CN221854730U - A photovoltaic bracket surface hot-dip galvanizing device - Google Patents
A photovoltaic bracket surface hot-dip galvanizing device Download PDFInfo
- Publication number
- CN221854730U CN221854730U CN202420450902.4U CN202420450902U CN221854730U CN 221854730 U CN221854730 U CN 221854730U CN 202420450902 U CN202420450902 U CN 202420450902U CN 221854730 U CN221854730 U CN 221854730U
- Authority
- CN
- China
- Prior art keywords
- galvanizing
- fixing
- fixedly installed
- transmission
- pool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005246 galvanizing Methods 0.000 title claims abstract description 93
- 230000005540 biological transmission Effects 0.000 claims abstract description 70
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 54
- 239000010959 steel Substances 0.000 claims abstract description 54
- 238000001816 cooling Methods 0.000 claims abstract description 22
- 239000000463 material Substances 0.000 claims description 5
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 abstract description 13
- 229910052725 zinc Inorganic materials 0.000 abstract description 13
- 239000011701 zinc Substances 0.000 abstract description 13
- 239000007788 liquid Substances 0.000 abstract description 8
- 229910001335 Galvanized steel Inorganic materials 0.000 abstract description 3
- 239000008397 galvanized steel Substances 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 7
- 238000000034 method Methods 0.000 description 7
- 238000005260 corrosion Methods 0.000 description 4
- 230000007797 corrosion Effects 0.000 description 4
- 229910052751 metal Inorganic materials 0.000 description 3
- 239000002184 metal Substances 0.000 description 3
- 238000009825 accumulation Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Coating With Molten Metal (AREA)
Abstract
本实用新型涉及热镀锌设备技术领域,且公开了一种光伏支架表面热镀锌装置,包括镀锌池,所述镀锌池的底部固定安装有底座,所述镀锌池的内部设置有钢材;提升机构,固定安装于镀锌池的两侧;扰流机构,固定安装于底座的内部,其一端位于镀锌池的内部;冷却机构,固定安装于镀锌池的背部;传动机构,固定安装于冷却机构下方,且和冷却机构相互啮合。本实用新型通过提升机构和防脱落机构将钢材进行固定,并且控制镀锌作业的进行,再通过冷却机构和扰流作业的运行,使镀锌池内部的锌液流动,避免锌液表面的温度过低,提高了镀锌质量,并且辅以风扇的运作,对镀锌完成的钢材进行冷却,提高了工作效率。
The utility model relates to the technical field of hot-dip galvanizing equipment, and discloses a photovoltaic bracket surface hot-dip galvanizing device, including a galvanizing pool, a base is fixedly installed at the bottom of the galvanizing pool, and steel is arranged inside the galvanizing pool; a lifting mechanism is fixedly installed on both sides of the galvanizing pool; a spoiler mechanism is fixedly installed inside the base, and one end of the spoiler mechanism is located inside the galvanizing pool; a cooling mechanism is fixedly installed on the back of the galvanizing pool; a transmission mechanism is fixedly installed below the cooling mechanism and meshes with the cooling mechanism. The utility model fixes the steel through the lifting mechanism and the anti-drop mechanism, and controls the galvanizing operation, and then through the operation of the cooling mechanism and the spoiler operation, the zinc liquid inside the galvanizing pool flows, avoiding the surface temperature of the zinc liquid being too low, improving the galvanizing quality, and with the assistance of the operation of the fan, the galvanized steel is cooled, thereby improving the work efficiency.
Description
技术领域Technical Field
本实用新型涉及热镀锌设备技术领域,更具体地说,本实用新型涉及一种光伏支架表面热镀锌装置。The utility model relates to the technical field of hot-dip galvanizing equipment, and more specifically, to a photovoltaic bracket surface hot-dip galvanizing device.
背景技术Background Art
热镀锌也叫热浸锌和热浸镀锌,是将除锈后的钢件浸入500℃左右融化的锌液中,使钢构件表面附着锌层,从而起到防腐的目的,是一种有效的金属防腐方式,主要用于各行业的金属结构设施上,热镀锌对金属的减蚀延寿,节能节材有着不可估量的作用。Hot-dip galvanizing, also known as hot-dip galvanizing and hot-dip galvanizing, is the process of immersing the rusted steel parts in molten zinc liquid at about 500°C to adhere a zinc layer to the surface of the steel components, thereby achieving the purpose of corrosion protection. It is an effective metal corrosion protection method and is mainly used in metal structural facilities in various industries. Hot-dip galvanizing plays an immeasurable role in reducing metal corrosion and extending its life, as well as saving energy and materials.
目前光伏支架通常是在室外进行放置作业,而为了保证光伏支架的防锈防腐,通常会将支架表面进行镀锌作业,因此,需要一种用于光伏支架表面热镀锌的装置,现有的热镀锌装置通常是将光伏支架的钢材吊起固定,并且向下投入到锌池中,完成镀锌操作,当镀锌完成后将其抬起,最后进行冷却,但是,该装置在锌池在未进行工作时,通常是处于静置状态,这就会导致锌池底部和顶部产生温差,其顶部的锌液与空气的接触面积大,导致其冷却的较快,使其难以附着至钢材上,当钢材进入锌池时,可能会导致镀锌不均的问题,并且钢材镀锌完成后静置冷却的效率不高,导致工作效率低下,因此需要对其进行改进和优化。At present, photovoltaic brackets are usually placed outdoors, and in order to ensure the rust and corrosion resistance of the photovoltaic brackets, the surface of the brackets is usually galvanized. Therefore, a device for hot-dip galvanizing the surface of the photovoltaic bracket is needed. The existing hot-dip galvanizing device usually lifts and fixes the steel of the photovoltaic bracket, and puts it down into a zinc pool to complete the galvanizing operation. When the galvanizing is completed, it is lifted up and finally cooled. However, when the zinc pool is not working, the device is usually in a static state, which will cause a temperature difference between the bottom and the top of the zinc pool. The contact area of the zinc liquid at the top with the air is large, which causes it to cool faster and makes it difficult to adhere to the steel. When the steel enters the zinc pool, it may cause uneven galvanizing. In addition, the efficiency of static cooling of the steel after galvanizing is not high, resulting in low work efficiency. Therefore, it needs to be improved and optimized.
实用新型内容Utility Model Content
为了克服现有技术的不足,本实用新型提供了一种光伏支架表面热镀锌装置,具有操作安全,镀锌高效的优点。In order to overcome the deficiencies of the prior art, the utility model provides a photovoltaic bracket surface hot-dip galvanizing device, which has the advantages of safe operation and efficient galvanizing.
为实现上述目的,本实用新型提供如下技术方案:一种光伏支架表面热镀锌装置,包括镀锌池,所述镀锌池的底部固定安装有底座,所述镀锌池的内部设置有钢材;To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a photovoltaic bracket surface hot-dip galvanizing device, comprising a galvanizing pool, a base is fixedly installed at the bottom of the galvanizing pool, and steel is arranged inside the galvanizing pool;
提升机构,固定安装于镀锌池的两侧;Lifting mechanism, fixedly installed on both sides of the galvanizing tank;
扰流机构,固定安装于底座的内部,其一端位于镀锌池的内部;The spoiler mechanism is fixedly installed inside the base, and one end of the spoiler mechanism is located inside the galvanizing pool;
冷却机构,固定安装于镀锌池的背部;The cooling mechanism is fixedly installed on the back of the galvanizing tank;
传动机构,固定安装于冷却机构下方,且和冷却机构相互啮合;The transmission mechanism is fixedly installed below the cooling mechanism and meshes with the cooling mechanism;
其中,提升机构包括有固定安装于镀锌池侧面的固定槽,所述固定槽的内部转动安装有螺纹杆,所述螺纹杆的底部固定安装有电机一,所述电机一固定安装于固定槽的下方,所述螺纹杆的外壁螺纹套接有移动块,所述移动块和连接板的一端固定连接,所述连接板的另一端固定安装有安装板。Among them, the lifting mechanism includes a fixing groove fixedly installed on the side of the galvanizing pool, a threaded rod is rotatably installed inside the fixing groove, a motor 1 is fixedly installed at the bottom of the threaded rod, and the motor 1 is fixedly installed below the fixing groove. A moving block is threadedly sleeved on the outer wall of the threaded rod, the moving block is fixedly connected to one end of the connecting plate, and a mounting plate is fixedly installed on the other end of the connecting plate.
作为本实用新型的一种优选技术方案,所述镀锌池的内部活动安装有安装板;As a preferred technical solution of the utility model, a mounting plate is movably installed inside the galvanizing pool;
夹持机构,活动安装于安装板内部;The clamping mechanism is movably mounted inside the mounting plate;
固定机构,固定安装于夹持机构一端,其内部固定安装有钢材;The fixing mechanism is fixedly installed at one end of the clamping mechanism, and steel is fixedly installed inside the fixing mechanism;
其中,夹持机构包括有活动安装于安装板内部的夹持板,所述夹持板共有两组,两组所述夹持板之间通过弹簧二弹性连接,所述弹簧二共有两组,且设置于安装板的前后两侧。Among them, the clamping mechanism includes a clamping plate movably installed inside the mounting plate. There are two groups of clamping plates, and the two groups of clamping plates are elastically connected by spring 2. There are two groups of spring 2, and they are arranged on the front and back sides of the mounting plate.
作为本实用新型的一种优选技术方案,还包括有活动安装于固定槽顶部的防脱落机构,所述防脱落机构包括有活动安装于固定槽顶部的固定板,所述固定板的下方和螺纹杆转动连接,所述固定板的侧面活动安装有插销,所述插销共有两组,且所述插销的一端贯穿至固定槽的内部,所述插销和固定板的外壁通过弹簧一弹性连接。As a preferred technical solution of the utility model, it also includes an anti-falling mechanism movably installed on the top of the fixing groove, the anti-falling mechanism includes a fixing plate movably installed on the top of the fixing groove, the bottom of the fixing plate is rotatably connected to the threaded rod, and a latch is movably installed on the side of the fixing plate. There are two groups of latches, and one end of the latch passes through the interior of the fixing groove, and the latch and the outer wall of the fixing plate are elastically connected by a spring.
作为本实用新型的一种优选技术方案,所述扰流机构包括有转动安装于镀锌池内部的扰流杆,所述扰流杆的底部固定安装有齿轮一,所述齿轮一转动安装于底座的内部,所述齿轮一和电机二固定连接,所述电机二固定安装于底座的内部,所述齿轮一和传动机构传动连接。As a preferred technical solution of the utility model, the spoiler mechanism includes a spoiler rod rotatably installed inside the galvanizing pool, a gear 1 is fixedly installed on the bottom of the spoiler rod, the gear 1 is rotatably installed inside the base, the gear 1 is fixedly connected to the motor 2, the motor 2 is fixedly installed inside the base, and the gear 1 is transmission connected to the transmission mechanism.
作为本实用新型的一种优选技术方案,所述冷却机构包括有固定安装于镀锌池背部的外壳,所述外壳的内部转动安装有传动轮二,所述传动轮二和风扇固定连接,所述传动轮二和传动机构相互啮合。As a preferred technical solution of the utility model, the cooling mechanism includes a shell fixedly installed on the back of the galvanizing pool, and a second transmission wheel is rotatably installed inside the shell. The second transmission wheel is fixedly connected to the fan, and the second transmission wheel and the transmission mechanism are meshed with each other.
作为本实用新型的一种优选技术方案,所述传动机构包括有转动安装于外壳内部的齿轮二,所述齿轮二和齿轮一通过传动带传动连接,所述齿轮二的顶部固定安装有传动杆,所述传动杆的顶部固定安装有传动轮一,所述传动轮一和传动轮二相互啮合,所述传动杆转动安装于外壳内部。As a preferred technical solution of the utility model, the transmission mechanism includes gear 2 rotatably installed inside the shell, gear 2 and gear 1 are connected by a transmission belt, a transmission rod is fixedly installed on the top of gear 2, a transmission wheel 1 is fixedly installed on the top of the transmission rod, the transmission wheel 1 and the transmission wheel 2 are meshed with each other, and the transmission rod is rotatably installed inside the shell.
作为本实用新型的一种优选技术方案,所述固定机构包括有固定安装于夹持板一端的固定块一,所述固定块一的底部固定安装有固定块二,所述固定块一的内部螺纹套接有螺栓,所述螺栓和固定块二将钢材进行固定。As a preferred technical solution of the utility model, the fixing mechanism includes a fixing block 1 fixedly installed at one end of the clamping plate, a fixing block 2 is fixedly installed at the bottom of the fixing block 1, and a bolt is sleeved on the internal thread of the fixing block 1, and the bolt and the fixing block 2 fix the steel.
与现有技术相比,本实用新型的有益效果如下:Compared with the prior art, the beneficial effects of the utility model are as follows:
1、本实用新型通过电机一的运作,使安装板带动钢材上下运作,并且通过插销控制其的拆卸,当镀锌作业时,通过电机二的运作使扰流杆和风扇运作,扰流杆对镀锌池进行扰流,风扇对钢材进行冷却,与传统装置相比,该装置通过提升机构和防脱落机构将钢材进行固定,并且控制镀锌作业的进行,再通过冷却机构和扰流作业的运行,使镀锌池内部的锌液流动,避免锌液表面的温度过低,提高了镀锌质量,并且辅以风扇的运作,对镀锌完成的钢材进行冷却,提高了工作效率。1. The utility model uses the operation of motor 1 to make the mounting plate drive the steel to move up and down, and controls its disassembly through the latch. When the galvanizing operation is in progress, the operation of motor 2 makes the spoiler rod and the fan operate, the spoiler rod disturbs the galvanizing pool, and the fan cools the steel. Compared with the traditional device, the device fixes the steel through the lifting mechanism and the anti-falling mechanism, and controls the galvanizing operation. Then, the operation of the cooling mechanism and the spoiler operation makes the zinc liquid inside the galvanizing pool flow, avoiding the excessively low temperature of the zinc liquid surface, improving the galvanizing quality, and with the assistance of the operation of the fan, the galvanized steel is cooled, thereby improving the work efficiency.
2、本实用新型通过夹持板和弹簧二之间的配合,使钢材的左右两端完成固定,再通过螺栓和固定块二的配合,使钢材的上下两端完成固定,与传统装置相比,该装置通过夹持机构和固定机构对钢材进行限制,使其能够适应不同型号的钢材,并且钢材之间相互留有空隙,避免了钢材堆积导致的镀锌效果差,提高了镀锌质量。2. The utility model fixes the left and right ends of the steel through the cooperation between the clamping plate and the second spring, and fixes the upper and lower ends of the steel through the cooperation between the bolt and the second fixing block. Compared with the traditional device, the device restricts the steel through the clamping mechanism and the fixing mechanism, so that it can adapt to different types of steel, and there are gaps between the steels, which avoids the poor galvanizing effect caused by the accumulation of steel and improves the galvanizing quality.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1为本实用新型结构示意图;Fig. 1 is a schematic diagram of the structure of the utility model;
图2为本实用新型剖面结构示意图;Figure 2 is a schematic diagram of the cross-sectional structure of the utility model;
图3为本实用新型螺纹杆结构示意图;Figure 3 is a schematic diagram of the structure of the threaded rod of the utility model;
图4为本实用新型固定板结构示意图;Figure 4 is a schematic diagram of the structure of the fixed plate of the utility model;
图5为本实用新型齿轮一结构示意图;Figure 5 is a schematic diagram of the structure of a gear of the utility model;
图6为本实用新型传动杆结构示意图;Figure 6 is a schematic diagram of the transmission rod structure of the utility model;
图7为本实用新型安装板结构示意图。FIG. 7 is a schematic diagram of the structure of the mounting plate of the utility model.
图中:1、镀锌池;2、底座;3、钢材;4、固定槽;5、电机一;6、螺纹杆;7、移动块;8、连接板;9、固定板;10、插销;11、弹簧一;12、扰流杆;13、齿轮一;14、电机二;15、外壳;16、齿轮二;17、传动带;18、传动杆;19、传动轮一;20、传动轮二;21、风扇;22、安装板;23、夹持板;24、固定块一;25、固定块二;26、螺栓;27、弹簧二。In the figure: 1. galvanizing tank; 2. base; 3. steel; 4. fixing groove; 5. motor 1; 6. threaded rod; 7. moving block; 8. connecting plate; 9. fixing plate; 10. latch; 11. spring 1; 12. spoiler rod; 13. gear 1; 14. motor 2; 15. housing; 16. gear 2; 17. transmission belt; 18. transmission rod; 19. transmission wheel 1; 20. transmission wheel 2; 21. fan; 22. mounting plate; 23. clamping plate; 24. fixing block 1; 25. fixing block 2; 26. bolt; 27. spring 2.
具体实施方式DETAILED DESCRIPTION
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
如图1至图7所示,本实用新型提供一种光伏支架表面热镀锌装置,包括镀锌池1,镀锌池1的底部固定安装有底座2,镀锌池1的内部设置有钢材3;As shown in FIG. 1 to FIG. 7 , the utility model provides a photovoltaic bracket surface hot-dip galvanizing device, comprising a galvanizing pool 1, a base 2 is fixedly installed at the bottom of the galvanizing pool 1, and a steel material 3 is arranged inside the galvanizing pool 1;
提升机构,固定安装于镀锌池1的两侧;A lifting mechanism is fixedly installed on both sides of the galvanizing pool 1;
扰流机构,固定安装于底座2的内部,其一端位于镀锌池1的内部;The spoiler mechanism is fixedly installed inside the base 2, and one end of the spoiler mechanism is located inside the galvanizing pool 1;
冷却机构,固定安装于镀锌池1的背部;A cooling mechanism is fixedly mounted on the back of the galvanizing pool 1;
传动机构,固定安装于冷却机构下方,且和冷却机构相互啮合;The transmission mechanism is fixedly installed below the cooling mechanism and meshes with the cooling mechanism;
其中,提升机构包括有固定安装于镀锌池1侧面的固定槽4,固定槽4的内部转动安装有螺纹杆6,螺纹杆6的底部固定安装有电机一5,电机一5固定安装于固定槽4的下方,螺纹杆6的外壁螺纹套接有移动块7,移动块7和连接板8的一端固定连接,连接板8的另一端固定安装有安装板22。Among them, the lifting mechanism includes a fixed groove 4 fixedly installed on the side of the galvanizing pool 1, a threaded rod 6 is rotatably installed inside the fixed groove 4, a motor 5 is fixedly installed at the bottom of the threaded rod 6, and the motor 5 is fixedly installed below the fixed groove 4. A moving block 7 is threadedly sleeved on the outer wall of the threaded rod 6. The moving block 7 is fixedly connected to one end of the connecting plate 8, and a mounting plate 22 is fixedly installed on the other end of the connecting plate 8.
当需要进行热镀锌作业前,工作人员先将插销10抬起,从而使固定板9和固定槽4之间的固定关系取消,然后工作人员可以取下固定板9并启动电机一5,使螺纹杆6旋转,进一步使移动块7上升,从而使连接板8带动安装板22上升,直至移动块7脱离螺纹杆6,此时安装板22被取下,工作人员可以将需要加工的钢材3通过安装板22固定,然后工作人员将移动块7和螺纹杆6重新螺纹套接,并且将固定板9放置于固定槽4的顶部,松开插销10,由于弹簧一11的弹性,使插销10将固定槽4和固定板9进行固定,然后工作人员启动电机二14,并且再次启动电机一5,使钢材3下降至镀锌池1内部,此时电机二14的运作通过齿轮一13,带动扰流杆12旋转,对镀锌池1进行扰流,并且此时通过传动带17的传动,齿轮二16开始旋转,齿轮二16通过传动杆18带动传动轮一19旋转,进一步使与传动轮一19相互啮合的传动轮二20旋转,此时风扇21开始旋转,当钢材3镀锌完成抬起时,风扇21对其进行辅助冷却工作。Before hot-dip galvanizing, the staff first lifts the latch 10 to cancel the fixed relationship between the fixing plate 9 and the fixing groove 4, and then the staff can remove the fixing plate 9 and start the motor 5 to rotate the threaded rod 6, further raising the moving block 7, so that the connecting plate 8 drives the mounting plate 22 to rise until the moving block 7 is separated from the threaded rod 6. At this time, the mounting plate 22 is removed, and the staff can fix the steel 3 to be processed through the mounting plate 22, and then the staff will re-thread the moving block 7 and the threaded rod 6, and place the fixing plate 9 on the top of the fixing groove 4, loosen the latch 10, and due to the spring 11 The staff starts the motor 2 14 and the motor 1 5 again to lower the steel 3 into the galvanizing pool 1. At this time, the operation of the motor 2 14 drives the spoiler rod 12 to rotate through the gear 13 to disturb the galvanizing pool 1. At this time, the gear 2 16 starts to rotate through the transmission belt 17. The gear 2 16 drives the transmission wheel 19 to rotate through the transmission rod 18, and further rotates the transmission wheel 20 meshing with the transmission wheel 19. At this time, the fan 21 starts to rotate. When the steel 3 is lifted after galvanizing, the fan 21 provides auxiliary cooling for it.
通过电机一5的运作,使安装板22带动钢材3上下运作,并且通过插销10控制其的拆卸,当镀锌作业时,通过电机二14的运作使扰流杆12和风扇21运作,扰流杆12对镀锌池1进行扰流,风扇21对钢材3进行冷却,与传统装置相比,该装置通过提升机构和防脱落机构将钢材3进行固定,并且控制镀锌作业的进行,再通过冷却机构和扰流作业的运行,使镀锌池1内部的锌液流动,避免锌液表面的温度过低,提高了镀锌质量,并且辅以风扇21的运作,对镀锌完成的钢材3进行冷却,提高了工作效率。Through the operation of the motor 1 5, the mounting plate 22 drives the steel 3 to move up and down, and its disassembly is controlled by the latch 10. When the galvanizing operation is performed, the spoiler rod 12 and the fan 21 are operated through the operation of the motor 2 14. The spoiler rod 12 disturbs the galvanizing pool 1, and the fan 21 cools the steel 3. Compared with the traditional device, the device fixes the steel 3 through the lifting mechanism and the anti-falling mechanism, and controls the galvanizing operation. Then, through the operation of the cooling mechanism and the spoiler operation, the zinc liquid inside the galvanizing pool 1 flows, and the temperature of the zinc liquid surface is prevented from being too low, thereby improving the galvanizing quality. In addition, with the assistance of the operation of the fan 21, the galvanized steel 3 is cooled, thereby improving the work efficiency.
其中,镀锌池1的内部活动安装有安装板22;Wherein, a mounting plate 22 is movably installed inside the galvanizing pool 1;
夹持机构,活动安装于安装板22内部;A clamping mechanism, movably mounted inside the mounting plate 22;
固定机构,固定安装于夹持机构一端,其内部固定安装有钢材3;A fixing mechanism, fixedly installed at one end of the clamping mechanism, wherein a steel material 3 is fixedly installed inside the fixing mechanism;
其中,夹持机构包括有活动安装于安装板22内部的夹持板23,夹持板23共有两组,两组夹持板23之间通过弹簧二27弹性连接,弹簧二27共有两组,且设置于安装板22的前后两侧。Among them, the clamping mechanism includes a clamping plate 23 movably installed inside the mounting plate 22. There are two groups of clamping plates 23, and the two groups of clamping plates 23 are elastically connected by springs 27. There are two groups of springs 27, and they are arranged on the front and back sides of the mounting plate 22.
在镀锌作业前,工作人员将安装板22取出,并且将两组夹持板23拉伸,确保钢材3能够放入其中,工作人员将钢材3的两端放置在固定块二25的顶部,然后旋转固定块一24内部的螺栓26,螺栓26的旋转使螺栓26的底部下降,直至螺栓26和固定块二25将钢材3固定,然后工作人员松开夹持板23,由于弹簧二27的自身特性,使两组夹持板23对钢材3进行夹持。Before the galvanizing operation, the staff will take out the mounting plate 22 and stretch the two sets of clamping plates 23 to ensure that the steel 3 can be placed therein. The staff will place the two ends of the steel 3 on the top of the fixing block 25 and then rotate the bolt 26 inside the fixing block 1 24. The rotation of the bolt 26 will cause the bottom of the bolt 26 to drop until the bolt 26 and the fixing block 25 fix the steel 3. The staff will then loosen the clamping plates 23. Due to the characteristics of the spring 27, the two sets of clamping plates 23 will clamp the steel 3.
通过夹持板23和弹簧二27之间的配合,使钢材3的左右两端完成固定,再通过螺栓26和固定块二25的配合,使钢材3的上下两端完成固定,与传统装置相比,该装置通过夹持机构和固定机构对钢材3进行限制,使其能够适应不同型号的钢材3,并且钢材3之间相互留有空隙,避免了钢材3堆积导致的镀锌效果差,提高了镀锌质量。The left and right ends of the steel 3 are fixed by the cooperation between the clamping plate 23 and the second spring 27, and the upper and lower ends of the steel 3 are fixed by the cooperation between the bolt 26 and the second fixing block 25. Compared with the traditional device, the device restricts the steel 3 through the clamping mechanism and the fixing mechanism, so that it can adapt to different types of steel 3, and there are gaps between the steels 3, which avoids the poor galvanizing effect caused by the accumulation of steels 3 and improves the galvanizing quality.
其中,还包括有活动安装于固定槽4顶部的防脱落机构,防脱落机构包括有活动安装于固定槽4顶部的固定板9,固定板9的下方和螺纹杆6转动连接,固定板9的侧面活动安装有插销10,插销10共有两组,且插销10的一端贯穿至固定槽4的内部,插销10和固定板9的外壁通过弹簧一11弹性连接。Among them, it also includes an anti-falling mechanism movably installed on the top of the fixing groove 4, the anti-falling mechanism includes a fixing plate 9 movably installed on the top of the fixing groove 4, the bottom of the fixing plate 9 is rotatably connected to the threaded rod 6, and a latch 10 is movably installed on the side of the fixing plate 9. There are two groups of latches 10, and one end of the latch 10 penetrates into the interior of the fixing groove 4, and the latch 10 and the outer wall of the fixing plate 9 are elastically connected by a spring 11.
工作人员先将插销10抬起,从而使固定板9和固定槽4之间的固定关系取消,然后工作人员可以取下固定板9,进一步可以将安装板22取出,完成钢材3的安装,然后工作人员将移动块7和螺纹杆6重新螺纹套接,并且将固定板9放置于固定槽4的顶部,松开插销10,由于弹簧一11的弹性,使插销10将固定槽4和固定板9进行固定,便于拆卸。The staff first lifts the latch 10 to cancel the fixing relationship between the fixing plate 9 and the fixing groove 4, and then the staff can remove the fixing plate 9, and further remove the mounting plate 22 to complete the installation of the steel 3. Then the staff re-threads the moving block 7 and the threaded rod 6, and places the fixing plate 9 on the top of the fixing groove 4, and loosens the latch 10. Due to the elasticity of the spring 11, the latch 10 fixes the fixing groove 4 and the fixing plate 9 for easy disassembly.
其中,扰流机构包括有转动安装于镀锌池1内部的扰流杆12,扰流杆12的底部固定安装有齿轮一13,齿轮一13转动安装于底座2的内部,齿轮一13和电机二14固定连接,电机二14固定安装于底座2的内部,齿轮一13和传动机构传动连接。Among them, the spoiler mechanism includes a spoiler rod 12 rotatably installed inside the galvanizing pool 1, a gear 13 is fixedly installed at the bottom of the spoiler rod 12, the gear 13 is rotatably installed inside the base 2, the gear 13 is fixedly connected to the motor 2 14, the motor 2 14 is fixedly installed inside the base 2, and the gear 13 is transmission-connected to the transmission mechanism.
工作人员启动电机二14,并且再次启动电机一5,使钢材3下降至镀锌池1内部,此时电机二14的运作通过齿轮一13,带动扰流杆12旋转,对镀锌池1进行扰流。The staff starts the motor 2 14 and starts the motor 1 5 again to make the steel 3 drop into the galvanizing pool 1. At this time, the operation of the motor 2 14 drives the spoiler rod 12 to rotate through the gear 1 13 to spoil the galvanizing pool 1.
其中,冷却机构包括有固定安装于镀锌池1背部的外壳15,外壳15的内部转动安装有传动轮二20,传动轮二20和风扇21固定连接,传动轮二20和传动机构相互啮合。The cooling mechanism includes a shell 15 fixedly mounted on the back of the galvanizing pool 1, a transmission wheel 20 is rotatably mounted inside the shell 15, the transmission wheel 20 is fixedly connected to the fan 21, and the transmission wheel 20 and the transmission mechanism are meshed with each other.
电机二14的运作通过传动带17的传动,齿轮二16开始旋转,齿轮二16通过传动杆18带动传动轮一19旋转,进一步使与传动轮一19相互啮合的传动轮二20旋转,此时风扇21开始旋转,当钢材3镀锌完成抬起时,风扇21对其进行辅助冷却工作。The operation of the motor 2 14 is driven by the transmission belt 17, and the gear 2 16 starts to rotate. The gear 2 16 drives the transmission wheel 19 to rotate through the transmission rod 18, and further rotates the transmission wheel 20 meshing with the transmission wheel 19. At this time, the fan 21 starts to rotate. When the steel 3 is lifted after galvanizing, the fan 21 assists in cooling it.
其中,传动机构包括有转动安装于外壳15内部的齿轮二16,齿轮二16和齿轮一13通过传动带17传动连接,齿轮二16的顶部固定安装有传动杆18,传动杆18的顶部固定安装有传动轮一19,传动轮一19和传动轮二20相互啮合,传动杆18转动安装于外壳15内部。Among them, the transmission mechanism includes a gear 2 16 rotatably installed inside the shell 15, the gear 2 16 and the gear 1 13 are connected through a transmission belt 17, a transmission rod 18 is fixedly installed on the top of the gear 2 16, and a transmission wheel 19 is fixedly installed on the top of the transmission rod 18. The transmission wheel 19 and the transmission wheel 2 20 are meshed with each other, and the transmission rod 18 is rotatably installed inside the shell 15.
齿轮一13的旋转通过传动带17的传动,使齿轮二16开始旋转,齿轮二16通过传动杆18带动传动轮一19旋转,进一步使与传动轮一19相互啮合的传动轮二20旋转,传递动力。The rotation of gear 13 is driven by transmission belt 17, so that gear 2 16 starts to rotate. Gear 2 16 drives transmission wheel 19 to rotate through transmission rod 18, and further rotates transmission wheel 20 meshing with transmission wheel 19 to transmit power.
其中,固定机构包括有固定安装于夹持板23一端的固定块一24,固定块一24的底部固定安装有固定块二25,固定块一24的内部螺纹套接有螺栓26,螺栓26和固定块二25将钢材3进行固定。Among them, the fixing mechanism includes a fixing block 24 fixedly installed at one end of the clamping plate 23, a fixing block 25 fixedly installed at the bottom of the fixing block 24, and a bolt 26 is sleeved on the internal thread of the fixing block 24. The bolt 26 and the fixing block 25 fix the steel 3.
工作人员旋转固定块一24内部的螺栓26,螺栓26的旋转使螺栓26的底部下降,直至螺栓26和固定块二25将钢材3固定。The staff rotates the bolt 26 inside the fixing block 1 24 , and the rotation of the bolt 26 causes the bottom of the bolt 26 to drop until the bolt 26 and the fixing block 2 25 fix the steel material 3 .
本实用新型的工作原理及使用流程:The working principle and use process of this utility model:
当需要进行热镀锌作业前,工作人员先将插销10抬起,从而使固定板9和固定槽4之间的固定关系取消,然后工作人员可以取下固定板9并启动电机一5,使螺纹杆6旋转,进一步使移动块7上升,从而使连接板8带动安装板22上升,直至移动块7脱离螺纹杆6,此时安装板22被取下,工作人员可以将需要加工的钢材3通过安装板22固定,然后工作人员将移动块7和螺纹杆6重新螺纹套接,并且将固定板9放置于固定槽4的顶部,松开插销10,由于弹簧一11的弹性,使插销10将固定槽4和固定板9进行固定,然后工作人员启动电机二14,并且再次启动电机一5,使钢材3下降至镀锌池1内部,此时电机二14的运作通过齿轮一13,带动扰流杆12旋转,对镀锌池1进行扰流,并且此时通过传动带17的传动,齿轮二16开始旋转,齿轮二16通过传动杆18带动传动轮一19旋转,进一步使与传动轮一19相互啮合的传动轮二20旋转,此时风扇21开始旋转,当钢材3镀锌完成抬起时,风扇21对其进行辅助冷却工作。Before hot-dip galvanizing, the staff first lifts the latch 10 to cancel the fixed relationship between the fixing plate 9 and the fixing groove 4, and then the staff can remove the fixing plate 9 and start the motor 5 to rotate the threaded rod 6, further raising the moving block 7, so that the connecting plate 8 drives the mounting plate 22 to rise until the moving block 7 is separated from the threaded rod 6. At this time, the mounting plate 22 is removed, and the staff can fix the steel 3 to be processed through the mounting plate 22, and then the staff will re-thread the moving block 7 and the threaded rod 6, and place the fixing plate 9 on the top of the fixing groove 4, loosen the latch 10, and due to the spring 11 The elasticity causes the latch 10 to fix the fixing groove 4 and the fixing plate 9, and then the staff starts the motor 2 14, and starts the motor 1 5 again, so that the steel 3 drops into the galvanizing pool 1. At this time, the operation of the motor 2 14 drives the spoiler rod 12 to rotate through the gear 13 to spoil the galvanizing pool 1, and at this time, through the transmission of the transmission belt 17, the gear 2 16 starts to rotate, and the gear 2 16 drives the transmission wheel 19 to rotate through the transmission rod 18, and further rotates the transmission wheel 20 meshing with the transmission wheel 19. At this time, the fan 21 starts to rotate, and when the steel 3 is lifted after galvanizing, the fan 21 provides auxiliary cooling for it.
在镀锌作业前,工作人员将安装板22取出,并且将两组夹持板23拉伸,确保钢材3能够放入其中,工作人员将钢材3的两端放置在固定块二25的顶部,然后旋转固定块一24内部的螺栓26,螺栓26的旋转使螺栓26的底部下降,直至螺栓26和固定块二25将钢材3固定,然后工作人员松开夹持板23,由于弹簧二27的自身特性,使两组夹持板23对钢材3进行夹持。Before the galvanizing operation, the staff will take out the mounting plate 22 and stretch the two sets of clamping plates 23 to ensure that the steel 3 can be placed therein. The staff will place the two ends of the steel 3 on the top of the fixing block 25 and then rotate the bolt 26 inside the fixing block 1 24. The rotation of the bolt 26 will cause the bottom of the bolt 26 to drop until the bolt 26 and the fixing block 25 fix the steel 3. The staff will then loosen the clamping plates 23. Due to the characteristics of the spring 27, the two sets of clamping plates 23 will clamp the steel 3.
需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202420450902.4U CN221854730U (en) | 2024-03-08 | 2024-03-08 | A photovoltaic bracket surface hot-dip galvanizing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202420450902.4U CN221854730U (en) | 2024-03-08 | 2024-03-08 | A photovoltaic bracket surface hot-dip galvanizing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN221854730U true CN221854730U (en) | 2024-10-18 |
Family
ID=93042911
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202420450902.4U Active CN221854730U (en) | 2024-03-08 | 2024-03-08 | A photovoltaic bracket surface hot-dip galvanizing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN221854730U (en) |
-
2024
- 2024-03-08 CN CN202420450902.4U patent/CN221854730U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210412497U (en) | Seamless steel pipe cooling device | |
CN221854730U (en) | A photovoltaic bracket surface hot-dip galvanizing device | |
CN211005564U (en) | Production waste heat utilization equipment based on hot galvanizing production line | |
CN114790534A (en) | Hot galvanizing process method for coil-type scaffold | |
CN212925141U (en) | Hot-dip galvanizing device for stainless steel hexagon nut | |
CN211570754U (en) | Hot galvanizing pretreatment equipment | |
CN219136933U (en) | Pickling equipment for hot galvanizing process | |
CN215560573U (en) | Hot-dip galvanizing zinc-aluminum rare earth alloy coating production equipment for steel component | |
CN213951315U (en) | Hot galvanizing device for fastener | |
CN222460298U (en) | A rapid cooling device for high carbon soldering iron production | |
CN222428341U (en) | Even cloth coating device of sagger anti-corrosion coating | |
CN220352242U (en) | Metal processing hot dip galvanizing equipment | |
CN114643386A (en) | Stainless steel processing equipment capable of preventing deformation | |
CN222540880U (en) | A device for pretreatment of iron nails by centrifugal hot-dip galvanizing | |
CN222389895U (en) | Hot galvanizing cooling passivation device | |
CN216378405U (en) | Supporting plate for acid washing | |
CN210394531U (en) | Heating equipment for steel pickling production line | |
CN217516982U (en) | Oil quenching tank for producing leaf spring | |
CN222524640U (en) | An environmentally friendly cooling pool for hot-dip galvanizing production | |
CN221052042U (en) | Adjustable temperature pickling tank for phosphating steel wires | |
CN219010417U (en) | Device for removing zinc slag at the bottom of the zinc pot | |
CN221895084U (en) | Hot galvanizing device for fastener | |
CN220665415U (en) | Hot galvanizing water spray cooling device | |
CN222758297U (en) | Hot dip galvanization device for bolt production | |
CN219861512U (en) | Galvanized pipe sectional type hot dip galvanizing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |