CN113463522A - 一种盖梁施工辅助装置及方法 - Google Patents
一种盖梁施工辅助装置及方法 Download PDFInfo
- Publication number
- CN113463522A CN113463522A CN202110922839.0A CN202110922839A CN113463522A CN 113463522 A CN113463522 A CN 113463522A CN 202110922839 A CN202110922839 A CN 202110922839A CN 113463522 A CN113463522 A CN 113463522A
- Authority
- CN
- China
- Prior art keywords
- bracket
- triangular
- pier stud
- pier
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 137
- 238000000034 method Methods 0.000 title claims abstract description 75
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 144
- 239000010959 steel Substances 0.000 claims abstract description 144
- 238000003466 welding Methods 0.000 claims description 17
- 230000009471 action Effects 0.000 claims description 11
- 230000008878 coupling Effects 0.000 claims 1
- 238000010168 coupling process Methods 0.000 claims 1
- 238000005859 coupling reaction Methods 0.000 claims 1
- 230000008569 process Effects 0.000 abstract description 31
- 230000008901 benefit Effects 0.000 abstract description 7
- 230000000875 corresponding effect Effects 0.000 description 27
- 239000004567 concrete Substances 0.000 description 19
- 238000009434 installation Methods 0.000 description 15
- 239000011378 shotcrete Substances 0.000 description 12
- 230000000694 effects Effects 0.000 description 11
- 238000012545 processing Methods 0.000 description 10
- 230000005489 elastic deformation Effects 0.000 description 9
- 238000012544 monitoring process Methods 0.000 description 8
- 238000009415 formwork Methods 0.000 description 6
- 238000005259 measurement Methods 0.000 description 6
- 238000003825 pressing Methods 0.000 description 6
- 230000008859 change Effects 0.000 description 5
- 238000013480 data collection Methods 0.000 description 5
- 238000006073 displacement reaction Methods 0.000 description 5
- 238000007689 inspection Methods 0.000 description 5
- 239000000463 material Substances 0.000 description 5
- 230000036316 preload Effects 0.000 description 5
- 230000002411 adverse Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 238000011065 in-situ storage Methods 0.000 description 4
- 238000002360 preparation method Methods 0.000 description 4
- 230000002829 reductive effect Effects 0.000 description 4
- 238000004364 calculation method Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 238000003384 imaging method Methods 0.000 description 3
- 238000013507 mapping Methods 0.000 description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 238000005096 rolling process Methods 0.000 description 3
- 238000005056 compaction Methods 0.000 description 2
- 230000001276 controlling effect Effects 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 230000005571 horizontal transmission Effects 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 230000001174 ascending effect Effects 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000036961 partial effect Effects 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 239000011241 protective layer Substances 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 230000007261 regionalization Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000011265 semifinished product Substances 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110922839.0A CN113463522B (zh) | 2021-08-11 | 2021-08-11 | 一种盖梁施工辅助装置及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110922839.0A CN113463522B (zh) | 2021-08-11 | 2021-08-11 | 一种盖梁施工辅助装置及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113463522A true CN113463522A (zh) | 2021-10-01 |
CN113463522B CN113463522B (zh) | 2023-06-02 |
Family
ID=77866444
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110922839.0A Active CN113463522B (zh) | 2021-08-11 | 2021-08-11 | 一种盖梁施工辅助装置及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113463522B (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114164765A (zh) * | 2021-12-20 | 2022-03-11 | 中铁一局集团有限公司 | 一种狭小空间内现浇盖梁临时支撑装配式拆装方法 |
CN114575259A (zh) * | 2022-03-18 | 2022-06-03 | 中电建路桥集团有限公司 | 一种模板调节装置 |
CN114717956A (zh) * | 2022-04-01 | 2022-07-08 | 贵州大通路桥工程建设有限公司 | 一种桥梁墩柱横隔板施工伞形支撑体系 |
CN114908671A (zh) * | 2022-04-15 | 2022-08-16 | 中铁十六局集团第四工程有限公司 | 一种高架桥施工过程中用的盖梁支架 |
CN117147308A (zh) * | 2023-08-16 | 2023-12-01 | 江苏恒逸明新材料科技有限公司 | 一种混凝土预制构件强度检测装置及方法 |
CN119180428A (zh) * | 2024-11-26 | 2024-12-24 | 成都建工第三建筑工程有限公司 | 高大模板支撑架施工期缺陷检测和安全评价方法 |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011162945A (ja) * | 2010-02-05 | 2011-08-25 | Okumura Corp | 橋脚の張出し梁部施工用回転支持構造 |
CN203021923U (zh) * | 2012-12-26 | 2013-06-26 | 浙江省交通工程建设集团有限公司 | 大悬臂盖梁钢桁架施工平台 |
CN105819339A (zh) * | 2016-04-29 | 2016-08-03 | 华中科技大学 | 一种大型吊装作业虚拟指挥舱及其工作方法 |
KR20170072080A (ko) * | 2015-12-16 | 2017-06-26 | 주식회사 신원알피씨 | 교량 캔틸레버부 및 그 시공방법 |
CN107091613A (zh) * | 2017-06-02 | 2017-08-25 | 云峰发电厂 | 水轮发电机大部件安装、拆卸吊装过程中位置精确测量及报警方法 |
CN107100076A (zh) * | 2017-02-27 | 2017-08-29 | 中铁十九局集团有限公司 | 一种现浇盖梁施工方法 |
CN107653781A (zh) * | 2017-09-20 | 2018-02-02 | 龙元建设集团股份有限公司 | 用于盖梁现浇施工的大钢管桁架及施工方法 |
CN108382998A (zh) * | 2018-03-26 | 2018-08-10 | 上海振华重工(集团)股份有限公司 | 吊装系统的自动控制方法及装置 |
CN208501518U (zh) * | 2018-07-11 | 2019-02-15 | 四川大航建设工程有限公司 | 一种盖梁施工用托架 |
CN209857914U (zh) * | 2019-07-04 | 2019-12-27 | 中铁电气化局集团有限公司 | 用于地铁供电安装的定位检测装置 |
CN111270755A (zh) * | 2020-01-22 | 2020-06-12 | 哈尔滨工业大学 | 一种基于主动消能技术的垂直绿化智能组拼结构 |
CN212000638U (zh) * | 2019-12-26 | 2020-11-24 | 宁波建工工程集团有限公司 | 高架盖梁型钢支撑结构 |
CN213867405U (zh) * | 2020-11-30 | 2021-08-03 | 中国建筑第五工程局有限公司 | 一种独柱盖梁钢管柱贝雷梁施工支撑系统 |
-
2021
- 2021-08-11 CN CN202110922839.0A patent/CN113463522B/zh active Active
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011162945A (ja) * | 2010-02-05 | 2011-08-25 | Okumura Corp | 橋脚の張出し梁部施工用回転支持構造 |
CN203021923U (zh) * | 2012-12-26 | 2013-06-26 | 浙江省交通工程建设集团有限公司 | 大悬臂盖梁钢桁架施工平台 |
KR20170072080A (ko) * | 2015-12-16 | 2017-06-26 | 주식회사 신원알피씨 | 교량 캔틸레버부 및 그 시공방법 |
CN105819339A (zh) * | 2016-04-29 | 2016-08-03 | 华中科技大学 | 一种大型吊装作业虚拟指挥舱及其工作方法 |
CN107100076A (zh) * | 2017-02-27 | 2017-08-29 | 中铁十九局集团有限公司 | 一种现浇盖梁施工方法 |
CN107091613A (zh) * | 2017-06-02 | 2017-08-25 | 云峰发电厂 | 水轮发电机大部件安装、拆卸吊装过程中位置精确测量及报警方法 |
CN107653781A (zh) * | 2017-09-20 | 2018-02-02 | 龙元建设集团股份有限公司 | 用于盖梁现浇施工的大钢管桁架及施工方法 |
CN108382998A (zh) * | 2018-03-26 | 2018-08-10 | 上海振华重工(集团)股份有限公司 | 吊装系统的自动控制方法及装置 |
CN208501518U (zh) * | 2018-07-11 | 2019-02-15 | 四川大航建设工程有限公司 | 一种盖梁施工用托架 |
CN209857914U (zh) * | 2019-07-04 | 2019-12-27 | 中铁电气化局集团有限公司 | 用于地铁供电安装的定位检测装置 |
CN212000638U (zh) * | 2019-12-26 | 2020-11-24 | 宁波建工工程集团有限公司 | 高架盖梁型钢支撑结构 |
CN111270755A (zh) * | 2020-01-22 | 2020-06-12 | 哈尔滨工业大学 | 一种基于主动消能技术的垂直绿化智能组拼结构 |
CN213867405U (zh) * | 2020-11-30 | 2021-08-03 | 中国建筑第五工程局有限公司 | 一种独柱盖梁钢管柱贝雷梁施工支撑系统 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114164765A (zh) * | 2021-12-20 | 2022-03-11 | 中铁一局集团有限公司 | 一种狭小空间内现浇盖梁临时支撑装配式拆装方法 |
CN114575259A (zh) * | 2022-03-18 | 2022-06-03 | 中电建路桥集团有限公司 | 一种模板调节装置 |
CN114575259B (zh) * | 2022-03-18 | 2023-09-29 | 中电建路桥集团有限公司 | 一种模板调节装置 |
CN114717956A (zh) * | 2022-04-01 | 2022-07-08 | 贵州大通路桥工程建设有限公司 | 一种桥梁墩柱横隔板施工伞形支撑体系 |
CN114908671A (zh) * | 2022-04-15 | 2022-08-16 | 中铁十六局集团第四工程有限公司 | 一种高架桥施工过程中用的盖梁支架 |
CN117147308A (zh) * | 2023-08-16 | 2023-12-01 | 江苏恒逸明新材料科技有限公司 | 一种混凝土预制构件强度检测装置及方法 |
CN117147308B (zh) * | 2023-08-16 | 2024-04-19 | 江苏恒逸明新材料科技有限公司 | 一种混凝土预制构件强度检测装置及方法 |
CN119180428A (zh) * | 2024-11-26 | 2024-12-24 | 成都建工第三建筑工程有限公司 | 高大模板支撑架施工期缺陷检测和安全评价方法 |
Also Published As
Publication number | Publication date |
---|---|
CN113463522B (zh) | 2023-06-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113463522B (zh) | 一种盖梁施工辅助装置及方法 | |
CN106836498B (zh) | 一种超大跨度体育场看台屋盖钢桁架吊装施工工法 | |
AU2013212529B2 (en) | Automated formwork climbing system | |
CN113513160B (zh) | 一种地下室高大模板支撑体系的施工方法 | |
CN105586833B (zh) | 劲性骨架钢筋笼整体成型大型现浇薄壁高墩施工方法 | |
CN104141383A (zh) | 一种贝雷梁悬吊模板支撑体系及其施工工法 | |
CN203947771U (zh) | 一种贝雷梁悬吊模板支撑体系 | |
CN111877345B (zh) | 用于水域内钢栈桥施工的钢管桩定位装置及施工方法 | |
CN112324131B (zh) | 一架两用大跨度劲性梁施工结构及其施工工法 | |
CN111794119A (zh) | 一种提篮式钢箱系杆拱临时支撑系统及吊装方法 | |
CN115467421A (zh) | 一种复杂大跨钢屋盖吊装施工方法 | |
CN112942808A (zh) | 一种结合机械化施工的组合模板施工方法 | |
CN111663457A (zh) | 拼装模块、模块化施工平台及方法、桥梁墩台施工方法 | |
CN104153479B (zh) | 反力板加载孔施工方法及其施工装置 | |
CN115323924B (zh) | 一种公铁两用跨江a型斜拉桥主塔施工方法 | |
CN113958133B (zh) | 钢结构厂房屋架梁施工方法 | |
WO2016130100A1 (en) | A novel concrete molding system | |
CN112942809A (zh) | 一种可机械化施工的组合模板拼装方法 | |
CN212270703U (zh) | 一种桥面板承重组合支架 | |
CN209894497U (zh) | 一种可调式结构力学试验平台 | |
CN209907886U (zh) | 一种可调节的装配式楼梯施工平台 | |
CN213683191U (zh) | 一架两用大跨度劲性梁施工结构 | |
CN218952751U (zh) | 一种用于空心建筑施工的操作平台 | |
CN111608691B (zh) | 盾构工作井模板支架施工方法 | |
CN115045425B (zh) | 楼板支撑结构及支撑结构安装方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Jia Yunfei Inventor after: Li Bin Inventor after: Liu Aoran Inventor after: Huo Junchao Inventor after: Zhong Chen Inventor after: Huo Yanlin Inventor after: Zhao Dongmei Inventor after: Zhou Liping Inventor after: Guo Zhe Inventor after: Yuan Libin Inventor after: Zhu Pan Inventor after: Huang Xuemei Inventor after: Yang Weihua Inventor before: Jia Yunfei Inventor before: Liu Aoran Inventor before: Huo Junchao Inventor before: Zhong Chen Inventor before: Huo Yanlin Inventor before: Zhou Liping Inventor before: Guo Zhe Inventor before: Yuan Libin Inventor before: Zhu Pan Inventor before: Huang Xuemei Inventor before: Yang Weihua Inventor before: Li Bin |
|
GR01 | Patent grant | ||
GR01 | Patent grant |