CN114417466A - BIM-based electromechanical system assembling and managing method, system, storage medium and equipment - Google Patents
BIM-based electromechanical system assembling and managing method, system, storage medium and equipment Download PDFInfo
- Publication number
- CN114417466A CN114417466A CN202210007407.1A CN202210007407A CN114417466A CN 114417466 A CN114417466 A CN 114417466A CN 202210007407 A CN202210007407 A CN 202210007407A CN 114417466 A CN114417466 A CN 114417466A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- bim
- professional
- electromechanical
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000003860 storage Methods 0.000 title claims abstract description 12
- 238000010276 construction Methods 0.000 claims abstract description 31
- 238000013461 design Methods 0.000 claims abstract description 28
- 238000012552 review Methods 0.000 claims abstract description 11
- 238000009417 prefabrication Methods 0.000 claims abstract description 9
- 230000008859 change Effects 0.000 claims abstract description 7
- 238000004519 manufacturing process Methods 0.000 claims abstract description 7
- 238000009434 installation Methods 0.000 claims abstract description 6
- 238000007726 management method Methods 0.000 claims description 17
- 238000004590 computer program Methods 0.000 claims description 13
- 238000012795 verification Methods 0.000 claims description 12
- 238000012545 processing Methods 0.000 claims description 9
- 238000009740 moulding (composite fabrication) Methods 0.000 claims description 3
- 210000001503 joint Anatomy 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 13
- 230000006870 function Effects 0.000 description 7
- 238000004891 communication Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 239000010985 leather Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000002085 persistent effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/18—Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2113/00—Details relating to the application field
- G06F2113/14—Pipes
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T2210/00—Indexing scheme for image generation or computer graphics
- G06T2210/04—Architectural design, interior design
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Mathematical Analysis (AREA)
- Computational Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Computer Graphics (AREA)
- Software Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a BIM-based electromechanical system assembling and managing method, system, storage medium and equipment, comprising the following steps: s1, establishing a BIM three-dimensional model according to a civil engineering blueprint and an electromechanical secondary review drawing; s2, adjusting the pipeline; s3, carrying out pipeline plotting on the adjusted pipeline; s4, performing professional examination on the drawings to form electromechanical professional construction blueprints and civil engineering change drawings; s5, forming a feasibility report; s6, performing prefabricated coding on the pipeline to draw a picture; s7, performing pipeline prefabrication production, and transporting to a field for installation; s8, forming a completed BIM three-dimensional model after the installation is completed; and uploading all the data to an enterprise digital project cloud platform, so as to provide a basis for later intelligent management and realize the reuse of enterprise engineering digital asset information. The invention can effectively avoid the inconsistent state of the previous construction design, realize seamless butt joint of design construction, remove unnecessary reworking in advance, improve the efficiency and guarantee the construction period.
Description
Technical Field
The invention relates to the field of prefabrication and processing management, in particular to a BIM-based electromechanical system assembling and managing method, system, storage medium and equipment.
Background
In recent years, the BIM technology has an obvious application effect in the aspect of pipeline synthesis, the collision pipeline is optimized and adjusted by virtually building the pipeline before construction and utilizing the advantages of visualization and cooperative work of the BIM technology, the collision problem possibly existing in later construction is solved in advance, the engineering rework phenomenon is greatly reduced, and the construction efficiency is improved. However, the existing pipe heald optimization scheme is determined based on a design blueprint, and the state of designing and constructing two pieces of leather cannot be solved; in addition, communication with a design party and a construction party does not have a reasonable method, each party has unclear division of labor, and the management efficiency is low.
Disclosure of Invention
The invention aims to provide a BIM-based electromechanical system assembling and managing method, system, storage medium and equipment, which avoids the state of two sheets of sheets in the prior construction design, realizes seamless butt joint of design and construction, removes unnecessary reworking in advance, improves the efficiency and ensures the construction period; in addition, construction design exchange, issuing, checking and management of drawings of the prefabricated pipe fittings are realized through the enterprise digital project cloud platform, and communication efficiency and production efficiency are improved.
The technical scheme of the invention is as follows:
in a first aspect, an embodiment of the present application provides a BIM-based electromechanical system assembling and managing method, including the following specific steps:
s1, establishing a BIM three-dimensional model according to a civil engineering blueprint and an electromechanical secondary review drawing;
s2, performing collision check by using NAVSWORKS software, and adjusting the pipeline;
s3, carrying out pipeline plotting on the adjusted pipeline, marking the elevation and the pipeline position information of the pipeline, and issuing each professional pipeline drawing, a reserved hole drawing and a pipe comprehensive drawing;
s4, uploading the drawing and the model to an enterprise digital project cloud platform, carrying out professional verification on the drawing through construction and design, and forming an electromechanical professional construction blueprint and a civil engineering change map according to the design after the verification is passed;
s5, generating a detailed list of each professional component by using REVIT, counting the number of each professional component, exporting relevant information, and transmitting the relevant information to an enterprise digital project cloud platform to be compared with construction design cost to form a feasibility report;
s6, performing prefabricated coding drawing on the pipeline through REVIT and FABRlCATION;
s7, issuing a drawing to a prefabrication processing factory through an enterprise digital project cloud platform to perform pipeline prefabrication production, and transporting to a site to be installed;
s8, after the installation is finished, carrying out three-dimensional laser scanning on the installed pipeline to obtain a point cloud model, guiding the point cloud model into a REVIT to be compared with the BIM three-dimensional model, and modifying the BIM three-dimensional model according to the point cloud model to form a completed BIM three-dimensional model; and uploading all the data to an enterprise digital project cloud platform, so as to provide a basis for later intelligent management and realize the reuse of enterprise engineering digital asset information.
In the step S1, a BIM civil engineering model is established according to the civil engineering blueprint, an electromechanical model is established according to the electromechanical review drawing, and the two models are matched to form a BIM three-dimensional model.
In step S2, the three-dimensional model is exported as an NWC file by using REVIT, a collision check is performed in NAVISWORKS software to generate a collision report, and pipelines are adjusted according to the generated collision report and a pipeline adjustment principle, so that collision-free and reasonable arrangement of the pipelines is realized.
In the step S6, configuring various information of the pipeline in fabrcatition according to the design description, prefabricating the pipeline through REVIT, selecting a non-prefabricating mode for different pipelines, then rationalizing and segmenting the prefabricated pipeline, encoding each pipeline, exporting the detail list and MAJ files, and uploading the detail list and MAJ files to the enterprise digital project cloud platform.
In a second aspect, embodiments of the present application provide a BIM-based electromechanical systems assembly and management system, including:
the BIM three-dimensional model establishing module is used for establishing a BIM three-dimensional model according to a civil engineering blueprint and an electromechanical secondary review drawing;
the pipeline adjusting module is used for performing collision check by using NAVSISWORKS software and adjusting the pipeline according to a pipeline adjusting principle;
the pipeline drawing module is used for drawing the pipeline of the adjusted pipeline, marking the elevation and the pipeline position information of the pipeline and issuing each professional pipeline drawing, reserved hole drawing and pipe comprehensive drawing;
the drawing and model uploading module is used for uploading the drawing and the model to the enterprise digital project cloud platform;
the enterprise digital project cloud platform is used for design and construction personnel to log in the platform to carry out professional verification on the drawing and the model, and after the verification is passed, the designer forms an electromechanical professional blueprint and a civil engineering change map;
the feasibility report generation module is used for generating a detailed list of each professional component by using the REVIT, counting the number of each professional component, exporting relevant information, and transmitting the relevant information to the enterprise digital project cloud platform to be compared with construction design cost to form a feasibility report;
and the prefabricated code map module performs prefabricated code map on the pipeline through REVIT and FABRlCATION.
In a third aspect, embodiments of the present application provide a computer-readable storage medium having stored thereon a computer program, which, when executed by a processor, causes the processor to perform the steps of the BIM-based electromechanical systems assembly and management method as described above.
In a fourth aspect, embodiments of the present application provide a computer device comprising a memory, a processor, and a computer program stored on the memory and executable on the processor, the processor executing the program to perform the steps of the BIM-based electromechanical systems assembly and management method as described above.
Compared with the prior art, the invention has the beneficial effects that: the state of two sheets of the prior construction design is avoided, seamless butt joint of the design construction is realized, unnecessary reworking is removed in advance, the efficiency is improved, and the construction period is guaranteed; in addition, construction design exchange, issuing, checking and management of drawings of the prefabricated pipe fittings are realized through the enterprise digital project cloud platform, and communication efficiency and production efficiency are improved.
Drawings
FIG. 1 is a schematic flow diagram of the process of the present invention;
FIG. 2 is a drawing for building a BIM three-dimensional model according to a civil engineering blueprint and an electromechanical secondary review drawing in the embodiment of the invention;
FIG. 3 is a schematic diagram illustrating the adjustment of a pipeline by performing collision check using NAVSISWORKS software according to an embodiment of the present invention;
FIG. 4 is a pipeline diagram of the completion of the tuning of the present invention;
FIG. 5 is a diagram of a pipe prefabrication code of an embodiment of the invention;
fig. 6 is a diagram of field installation of an embodiment of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1, the present invention provides a technical solution:
embodiment 1, a BIM-based electromechanical system assembly and management method, comprising the following specific steps:
s1, establishing a BIM three-dimensional model according to a civil engineering blueprint and an electromechanical secondary review drawing, as shown in a figure 2;
s2, performing collision check by using NAVSWORKS software, and adjusting the pipeline, as shown in FIG. 3;
s3, carrying out pipeline plotting on the adjusted pipeline, marking the elevation and the pipeline position information of the pipeline, and issuing each professional pipeline drawing, a reserved hole drawing and a pipe comprehensive drawing as shown in FIG. 4;
s4, uploading the drawing and the model to an enterprise digital project cloud platform, carrying out professional verification on the drawing through construction and design, and forming an electromechanical professional construction blueprint and a civil engineering change map according to the design after the verification is passed;
s5, generating a detailed list of each professional component by using REVIT, counting the number of each professional component, exporting relevant information, and transmitting the relevant information to an enterprise digital project cloud platform to be compared with construction design cost to form a feasibility report;
s6, performing prefabricated coding graph on the pipeline through REVIT and FABRlCATION, as shown in FIG. 5;
s7, issuing a drawing to a prefabrication processing factory through an enterprise digital project cloud platform to perform pipeline prefabrication production, and transporting to a site to be installed, as shown in FIG. 6;
s8, after the installation is finished, carrying out three-dimensional laser scanning on the installed pipeline to obtain a point cloud model, guiding the point cloud model into a REVIT to be compared with the BIM three-dimensional model, and modifying the BIM three-dimensional model according to the point cloud model to form a completed BIM three-dimensional model; and uploading all the data to an enterprise digital project cloud platform, so as to provide a basis for later intelligent management and realize the reuse of enterprise engineering digital asset information.
In the step S1, a BIM civil engineering model is established according to the civil engineering blueprint, an electromechanical model is established according to the electromechanical review drawing, and the two models are matched to form a BIM three-dimensional model.
In step S2, the three-dimensional model is exported as an NWC file by using REVIT, a collision check is performed in NAVISWORKS software to generate a collision report, and pipelines are adjusted according to the generated collision report and a pipeline adjustment principle, so that collision-free and reasonable arrangement of the pipelines is realized.
In the step S6, configuring various information of the pipeline in fabrcatition according to the design description, prefabricating the pipeline through REVIT, selecting a non-prefabricating mode for different pipelines, then rationalizing and segmenting the prefabricated pipeline, encoding each pipeline, exporting the detail list and MAJ files, and uploading the detail list and MAJ files to the enterprise digital project cloud platform.
Embodiment 2, a BIM-based electromechanical system assembly and management system, comprising:
the BIM three-dimensional model establishing module is used for establishing a BIM three-dimensional model according to a civil engineering blueprint and an electromechanical secondary review drawing;
the pipeline adjusting module is used for performing collision check by using NAVSISWORKS software and adjusting the pipeline according to a pipeline adjusting principle;
the pipeline drawing module is used for drawing the pipeline of the adjusted pipeline, marking the elevation and the pipeline position information of the pipeline and issuing each professional pipeline drawing, reserved hole drawing and pipe comprehensive drawing;
the drawing and model uploading module is used for uploading the drawing and the model to the enterprise digital project cloud platform;
the enterprise digital project cloud platform is used for design and construction personnel to log in the platform to carry out professional verification on the drawing and the model, and after the verification is passed, the designer forms an electromechanical professional blueprint and a civil engineering change map;
the feasibility report generation module is used for generating a detailed list of each professional component by using the REVIT, counting the number of each professional component, exporting relevant information, and transmitting the relevant information to the enterprise digital project cloud platform to be compared with construction design cost to form a feasibility report;
and the prefabricated code map module performs prefabricated code map on the pipeline through REVIT and FABRlCATION.
Embodiment 3, a computer-readable storage medium, the computer storage medium divided into two tiers, the first tier controlled directly by a processor, which provides a space floor for computer program execution and provides functions of relocation, real-time protection and sharing during computer program execution. The second level is responsible for persisting computer data and programs, which enables data interaction and transfer with the processor and the first level via the input/output modules. The required computer performs the steps of the BIM based electromechanical systems assembly and management method as described above.
Embodiment 4, a computer device, comprising a processor, a memory, and an input/output module. Each module is divided into a plurality of components. Wherein the processor controls computer operations, performs data processing functions responsible for performing the steps of the BIM-based electromechanical systems assembly and management method as described above; the memory provides a place for storing programs needed to be executed by the controller and stores data generated in the execution process; the input and output module is connected with external equipment through modes of program control, interrupt drive, direct memory access and the like and realizes a data function with the external equipment.
As will be appreciated by one skilled in the art, embodiments of the present application may be provided as a method, system, or computer program product. Accordingly, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
The present application is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the application. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. A BIM-based electromechanical system assembling and managing method is characterized by comprising the following specific steps:
s1, establishing a BIM three-dimensional model according to a civil engineering blueprint and an electromechanical secondary review drawing;
s2, performing collision check by using NAVSWORKS software, and adjusting the pipeline;
s3, carrying out pipeline plotting on the adjusted pipeline, marking the elevation and the pipeline position information of the pipeline, and issuing each professional pipeline drawing, a reserved hole drawing and a pipe comprehensive drawing;
s4, uploading the drawing and the model to an enterprise digital project cloud platform, carrying out professional verification on the drawing through construction and design, and forming an electromechanical professional construction blueprint and a civil engineering change map according to the design after the verification is passed;
s5, generating a detailed list of each professional component by using REVIT, counting the number of each professional component, exporting relevant information, and transmitting the relevant information to an enterprise digital project cloud platform to be compared with construction design cost to form a feasibility report;
s6, performing prefabricated coding drawing on the pipeline through REVIT and FABRlCATION;
s7, issuing a drawing to a prefabrication processing factory through an enterprise digital project cloud platform to perform pipeline prefabrication production, and transporting to a site to be installed;
s8, after the installation is finished, carrying out three-dimensional laser scanning on the installed pipeline to obtain a point cloud model, guiding the point cloud model into a REVIT to be compared with the BIM three-dimensional model, and modifying the BIM three-dimensional model according to the point cloud model to form a completed BIM three-dimensional model; and uploading all the data to an enterprise digital project cloud platform, so as to provide a basis for later intelligent management and realize the reuse of enterprise engineering digital asset information.
2. The BIM-based electromechanical system assembling and managing method according to claim 1, wherein in step S1, a BIM civil engineering model is built according to a civil blueprint, an electromechanical model is built according to an electromechanical review drawing, and the two models are matched to form a BIM three-dimensional model.
3. The BIM-based electromechanical system assembling and managing method of claim 1, wherein in step S2, the REVIT is used to export the three-dimensional model into NWC file, the NAVSWORKS software is used to perform collision check to generate collision report, and the pipelines are adjusted according to the generated collision report and pipeline adjusting principle to realize collision-free and reasonable arrangement of pipelines.
4. The BIM-based electromechanical system assembling and managing method according to claim 1, wherein in step S6, each item of information of a pipeline is configured in FABRlCATION according to a design specification, the pipeline is prefabricated through REVIT, different pipelines are selected to be in a non-prefabricated mode, then the prefabricated pipeline is reasonably segmented, each pipeline is encoded, and a detail table and an MAJ file are derived and uploaded to an enterprise digital project cloud platform.
5. A BIM-based electromechanical system assembly and management system, comprising:
the BIM three-dimensional model establishing module is used for establishing a BIM three-dimensional model according to a civil engineering blueprint and an electromechanical secondary review drawing;
the pipeline adjusting module is used for performing collision check by using NAVSISWORKS software and adjusting the pipeline according to a pipeline adjusting principle;
the pipeline drawing module is used for drawing the pipeline of the adjusted pipeline, marking the elevation and the pipeline position information of the pipeline and issuing each professional pipeline drawing, reserved hole drawing and pipe comprehensive drawing;
the drawing and model uploading module is used for uploading the drawing and the model to the enterprise digital project cloud platform;
the enterprise digital project cloud platform is used for design and construction personnel to log in the platform to carry out professional verification on the drawing and the model, and after the verification is passed, the designer forms an electromechanical professional blueprint and a civil engineering change map;
the feasibility report generation module is used for generating a detailed list of each professional component by using the REVIT, counting the number of each professional component, exporting relevant information, and transmitting the relevant information to the enterprise digital project cloud platform to be compared with construction design cost to form a feasibility report;
and the prefabricated code map module performs prefabricated code map on the pipeline through REVIT and FABRlCATION.
6. A computer readable storage medium having a computer program stored thereon, which, when executed by a processor, causes the processor to perform the steps of the BIM based electromechanical systems assembly and management method of any one of claims 1-4.
7. A computer device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, wherein the processor when executing the program performs the steps of the BIM based electromechanical systems assembly and management method of any one of claims 1 to 4.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210007407.1A CN114417466B (en) | 2022-01-05 | 2022-01-05 | BIM-based electromechanical system assembling and managing method, system, storage medium and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210007407.1A CN114417466B (en) | 2022-01-05 | 2022-01-05 | BIM-based electromechanical system assembling and managing method, system, storage medium and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114417466A true CN114417466A (en) | 2022-04-29 |
CN114417466B CN114417466B (en) | 2024-04-02 |
Family
ID=81270577
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210007407.1A Active CN114417466B (en) | 2022-01-05 | 2022-01-05 | BIM-based electromechanical system assembling and managing method, system, storage medium and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114417466B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116305654A (en) * | 2023-03-24 | 2023-06-23 | 中铁四局集团电气化工程有限公司 | Substation equipment assembling and debugging method based on BIM cloud platform |
CN116704009A (en) * | 2023-08-10 | 2023-09-05 | 深圳普达核工业数字测控有限公司 | Construction measurement data processing method, device and equipment based on prefabricated component |
CN116910882A (en) * | 2023-08-07 | 2023-10-20 | 广州市创博机电设备安装有限公司 | Assembled integral installation system and method for building electromechanical engineering |
CN117494356A (en) * | 2023-10-31 | 2024-02-02 | 成都建工第九建筑工程有限公司 | Assembled construction method based on BIM technology |
WO2024045615A1 (en) * | 2022-09-02 | 2024-03-07 | 中冶南方工程技术有限公司 | Automatic labeling method and system for pipeline three-dimensional building information modeling |
CN118038482A (en) * | 2024-04-12 | 2024-05-14 | 江西少科智能建造科技有限公司 | Building bottom reinforcement area height inspection method, system, storage medium and equipment |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20180247002A1 (en) * | 2017-02-28 | 2018-08-30 | Applied Software Technology, Inc. | Custom fabrication from generic revit templates |
CN112926166A (en) * | 2020-12-18 | 2021-06-08 | 云南云岭工程造价咨询有限公司 | Electromechanical comprehensive optimization method based on BIM technology |
-
2022
- 2022-01-05 CN CN202210007407.1A patent/CN114417466B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20180247002A1 (en) * | 2017-02-28 | 2018-08-30 | Applied Software Technology, Inc. | Custom fabrication from generic revit templates |
CN112926166A (en) * | 2020-12-18 | 2021-06-08 | 云南云岭工程造价咨询有限公司 | Electromechanical comprehensive optimization method based on BIM technology |
Non-Patent Citations (1)
Title |
---|
付逸群;: "BIM技术在南阳东站机电工程中的应用研究", 铁路计算机应用, no. 02, 25 February 2020 (2020-02-25) * |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2024045615A1 (en) * | 2022-09-02 | 2024-03-07 | 中冶南方工程技术有限公司 | Automatic labeling method and system for pipeline three-dimensional building information modeling |
CN116305654A (en) * | 2023-03-24 | 2023-06-23 | 中铁四局集团电气化工程有限公司 | Substation equipment assembling and debugging method based on BIM cloud platform |
CN116305654B (en) * | 2023-03-24 | 2023-11-10 | 中铁四局集团电气化工程有限公司 | Substation equipment assembling and debugging method based on BIM cloud platform |
CN116910882A (en) * | 2023-08-07 | 2023-10-20 | 广州市创博机电设备安装有限公司 | Assembled integral installation system and method for building electromechanical engineering |
CN116910882B (en) * | 2023-08-07 | 2024-02-09 | 广州市创博机电设备安装有限公司 | Assembled integral installation system and method for building electromechanical engineering |
CN116704009A (en) * | 2023-08-10 | 2023-09-05 | 深圳普达核工业数字测控有限公司 | Construction measurement data processing method, device and equipment based on prefabricated component |
CN116704009B (en) * | 2023-08-10 | 2023-12-01 | 深圳普达核工业数字测控有限公司 | Construction measurement data processing method, device and equipment based on prefabricated component |
CN117494356A (en) * | 2023-10-31 | 2024-02-02 | 成都建工第九建筑工程有限公司 | Assembled construction method based on BIM technology |
CN118038482A (en) * | 2024-04-12 | 2024-05-14 | 江西少科智能建造科技有限公司 | Building bottom reinforcement area height inspection method, system, storage medium and equipment |
CN118038482B (en) * | 2024-04-12 | 2024-06-25 | 江西少科智能建造科技有限公司 | Building bottom reinforcement area height inspection method, system, storage medium and equipment |
Also Published As
Publication number | Publication date |
---|---|
CN114417466B (en) | 2024-04-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN114417466A (en) | BIM-based electromechanical system assembling and managing method, system, storage medium and equipment | |
JP7054250B2 (en) | Quick custom design methods and systems for smart factories | |
CN109145362B (en) | A power grid modeling method and system | |
WO2021228118A1 (en) | Central air conditioner intelligent design method, system and device | |
CN103400228B (en) | The creation method of engineering information model after railway and city rail traffic station | |
US20180101164A1 (en) | Templates in a multidisciplinary engineering system | |
KR20140059719A (en) | System and method for generating ship construction simulation based on working sequence diagram | |
CN104407576A (en) | Realization method for general type production and manufacturing unit and control system thereof | |
CN110222407A (en) | A kind of fusion method and device of BIM data | |
CN103902757A (en) | System and method for rapid creation and interaction of three-dimensional model | |
CN114117798A (en) | Automatic interface model generation method and system based on matlab | |
Saraireh et al. | Understanding the conceptual of building information modeling: a literature review | |
Lei et al. | Measurement of information loss and transfer impacts of technology systems in offsite construction processes | |
CN111581700A (en) | Method for adding BIM attribute and outputting BIM attribute table based on CATIA model | |
CN115689464A (en) | Assembly type building EPC general contract project management method and system based on BIM | |
CN103377076A (en) | Method and system for adjusting task execution plans during operation | |
CN103693163A (en) | Digital information integration method of LNG (Liquefied Natural Gas) ship | |
CN103745067A (en) | Power generator stator end parameterization automatic modeling system and method | |
KR20130134590A (en) | Method and system for managing an information of material in the ship | |
CN117952342A (en) | Construction plan generation method and system integrating process knowledge base and space constraints | |
CN117075896A (en) | Process engine implementation method based on active custom form | |
CN115422035A (en) | Automatic development method and system of virtual ECU model | |
CN109492953A (en) | A kind of provide multiple forms of energy to complement each other monitoring and managing method and system based on Building Information Model | |
CN111080771B (en) | Information model construction method applied to three-dimensional intelligent aided design | |
Li et al. | The application value of BIM technology in prefabricated building based on EPC general contracting management model |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |