[go: up one dir, main page]

CN220506226U - A tunnel monitor - Google Patents

A tunnel monitor Download PDF

Info

Publication number
CN220506226U
CN220506226U CN202321726048.1U CN202321726048U CN220506226U CN 220506226 U CN220506226 U CN 220506226U CN 202321726048 U CN202321726048 U CN 202321726048U CN 220506226 U CN220506226 U CN 220506226U
Authority
CN
China
Prior art keywords
spring
fixed
tunnel
base
monitor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321726048.1U
Other languages
Chinese (zh)
Inventor
陈默然
李俊才
杨德龙
王金昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Tech University
Original Assignee
Nanjing Tech University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University filed Critical Nanjing Tech University
Priority to CN202321726048.1U priority Critical patent/CN220506226U/en
Application granted granted Critical
Publication of CN220506226U publication Critical patent/CN220506226U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model relates to the technical field of tunnel monitoring equipment and discloses a tunnel monitor, which comprises a base, universal wheels are symmetrically fixed in front of and behind the bottom of the base, an insertion pipe is fixed in the middle of the top of the base, a plurality of supports are arranged above the base, the top of the support at the lowest part is inserted into the insertion pipe, connecting pipes are arranged at the joint of the two supports, two ends of the support are inserted into the connecting pipes, and a plurality of monitoring modules are fixed at the top of the support. Through the combined action of base, intubate, support and connecting pipe, provide the basis for monitoring module's installation, avoid destroying the tunnel structure at tunnel wall trompil, a plurality of supports are connected through the connecting pipe, when overhauling the change to the monitor, can take off the monitor through dismantling support and connecting pipe department and examine and repair the change, the universal wheel of base below makes whole device can remove the position as required.

Description

一种隧道监测器A tunnel monitor

技术领域Technical field

本实用新型涉及隧道监测设备技术领域,更具体的公开了一种隧道监测器。The utility model relates to the technical field of tunnel monitoring equipment, and more specifically discloses a tunnel monitor.

背景技术Background technique

为了人们出行的方便,利用隧道将不便于修路的陆地或不便于建桥的海岛连接起来是优质的选择,可以是陆地与陆地的连接,陆地与海岛的连接,以及海岛与海岛的连接。但随着隧道运营时间的增长,隧道容易产生裂损、渗漏水等变形沉降情况,从而威胁隧道的运营安全。尤其是大型结构的海底隧道,其安全性有着至关重要的作用,因此,对隧道结构进行健康监测并获得隧道结构的实时监测数据,以实时监测数据对隧道结构状况进行安全评估,这对隧道结构后期的维修和养护具有重要意义。然而隧道壁表面监测器不易固定,给实际操作带来了困难。For the convenience of people's travel, using tunnels to connect land where roads are inconvenient or islands where bridges are inconvenient is a good choice. It can be a connection between land and land, a connection between land and an island, and a connection between an island and an island. However, as the tunnel operation time increases, the tunnel is prone to deformation and settlement such as cracks, water leakage, etc., thus threatening the operational safety of the tunnel. Especially for large-structure undersea tunnels, their safety plays a vital role. Therefore, health monitoring of the tunnel structure and obtaining real-time monitoring data of the tunnel structure are used to conduct safety assessments of the condition of the tunnel structure. This is very important for the tunnel structure. The later repair and maintenance of the structure is of great significance. However, the tunnel wall surface monitor is not easy to fix, which brings difficulties to actual operation.

针对以上问题,现有技术(公开号为CN218600585U)公开了一种隧道监测器,将检测时需要使用的电器设备分别固定在电器固定板的正表面,固定好电器设备后,在隧道合适的位置进行打孔工作,在打孔后将固定插接管和锥形连接盖插接在孔内,在抬动固定块,并使连接杆和弹性卡接杆的下端插接在固定插接管内部,通过弹性卡接杆和固定插接管卡接设置,完成固定块和检测罩体,从而进行隧道监测工作。In response to the above problems, the existing technology (publication number: CN218600585U) discloses a tunnel monitor. The electrical equipment required for detection is fixed on the front surface of the electrical fixing plate. After the electrical equipment is fixed, it is placed in a suitable position in the tunnel. Carry out drilling work. After drilling, insert the fixed plug pipe and the tapered connecting cover into the hole. Then lift the fixed block and insert the lower end of the connecting rod and the elastic clamping rod into the fixed plug pipe. The elastic clamping rod and the fixed plug-in pipe are clamped and set to complete the fixed block and the detection cover body, so as to carry out tunnel monitoring work.

但是上述设备在进行隧道检测时,通过在隧道壁表面打孔的方式对装置进行固定,会对隧道结构造成破坏从而产生风险,同时通过该方式进行固定,位于隧道壁较高处位置的装置在检修更换时会增加操作人员操作难度,从而增加操作时间减低效率。However, when the above equipment is used for tunnel inspection, the device is fixed by drilling holes on the surface of the tunnel wall, which will cause damage to the tunnel structure and create risks. At the same time, when fixed in this way, the device located higher in the tunnel wall will Maintenance and replacement will increase the difficulty for the operator, thereby increasing the operating time and reducing efficiency.

实用新型内容Utility model content

本实用新型主要解决的技术问题是提供一种隧道监测器,能够解决打孔破坏隧道结构,设备检修更换困难的问题。The main technical problem solved by the utility model is to provide a tunnel monitor, which can solve the problem of damaging the tunnel structure by drilling holes and making it difficult to repair and replace equipment.

为解决上述技术问题,根据本实用新型的一个方面,更具体的说是一种隧道监测器,包括底座,所述底座的底部前后方对称固定有万向轮,所述底座的顶部中间固定有插管,所述底座的上方设有多个支架,最下方所述支架的顶部插接于所述插管的内部,两个所述支架相接处设有连接管,所述支架的两端插接于所述连接管的内部,所述支架顶部固定有多个监测模块。In order to solve the above technical problems, according to one aspect of the present utility model, more specifically, it is a tunnel monitor, which includes a base, a universal wheel is fixed symmetrically on the front and rear of the bottom of the base, and a universal wheel is fixed on the top of the base in the middle. Intubation tube, a plurality of brackets are provided above the base, the top of the lowermost bracket is plugged into the inside of the intubation tube, a connecting pipe is provided at the junction of the two brackets, and the two ends of the bracket Plugged into the inside of the connecting pipe, a plurality of monitoring modules are fixed on the top of the bracket.

更进一步的,所述连接管的上下方前后侧面对称开有通孔,所述支架的上下方前后侧面对称开设有第一弹簧槽,所述第一弹簧槽的顶部固定有第一弹簧,所述第一弹簧远离所述第一弹簧槽的一端固定有弹簧块,所述弹簧块穿设于所述通孔的内部。Furthermore, through holes are symmetrically opened on the upper, lower and front sides of the connecting pipe, and first spring grooves are symmetrically opened on the upper, lower and front sides of the bracket. A first spring is fixed on the top of the first spring groove, so A spring block is fixed at one end of the first spring away from the first spring groove, and the spring block is inserted inside the through hole.

更进一步的,所述支架靠近隧道壁的一方均匀开设有多个卡槽,所述卡槽的内部前后侧壁的中间开设有圆槽,所述监测模块包括支撑板,所述支撑板底部固定有插块,所述插块的前后外壁中部开设有第二弹簧槽,所述第二弹簧槽的底部固定有第二弹簧,所述第二弹簧远离所述第二弹簧槽的一端固定有钢珠,所述钢珠卡接于所述圆槽,所述支撑板的上方中部开设有滑槽,所述支撑板的上方设有卡块,所述卡块的底部中间开设有导轨,所述导轨插接于所述滑槽的内部,前方所述导轨的外侧面后方固定有第三弹簧,所述第三弹簧远离前方所述导轨的一端固定于后方所述导轨的外侧面前方,所述支撑板的上方中部设有监测器,所述监测器卡接于两个所述卡块的中间。Furthermore, a plurality of slots are evenly provided on the side of the bracket close to the tunnel wall, and a circular slot is opened in the middle of the front and rear side walls inside the slot. The monitoring module includes a support plate, and the bottom of the support plate is fixed. There is an insert block. A second spring groove is provided in the middle of the front and rear outer walls of the insert block. A second spring is fixed at the bottom of the second spring groove. A steel ball is fixed at one end of the second spring away from the second spring groove. , the steel ball is clamped in the circular groove, a chute is provided in the upper middle of the support plate, a clamping block is provided above the support plate, a guide rail is provided in the middle of the bottom of the clamping block, and the guide rail is inserted into Connected to the inside of the chute, a third spring is fixed behind the outer surface of the front guide rail. One end of the third spring away from the front guide rail is fixed in front of the outer surface of the rear guide rail. The support plate There is a monitor in the upper middle part, and the monitor is clamped in the middle of the two clamping blocks.

更进一步的,所述插管与所述支架的横截面均为矩形。Furthermore, the cross-sections of the cannula and the stent are both rectangular.

更进一步的,所述通孔的直径与所述弹簧块的直径相等。Furthermore, the diameter of the through hole is equal to the diameter of the spring block.

更进一步的,所述卡块与所述监测器的接触面为磨砂面。Furthermore, the contact surface between the clamping block and the monitor is a frosted surface.

本实用新型一种隧道监测器的有益效果为:通过底座、插管、支架和连接管的共同作用,给监测模块的安装提供基础,避免在隧道壁开孔破坏隧道结构,多个支架通过连接管进行连接,在对监测器进行检修更换时,通过拆卸支架与连接管处即可将监测器取下进行检修更换,底座下方的万向轮使得整个装置可以根据需要移动位置,支架上开设的多个卡槽可以使操作人员根据监测需要增减监测器的数量及变换监测器的位置,两个卡块通过第三弹簧连接使操作人员可以根据不同监测需要在监测模块上安装不同的监测器提升装置的适应性。The beneficial effects of the tunnel monitor of this utility model are: through the joint action of the base, the intubation tube, the bracket and the connecting pipe, it provides a foundation for the installation of the monitoring module, avoiding opening holes in the tunnel wall and damaging the tunnel structure. Multiple brackets are connected by When the monitor is inspected and replaced, the monitor can be removed for inspection and replacement by disassembling the bracket and the connecting pipe. The universal wheel under the base allows the entire device to move as needed. Multiple card slots allow the operator to increase or decrease the number of monitors and change the position of the monitors according to monitoring needs. The two card blocks are connected through a third spring, allowing the operator to install different monitors on the monitoring module according to different monitoring needs. Improve the adaptability of the device.

附图说明Description of the drawings

下面结合附图和具体实施方法对本实用新型做进一步详细的说明。The utility model will be further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

图1为整体结构主视图;Figure 1 is the front view of the overall structure;

图2为底座与支架部分俯视图;Figure 2 is a top view of the base and bracket parts;

图3为支架与连接管连接处剖视结构示意图;Figure 3 is a schematic cross-sectional structural diagram of the connection between the bracket and the connecting pipe;

图4为支架与监视模块部分剖视结构示意图;Figure 4 is a partial cross-sectional structural diagram of the bracket and monitoring module;

图5为支撑板与卡块相接处剖视结构示意图。Figure 5 is a schematic cross-sectional structural diagram of the joint between the support plate and the clamping block.

图中:1、底座;2、万向轮;3、插管;4、支架;5、连接管;6、监测模块;7、第一弹簧槽;8、第一弹簧;9、弹簧块;10、通孔;11、卡槽;12、支撑板;13、插块;14、第二弹簧槽;15、第二弹簧;16、钢珠;17、圆槽;18、卡块;19、第三弹簧;20、监测器;21、滑槽;22、导轨。In the picture: 1. Base; 2. Universal wheel; 3. Intubation tube; 4. Bracket; 5. Connecting tube; 6. Monitoring module; 7. First spring slot; 8. First spring; 9. Spring block; 10. Through hole; 11. Card slot; 12. Support plate; 13. Insert block; 14. Second spring slot; 15. Second spring; 16. Steel ball; 17. Round groove; 18. Card block; 19. Three springs; 20, monitor; 21, chute; 22, guide rail.

具体实施方式Detailed ways

下文中将参考附图并结合实施例来详细说明本实用新型。需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。The present utility model will be described in detail below with reference to the accompanying drawings and embodiments. It should be noted that, as long as there is no conflict, the embodiments and features in the embodiments of this application can be combined with each other.

根据本实用新型的一个方面,如图1-5所示,提供了一种隧道监测器,包括底座1,底座1的底部前后方对称固定有万向轮2,底座1的顶部中间固定有插管3,底座1的上方设有多个支架4,最下方支架4的顶部插接于插管3的内部,两个支架4相接处设有连接管5,支架4的两端插接于连接管5的内部,支架4顶部固定有多个监测模块6,连接管5的上下方前后侧面对称开有通孔10,支架4的上下方前后侧面对称开设有第一弹簧槽7,第一弹簧槽7的顶部固定有第一弹簧8,第一弹簧8远离第一弹簧槽7的一端固定有弹簧块9,弹簧块9穿设于通孔10的内部,支架4靠近隧道壁的一方均匀开设有多个卡槽11,卡槽11的内部前后侧壁的中间开设有圆槽17,监测模块6包括支撑板12,支撑板12底部固定有插块13,插块13的前后外壁中部开设有第二弹簧槽14,第二弹簧槽14的底部固定有第二弹簧15,第二弹簧15远离第二弹簧槽14的一端固定有钢珠16,钢珠16卡接于圆槽17,支撑板12的上方中部开设有滑槽21,支撑板12的上方设有卡块18,卡块18的底部中间开设有导轨22,导轨22插接于滑槽21的内部,前方导轨22的外侧面后方固定有第三弹簧19,第三弹簧远离前方导轨22的一端固定于后方导轨22的外侧面前方,支撑板的上方中部设有监测器20,监测器20卡接于两个卡块18的中间,插管3与支架4的横截面均为矩形,通孔10的直径与弹簧块9的直径相等,卡块18与监测器20的接触面为磨砂面。According to one aspect of the present utility model, as shown in Figures 1-5, a tunnel monitor is provided, which includes a base 1. A universal wheel 2 is fixed symmetrically on the front and rear of the bottom of the base 1, and a socket is fixed on the top of the base 1 in the middle. Pipe 3, a plurality of brackets 4 are provided above the base 1, the top of the lowermost bracket 4 is plugged into the inside of the intubation tube 3, a connecting pipe 5 is provided at the junction of the two brackets 4, and both ends of the bracket 4 are plugged into Inside the connecting pipe 5, multiple monitoring modules 6 are fixed on the top of the bracket 4. Through holes 10 are symmetrically provided on the upper, lower, front and rear sides of the connecting pipe 5. A first spring slot 7 is symmetrically provided on the upper, lower, front and rear sides of the bracket 4. A first spring 8 is fixed on the top of the spring groove 7, and a spring block 9 is fixed on the end of the first spring 8 away from the first spring groove 7. The spring block 9 is inserted inside the through hole 10, and the side of the bracket 4 close to the tunnel wall is evenly spaced. A plurality of card slots 11 are provided. A circular groove 17 is provided in the middle of the front and rear side walls of the card slot 11. The monitoring module 6 includes a support plate 12. An insert block 13 is fixed at the bottom of the support plate 12. The insert block 13 is provided with a circular groove 17 in the middle of the front and rear outer walls. There is a second spring groove 14. A second spring 15 is fixed at the bottom of the second spring groove 14. A steel ball 16 is fixed at one end of the second spring 15 away from the second spring groove 14. The steel ball 16 is engaged with the circular groove 17. The support plate 12 A chute 21 is provided in the upper middle of the support plate 12, a clamping block 18 is arranged above the support plate 12, and a guide rail 22 is provided in the middle of the bottom of the clamping block 18. The guide rail 22 is inserted into the inside of the chute 21, and the outer side of the front guide rail 22 is fixed at the rear. There is a third spring 19. One end of the third spring away from the front guide rail 22 is fixed in front of the outer side of the rear guide rail 22. A monitor 20 is provided in the upper middle of the support plate. The monitor 20 is clamped in the middle of the two blocks 18. The cross-sections of the intubation tube 3 and the bracket 4 are both rectangular, the diameter of the through hole 10 is equal to the diameter of the spring block 9, and the contact surface between the clamping block 18 and the monitor 20 is a frosted surface.

在本实施例中,将底座1放置在隧道内合适位置后,将支架4插入插管3,根据监测需要将监测器20卡接于两个卡块18的中间,将监测模块6的插块13插接于所需监测位置对应的卡槽11内部,一次安装连接管5和支架4完成安装基础部分的组装,如果监测模块位置不佳,可推动支架4通过底座1作用于万向轮2移动装置位置进行调整。需要检修更换监测器20时,将支架4与连接管5依次拆开,取下监测模块6拉开两个卡块18,将监测器20取下进行检修更换,检修更换完成后,将两个卡块18拉开把监测器20放置于两个开快18中间,此时两个卡块18在第三弹簧19的作用下将监测器20牢牢固定在支撑板12上方,将插块13插接于卡槽11内部,钢珠16在第二弹簧15的作用下卡接于圆槽17将监测模块6位置固定。In this embodiment, after placing the base 1 at a suitable position in the tunnel, insert the bracket 4 into the intubation tube 3, snap the monitor 20 into the middle of the two blocks 18 according to the monitoring needs, and insert the insert block of the monitoring module 6 13 is plugged into the slot 11 corresponding to the required monitoring position, and the connecting pipe 5 and the bracket 4 are installed at one time to complete the assembly of the installation base. If the position of the monitoring module is not good, the bracket 4 can be pushed through the base 1 to act on the universal wheel 2 Move the device position to adjust. When it is necessary to repair and replace the monitor 20, disassemble the bracket 4 and the connecting pipe 5 in sequence, remove the monitoring module 6 and pull apart the two blocks 18, remove the monitor 20 for maintenance and replacement. After the maintenance and replacement is completed, remove the two blocks 18. The clamping blocks 18 are pulled apart and the monitor 20 is placed between the two openings 18. At this time, the two clamping blocks 18 firmly fix the monitor 20 above the support plate 12 under the action of the third spring 19, and the inserting block 13 is Plugged into the inside of the card slot 11, the steel ball 16 is clamped in the circular groove 17 under the action of the second spring 15 to fix the position of the monitoring module 6.

当然,上述说明并非对本实用新型的限制,本实用新型也不仅限于上述举例,本技术领域的普通技术人员在本实用新型的实质范围内所做出的变化、改型、添加或替换,也属于本实用新型的保护范围。Of course, the above description does not limit the present utility model, and the present utility model is not limited to the above examples. Changes, modifications, additions or substitutions made by those of ordinary skill in the art within the essential scope of the present utility model also belong to protection scope of this utility model.

Claims (6)

1.一种隧道监测器,包括底座(1),其特征在于:所述底座(1)的底部前后方对称固定有万向轮(2),所述底座(1)的顶部中间固定有插管(3),所述底座(1)的上方设有多个支架(4),最下方所述支架(4)的顶部插接于所述插管(3)的内部,两个所述支架(4)相接处设有连接管(5),所述支架(4)的两端插接于所述连接管(5)的内部,所述支架(4)顶部固定有多个监测模块(6)。1. A tunnel monitor, including a base (1), characterized in that: a universal wheel (2) is fixed symmetrically on the front and rear of the bottom of the base (1), and an insert is fixed in the middle of the top of the base (1). Tube (3), a plurality of brackets (4) are provided above the base (1), the top of the lowermost bracket (4) is inserted into the inside of the intubation tube (3), and the two brackets (4) A connecting pipe (5) is provided at the junction. Both ends of the bracket (4) are plugged into the inside of the connecting pipe (5). A plurality of monitoring modules (4) are fixed on the top of the bracket (4). 6). 2.根据权利要求1所述的一种隧道监测器,其特征在于:所述连接管(5)的上下方前后侧面对称开有通孔(10),所述支架(4)的上下方前后侧面对称开设有第一弹簧槽(7),所述第一弹簧槽(7)的顶部固定有第一弹簧(8),所述第一弹簧(8)远离所述第一弹簧槽(7)的一端固定有弹簧块(9),所述弹簧块(9)穿设于所述通孔(10)的内部。2. A tunnel monitor according to claim 1, characterized in that: through holes (10) are symmetrically opened on the upper, lower, front and rear sides of the connecting pipe (5), and the upper, lower, front and rear sides of the bracket (4) are symmetrically provided with through holes (10). A first spring groove (7) is symmetrically provided on the side, a first spring (8) is fixed on the top of the first spring groove (7), and the first spring (8) is away from the first spring groove (7) A spring block (9) is fixed at one end, and the spring block (9) is penetrated inside the through hole (10). 3.根据权利要求1所述的一种隧道监测器,其特征在于:所述支架(4)靠近隧道壁的一方均匀开设有多个卡槽(11),所述卡槽(11)的内部前后侧壁的中间开设有圆槽(17),所述监测模块(6)包括支撑板(12),所述支撑板(12)底部固定有插块(13),所述插块(13)的前后外壁中部开设有第二弹簧槽(14),所述第二弹簧槽(14)的底部固定有第二弹簧(15),所述第二弹簧(15)远离所述第二弹簧槽(14)的一端固定有钢珠(16),所述钢珠(16)卡接于所述圆槽(17),所述支撑板(12)的上方中部开设有滑槽(21),所述支撑板(12)的上方设有卡块(18),所述卡块(18)的底部中间开设有导轨(22),所述导轨(22)插接于所述滑槽(21)的内部,前方所述导轨(22)的外侧面后方固定有第三弹簧(19),所述第三弹簧远离前方所述导轨(22)的一端固定于后方所述导轨(22)的外侧面前方,所述支撑板的上方中部设有监测器(20),所述监测器(20)卡接于两个所述卡块(18)的中间。3. A tunnel monitor according to claim 1, characterized in that: the side of the bracket (4) close to the tunnel wall is evenly provided with a plurality of slots (11), and the inside of the slot (11) There is a circular groove (17) in the middle of the front and rear side walls. The monitoring module (6) includes a support plate (12). An insert block (13) is fixed at the bottom of the support plate (12). The insert block (13) A second spring groove (14) is provided in the middle of the front and rear outer walls. A second spring (15) is fixed at the bottom of the second spring groove (14). The second spring (15) is away from the second spring groove (15). A steel ball (16) is fixed at one end of the support plate (14), and the steel ball (16) is clamped in the circular groove (17). A chute (21) is provided in the upper middle of the support plate (12). There is a clamping block (18) above (12), and a guide rail (22) is provided in the middle of the bottom of the clamping block (18). The guide rail (22) is inserted into the inside of the chute (21). A third spring (19) is fixed at the rear of the outer surface of the guide rail (22), and one end of the third spring away from the front guide rail (22) is fixed in front of the outer surface of the rear guide rail (22). A monitor (20) is provided in the upper middle part of the support plate, and the monitor (20) is clamped in the middle of the two clamping blocks (18). 4.根据权利要求1所述的一种隧道监测器,其特征在于:所述插管(3)与所述支架(4)的横截面均为矩形。4. A tunnel monitor according to claim 1, characterized in that the cross-sections of the intubation tube (3) and the bracket (4) are both rectangular. 5.根据权利要求2所述的一种隧道监测器,其特征在于:所述通孔(10)的直径与所述弹簧块(9)的直径相等。5. A tunnel monitor according to claim 2, characterized in that the diameter of the through hole (10) is equal to the diameter of the spring block (9). 6.根据权利要求3所述的一种隧道监测器,其特征在于:所述卡块(18)与所述监测器(20)的接触面为磨砂面。6. A tunnel monitor according to claim 3, characterized in that: the contact surface between the clamping block (18) and the monitor (20) is a frosted surface.
CN202321726048.1U 2023-07-04 2023-07-04 A tunnel monitor Active CN220506226U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321726048.1U CN220506226U (en) 2023-07-04 2023-07-04 A tunnel monitor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321726048.1U CN220506226U (en) 2023-07-04 2023-07-04 A tunnel monitor

Publications (1)

Publication Number Publication Date
CN220506226U true CN220506226U (en) 2024-02-20

Family

ID=89877356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321726048.1U Active CN220506226U (en) 2023-07-04 2023-07-04 A tunnel monitor

Country Status (1)

Country Link
CN (1) CN220506226U (en)

Similar Documents

Publication Publication Date Title
CN220506226U (en) A tunnel monitor
CN205622162U (en) Cable pipe
CN108933318A (en) Same-frequency combiner
CN212300880U (en) Fixing device for indoor model test displacement gauge with hinge
CN101460028A (en) Underwater Electronic Connector
CN217179611U (en) River hydrology information acquisition equipment
CN113587969A (en) Integrated sensor mounting and wiring method for hydroelectric generating set stability test
CN201123190Y (en) An underwater electronic connection frame
CN218216494U (en) A convenient MPP cable protection tube for connection
CN222316281U (en) A combined stainless steel quick connector
CN218216408U (en) Construction electrical engineering construction is with fixed fixture of cable in ditch
CN221702498U (en) Cable trench cover
CN222559512U (en) Detachable joint for balance pup joint plug
CN219848755U (en) House building dust collector
CN220819072U (en) Air conditioner ventilation detection device
CN219718677U (en) Gas pipeline leakage accident monitoring device
CN222316713U (en) Tap water pipeline water leakage detection device
CN222479691U (en) A track-type installation device for refrigeration room pipeline equipment
CN222706219U (en) Cable supporting structure for cable trench
CN217481674U (en) A high-efficiency hydraulic oil radiator for underground scrapers
CN216218265U (en) Frame is used in computer lab construction based on distance education
CN218182487U (en) Flexible graphite-based slow-release type ion grounding device
CN221743346U (en) A municipal pipeline protection structure
CN219996477U (en) Test integrated connection device for wind tunnel test of building wind environment
CN216598932U (en) Municipal works protection cable device that passes a way

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant