2505591Y2 (en) | Automatic pallet changer for machine tools | |
JP2019077006A (en) | Machine tool | |
JPH06335838A (en) | Long-sized work working device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20051101 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060516 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060711 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20060822 |