CN109972654A - A J-type anchor high retaining wall and its construction method - Google Patents
A J-type anchor high retaining wall and its construction method Download PDFInfo
- Publication number
- CN109972654A CN109972654A CN201910383704.4A CN201910383704A CN109972654A CN 109972654 A CN109972654 A CN 109972654A CN 201910383704 A CN201910383704 A CN 201910383704A CN 109972654 A CN109972654 A CN 109972654A
- Authority
- CN
- China
- Prior art keywords
- wall
- type
- panel wall
- anchor pole
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 39
- 239000011435 rock Substances 0.000 claims abstract description 32
- 239000004567 concrete Substances 0.000 claims description 22
- 239000002689 soil Substances 0.000 claims description 7
- 239000012530 fluid Substances 0.000 claims description 6
- 239000004576 sand Substances 0.000 claims description 6
- 239000004575 stone Substances 0.000 claims description 4
- 238000005056 compaction Methods 0.000 claims 2
- 238000004140 cleaning Methods 0.000 claims 1
- 230000006641 stabilisation Effects 0.000 claims 1
- 238000011105 stabilization Methods 0.000 claims 1
- 239000000758 substrate Substances 0.000 claims 1
- 230000002787 reinforcement Effects 0.000 abstract description 4
- 238000005457 optimization Methods 0.000 abstract description 2
- 230000015572 biosynthetic process Effects 0.000 description 3
- 230000005484 gravity Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0225—Retaining or protecting walls comprising retention means in the backfill
- E02D29/0233—Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/76—Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Revetment (AREA)
Abstract
本发明涉及路基工程技术领域,公开了一种J型锚杆高挡墙及其施工方法,高挡墙设置于出现滑动的岩石边坡高路堤外侧,包括了J型板式墙和若干锚杆,若干的锚杆斜向穿过J型板式墙直插入稳定岩石边坡中,通过结构优化设计,利用小型施工设备,在不破坏现有边坡稳定性状况前提下,顺利进行路堤加固修复;经过合理设计的高档墙,解决了山区公路建设中存在场地狭小、靠近河流或建筑物、周边环境不利、大型施工设备无法进驻开展工作等不利状况,仍能够顺利完成加固修复任务。
The invention relates to the technical field of subgrade engineering, and discloses a J-shaped anchor high retaining wall and a construction method thereof. The high retaining wall is arranged outside the high embankment of a rock slope where sliding occurs, and includes a J-shaped plate wall and several anchors. A number of anchor rods obliquely pass through the J-shaped plate wall and are inserted into the stable rock slope. Through the structural optimization design and the use of small construction equipment, the embankment is successfully reinforced and repaired without destroying the stability of the existing slope; after The rationally designed high-grade wall solves the unfavorable conditions in the construction of mountainous roads such as narrow site, close to rivers or buildings, unfavorable surrounding environment, and the inability of large construction equipment to carry out work, and can still successfully complete the reinforcement and repair task.
Description
技术领域technical field
本发明涉及路基工程技术领域,特别是一种J型锚杆高挡墙及其施工方法。The invention relates to the technical field of subgrade engineering, in particular to a high retaining wall with J-shaped anchor rods and a construction method thereof.
背景技术Background technique
随着我国山区新农村公路建设的发展,由于受到场地狭小、靠近河流或建筑物、周边环境不利、大型施工设备无法进驻开展工作等因素的限制,常常需要在垮塌高路堤地段重新修复。迫切需要一种不再破坏现有边坡,人工及简易设备能开展工作便于施工的结构。With the development of new rural road construction in mountainous areas of our country, due to the constraints of small sites, proximity to rivers or buildings, unfavorable surrounding environment, and the inability of large construction equipment to carry out work and other factors, it is often necessary to re-repair the collapsed high embankment. There is an urgent need for a structure that no longer destroys the existing slope, and can work with manual and simple equipment to facilitate construction.
CN 104762978 A公开了“一种用于高边坡支护的锚杆重力式挡墙及其制作方法”,靠近岩石坡面采用一道浆砌石挡墙进行初步支护,然后再做钢筋混凝土护面墙和锚杆进行进一步防护。其形状为I型,适用于基底为岩石等地基承载力较高且路面需要拓宽的情况。CN 104762978 A discloses "A Bolt Gravity Retaining Wall for High Slope Support and Its Manufacturing Method". A grouted stone retaining wall is used near the rock slope for preliminary support, and then reinforced concrete protection is used. Face walls and anchors for further protection. Its shape is I-type, which is suitable for the situation where the base is rock and the foundation has a high bearing capacity and the road surface needs to be widened.
CN 208328983 U公布了“一种岩石地基道路挡土墙加高结构”。是在原来I型重力式挡墙上面增加一道L型挡墙,L型挡墙底板位于路基内侧,靠路基土荷载反压防止挡墙倾覆。CN 208328983 U discloses "a kind of heightening structure of rock foundation road retaining wall". It is to add an L-shaped retaining wall on top of the original I-type gravity retaining wall. The bottom plate of the L-shaped retaining wall is located inside the roadbed, and the back pressure of the roadbed soil load prevents the retaining wall from overturning.
CN 103266622 B发明了“跨越式异形扶壁 L 型挡墙结构”。上部采用L型扶壁式挡墙,下部设抗滑桩。主要适用于周围有建筑物场地狭小空间。CN 103266622 B invented "L-shaped retaining wall structure with spanning special-shaped buttress". The upper part adopts L-shaped buttress retaining wall, and the lower part is equipped with anti-slide piles. It is mainly suitable for narrow spaces with buildings around.
由于靠近河流且已经出现滑动的公路岩石高边坡,必须减小对现有边坡的扰动,现有技术未能提供有效可靠的支护方法,存在的问题为:Due to the high rocky slope of the road that is close to the river and has already slipped, the disturbance to the existing slope must be reduced. The existing technology has not provided an effective and reliable support method. The existing problems are:
1、对边坡扰动会造成施工期间滑动;1. Disturbance to the slope will cause sliding during construction;
2、挡墙因地基承载力不足导致基础下沉;2. The foundation of the retaining wall sinks due to insufficient bearing capacity of the foundation;
3、挡墙抗倾覆不满足要求;3. The overturning resistance of the retaining wall does not meet the requirements;
4、挡墙太高施工难度大,需要大型施工设备,费用高。4. If the retaining wall is too high, it will be difficult to construct, requiring large-scale construction equipment and high cost.
发明内容Contents of the invention
本发明的目的在于提供一种J型锚杆高挡墙及其施工方法,利用小型施工设备不破坏现有边坡稳定性状况前提下,顺利进行路堤加固修复。The object of the present invention is to provide a J-bolt high retaining wall and its construction method, which can carry out embankment reinforcement and repair smoothly under the premise of using small construction equipment without destroying the stability of the existing slope.
为实现上述技术目的,达到上述技术效果,本发明公开了一种J型锚杆高挡墙及其施工方法,高挡墙设置于出现滑动的岩石边坡高路堤外侧,包括了J型板式墙和若干锚杆,J型板式墙下部为基础座,位于基岩或密实稳定地层上方, J型板式墙上部与岩石坡面相接触,若干的锚杆斜向穿过J型板式墙直插入岩石边坡中。In order to achieve the above-mentioned technical purpose and achieve the above-mentioned technical effect, the present invention discloses a J-bolt high retaining wall and its construction method. The high retaining wall is arranged outside the high embankment of the rock slope where sliding occurs, and includes a J-shaped plate wall And several bolts, the lower part of the J-shaped plate wall is the foundation seat, which is located above the bedrock or dense and stable stratum, the upper part of the J-shaped plate wall is in contact with the rock slope, and several anchors obliquely pass through the J-shaped plate wall and insert into the rock in the slope.
进一步的,J型板式墙高度小于10m时设置为一级板式墙。Further, when the height of the J-shaped panel wall is less than 10m, it is set as a first-class panel wall.
进一步的,J型板式墙高度大于10m时设置为二级或多级板式墙。Further, when the height of the J-shaped panel wall is greater than 10m, it is set as a secondary or multi-level panel wall.
优选的,当J型板式墙高度大于10m需要设置二级或多级板式墙时,为了增大挡墙抗倾覆稳定性及便于上部施工,还需要增加毛石砼配重,毛石砼配重设置于J型板式墙的一级墙外侧位置。Preferably, when the height of the J-shaped slab wall is greater than 10m and it is necessary to set up two or more slab walls, in order to increase the anti-overturning stability of the retaining wall and facilitate the construction of the upper part, it is also necessary to increase the rubble concrete counterweight, and the rubble concrete counterweight Set on the outer side of the first-level wall of the J-shaped panel wall.
其中,J型板式墙每间隔3m设置排水孔,每间隔15m设置伸缩缝。Among them, the J-shaped panel wall is provided with drainage holes every 3m, and expansion joints are set every 15m.
其中,J型板式墙与岩石坡面的接触缝隙填充有自密实流态稳定土或分层回填级配砂石。Among them, the contact gap between the J-shaped slab wall and the rock slope is filled with self-compacting fluid state stable soil or layered backfilling graded sand and gravel.
优选的,还包括有毛石砼换填基础,毛石砼换填基础设置于J型板式墙基础座下方。Preferably, the rubble concrete replacement foundation is also included, and the rubble concrete replacement foundation is arranged under the base of the J-shaped slab wall foundation.
一种J型锚杆高挡墙的施工方法,具体施工步骤如下:A construction method for a J-bolt high retaining wall, the specific construction steps are as follows:
(1)首先进行坡面清理,将坡面危石清理干净;(1) Clean up the slope first, and clean up the dangerous rocks on the slope;
(2)基槽开挖至岩层顶部,采用毛石砼换填基础稳固基底;(2) The foundation trench is excavated to the top of the rock formation, and the foundation is replaced with rubble concrete to stabilize the foundation;
(3)施工J型板式墙的基础座;(3) Construction of the foundation seat of the J-shaped panel wall;
(4)施工J型板式墙的上部挡墙,随着挡墙逐步加高预留锚孔,J型板式墙每间隔3m设置排水孔,每间隔15m设置伸缩缝;并进行墙缝填筑,墙缝填筑为自密实流态稳定土或分层回填级配砂石;(4) Construction of the upper retaining wall of the J-shaped panel wall. As the retaining wall is gradually increased, anchor holes are reserved. The J-shaped panel wall is provided with drainage holes at intervals of 3m and expansion joints at intervals of 15m; and wall joints are filled. The wall joints are filled with self-compacting fluid state stable soil or layered backfill with graded sand and gravel;
(5)施工一级墙的锚杆,将锚杆斜向穿过J型板式墙及风化破碎岩石直插入稳定岩石边坡中,J型板式墙和锚杆通过现场砼浇筑形成一个稳定整体;(5) To construct the anchor rod of the first-level wall, the anchor rod is inserted obliquely through the J-shaped plate wall and the weathered and broken rock into the stable rock slope, and the J-shaped plate wall and the anchor rod form a stable whole through on-site concrete pouring;
(6)路面铺设完成。(6) Pavement paving is completed.
优选的,还包括有毛石砼配重和分级墙的施工,当J型板式墙高度大于10m时,分两级或多级实施,在步骤5施工完成的基础上,在底部一级墙外侧位置增加毛石砼配重,然后按照(4)、(5)步骤施工分级墙及锚杆。Preferably, it also includes the construction of rubble concrete counterweight and graded walls. When the height of the J-shaped panel wall is greater than 10m, it is implemented in two or more stages. Add rubble concrete counterweight to the position, and then construct graded walls and anchors according to steps (4) and (5).
本发明具有以下有益效果:The present invention has the following beneficial effects:
1.本发明通过结构优化设计,利用小型施工设备,在不破坏现有边坡稳定性状况前提下,顺利进行路堤加固修复。1. The present invention utilizes small-scale construction equipment through structural optimization design, and successfully carries out embankment reinforcement and repair under the premise of not destroying the stability of the existing slope.
2.经过合理设计的高档墙,解决了山区公路建设中存在场地狭小、靠近河流或建筑物、周边环境不利、大型施工设备无法进驻开展工作等不利状况,仍能够顺利完成加固修复任务。2. The rationally designed high-grade wall solves the unfavorable conditions in the construction of mountainous roads such as narrow site, close to rivers or buildings, unfavorable surrounding environment, and the inability of large-scale construction equipment to carry out work, and can still successfully complete the reinforcement and repair task.
附图说明Description of drawings
图1为本发明实施例1的结构示意图,其中J型板式墙高度小于10米。Figure 1 is a schematic structural view of Embodiment 1 of the present invention, wherein the height of the J-shaped panel wall is less than 10 meters.
图2为本发明实施例2的结构示意图,其中J型板式墙高度大于10米。Fig. 2 is a schematic structural diagram of Embodiment 2 of the present invention, wherein the height of the J-shaped panel wall is greater than 10 meters.
主要部件符号说明:Explanation of main component symbols:
1:J型板式墙,2:锚杆,3:换填基础,4:毛石砼配重,5:墙缝填筑,6:排水孔,7:岩石风化面,8:稳定岩石,9:风化破碎岩石。1: J-shaped slab wall, 2: Anchor rod, 3: Replacement foundation, 4: Rubble concrete counterweight, 5: Wall joint filling, 6: Drain hole, 7: Rock weathered surface, 8: Stabilized rock, 9 : Weathered broken rock.
具体实施方式Detailed ways
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.
实施例1Example 1
本发明公开了一种J型锚杆高挡墙及其施工方法,当J型板式墙高度小于10m的情况下,修复高路堤垮塌的修复结构,具体结构如图1所示,具体施工步骤如下:The invention discloses a J-shaped bolt high retaining wall and a construction method thereof. When the height of the J-shaped plate wall is less than 10m, it is a repair structure for repairing the collapse of a high embankment. The specific structure is shown in Figure 1, and the specific construction steps are as follows :
(1)首先进行坡面清理,将坡面危石清理干净;(1) Clean up the slope first, and clean up the dangerous rocks on the slope;
(2)基槽开挖至岩层顶部,采用毛石砼换填基础3稳固基底;(2) Excavate the foundation trench to the top of the rock formation, and replace the foundation 3 with rubble concrete to stabilize the foundation;
(3)施工J型板式墙1的基础座;(3) Construction of the foundation seat of the J-shaped panel wall 1;
(4)施工J型板式墙1的上部挡墙,随着挡墙逐步加高预留锚孔,J型板式墙1每间隔3m设置排水孔6,每间隔15m设置伸缩缝;并进行墙缝填筑5,墙缝填筑5为自密实流态稳定土或分层回填级配砂石;(4) Construction of the upper retaining wall of the J-shaped panel wall 1. As the retaining wall is gradually increased, anchor holes are reserved. The J-shaped panel wall 1 is provided with drainage holes 6 at intervals of 3m and expansion joints at intervals of 15m; Filling 5, wall joint filling 5 is self-compacting fluid state stable soil or layered backfilling graded sand and gravel;
(5)施工一级墙的锚杆2,将锚杆2斜向穿过J型板式墙1及风化破碎岩石9直插入稳定岩石8边坡中,J型板式墙1和锚杆2通过现场砼浇筑形成一个稳定整体;(5) To construct the anchor 2 of the first-level wall, insert the anchor 2 obliquely through the J-shaped plate wall 1 and the weathered and broken rock 9 into the slope of the stable rock 8, and the J-shaped plate wall 1 and the anchor 2 pass through the site Concrete pouring forms a stable whole;
(6)路面铺设完成。(6) Pavement paving is completed.
实施例2Example 2
本发明公开了一种J型锚杆高挡墙及其施工方法,当J型板式墙高度大于10m的情况下(本实施例以J型板式墙高度为18米为例),修复高路堤垮塌的修复结构,具体结构如图2所示,具体施工步骤如下:The invention discloses a J-shaped anchor high retaining wall and its construction method. When the height of the J-shaped plate wall is greater than 10m (the height of the J-shaped plate wall is 18 meters in this embodiment as an example), the collapse of the high embankment can be repaired. The repair structure, the specific structure is shown in Figure 2, and the specific construction steps are as follows:
(1)首先进行坡面清理,将坡面危石清理干净;(1) Clean up the slope first, and clean up the dangerous rocks on the slope;
(2)基槽开挖至岩层顶部,采用毛石砼换填基础3稳固基底;(2) Excavate the foundation trench to the top of the rock formation, and replace the foundation 3 with rubble concrete to stabilize the foundation;
(3)施工J型板式墙1的基础座;(3) Construction of the foundation seat of the J-shaped panel wall 1;
(4)施工J型板式墙1的上部挡墙,随着挡墙逐步加高预留锚孔,J型板式墙1每间隔3m设置排水孔6,每间隔15m设置伸缩缝;并进行墙缝填筑5,墙缝填筑5为自密实流态稳定土或分层回填级配砂石;(4) Construction of the upper retaining wall of the J-shaped panel wall 1. As the retaining wall is gradually increased, anchor holes are reserved. The J-shaped panel wall 1 is provided with drainage holes 6 at intervals of 3m and expansion joints at intervals of 15m; Filling 5, wall joint filling 5 is self-compacting fluid state stable soil or layered backfilling graded sand and gravel;
(5)施工一级墙的锚杆2,将锚杆2斜向穿过J型板式墙1及风化破碎岩石9直插入稳定岩石8边坡中,J型板式墙1和锚杆2通过现场砼浇筑形成一个稳定整体;(5) To construct the anchor 2 of the first-level wall, insert the anchor 2 obliquely through the J-shaped plate wall 1 and the weathered and broken rock 9 into the slope of the stable rock 8, and the J-shaped plate wall 1 and the anchor 2 pass through the site Concrete pouring forms a stable whole;
(6)在底部一级墙外侧位置增加毛石砼配重4形成平台便于二级墙施工;(6) Add rubble concrete counterweight 4 on the outer side of the bottom primary wall to form a platform to facilitate the construction of the secondary wall;
(7)J型板式墙1高度为18m,分两级(各9m)实施,按照(4)、(5)步骤施工二级墙1及锚杆2;(7) The height of the J-shaped plate wall 1 is 18m, and it is implemented in two stages (9m each), and the secondary wall 1 and the anchor rod 2 are constructed according to (4) and (5) steps;
(8)路面铺设完成。(8) Pavement paving is completed.
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。The above is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any person skilled in the art within the technical scope disclosed in the present invention can easily think of changes or Replacement should be covered within the protection scope of the present invention.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910383704.4A CN109972654A (en) | 2019-05-08 | 2019-05-08 | A J-type anchor high retaining wall and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910383704.4A CN109972654A (en) | 2019-05-08 | 2019-05-08 | A J-type anchor high retaining wall and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109972654A true CN109972654A (en) | 2019-07-05 |
Family
ID=67073167
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910383704.4A Pending CN109972654A (en) | 2019-05-08 | 2019-05-08 | A J-type anchor high retaining wall and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109972654A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110688747A (en) * | 2019-09-19 | 2020-01-14 | 昆明理工大学 | Rock slope anchoring calculation method based on safety and economy multi-objective optimization |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201665875U (en) * | 2009-03-05 | 2010-12-08 | 中铁二院工程集团有限责任公司 | Lightweight Gravity Seismic Concrete Retaining Wall |
CN106567404A (en) * | 2016-11-09 | 2017-04-19 | 中交公局第四工程有限公司 | Expansive soil cutting semi-rigid top retaining wall design and construction method |
CN107354953A (en) * | 2017-07-07 | 2017-11-17 | 安徽省新路建设工程集团有限责任公司 | Concrete rib band and the reinforced Retaining wall structure of intensive aspect and construction method |
CN206902741U (en) * | 2017-07-07 | 2018-01-19 | 安徽省新路建设工程集团有限责任公司 | Concrete rib band and the reinforced Retaining wall structure of intensive aspect |
CN206971236U (en) * | 2017-06-19 | 2018-02-06 | 贵州精正检测有限公司 | A kind of barricade for preventing landslide |
CN108005104A (en) * | 2017-10-27 | 2018-05-08 | 西安科技大学 | A kind of combined type retaining wall structure and its construction method |
CN109056786A (en) * | 2018-08-15 | 2018-12-21 | 中冶南方工程技术有限公司 | Face upward inclined road shoulder wall water drainage behind the wall system and construction method |
-
2019
- 2019-05-08 CN CN201910383704.4A patent/CN109972654A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201665875U (en) * | 2009-03-05 | 2010-12-08 | 中铁二院工程集团有限责任公司 | Lightweight Gravity Seismic Concrete Retaining Wall |
CN106567404A (en) * | 2016-11-09 | 2017-04-19 | 中交公局第四工程有限公司 | Expansive soil cutting semi-rigid top retaining wall design and construction method |
CN206971236U (en) * | 2017-06-19 | 2018-02-06 | 贵州精正检测有限公司 | A kind of barricade for preventing landslide |
CN107354953A (en) * | 2017-07-07 | 2017-11-17 | 安徽省新路建设工程集团有限责任公司 | Concrete rib band and the reinforced Retaining wall structure of intensive aspect and construction method |
CN206902741U (en) * | 2017-07-07 | 2018-01-19 | 安徽省新路建设工程集团有限责任公司 | Concrete rib band and the reinforced Retaining wall structure of intensive aspect |
CN108005104A (en) * | 2017-10-27 | 2018-05-08 | 西安科技大学 | A kind of combined type retaining wall structure and its construction method |
CN109056786A (en) * | 2018-08-15 | 2018-12-21 | 中冶南方工程技术有限公司 | Face upward inclined road shoulder wall water drainage behind the wall system and construction method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110688747A (en) * | 2019-09-19 | 2020-01-14 | 昆明理工大学 | Rock slope anchoring calculation method based on safety and economy multi-objective optimization |
CN110688747B (en) * | 2019-09-19 | 2022-05-06 | 昆明理工大学 | Rock slope anchoring calculation method based on safety and economy multi-objective optimization |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101974894B (en) | Combined dam | |
CN109750571B (en) | Road collapse emergency and permanent retaining integrated structure and construction method | |
CN107542108A (en) | A kind of reverse construction method of building basement structure | |
CN207003499U (en) | A kind of anti-floating lifting device of underground tunnel upper excavation of foundation pit | |
CN104179194A (en) | Integrated pipe trench in soft soil stratum and construction method of integrated pipe trench | |
CN106836244A (en) | Method for protecting steep slope roadbed by combining anti-slide piles and gabion high retaining wall | |
CN107386317A (en) | Foam concrete lightweight barricade and construction method are excavated after a kind of first precompressed of deep ultra-soft soil | |
CN105672450A (en) | Laying method for large-aperture water draining pipeline parallel to upper part of existing metro tunnel structure | |
CN105926391B (en) | A kind of curb method for widening of existing railway roadbed | |
CN103643689B (en) | A kind of pipe type underground water drainage blind ditch and construction technology thereof and application | |
CN111779022A (en) | New structure and construction method of underground comprehensive pipe gallery in soft soil foundation with anti-settlement and tilt | |
CN212294747U (en) | Pipe jacking well structure | |
CN108999142A (en) | The construction method of dome rectangular light-duty caisson and pile foundation combined type deep water breakwater | |
CN115653000A (en) | Gravity pipe gallery in-situ protection structure system in foundation pit range and construction method | |
CN109577322A (en) | A kind of constructing device for inside soil body existing pile foundation pile extension | |
CN109972654A (en) | A J-type anchor high retaining wall and its construction method | |
CN105714771B (en) | Construction method of manual hole digging pile | |
Lambrechts et al. | Soil mixing to stabilize organic clay for I-95 widening, Alexandria, VA | |
CN207004520U (en) | A kind of robust structure of subway protection area shaft excavation | |
CN109356530A (en) | A working platform for a soft soil foundation rotary drilling rig and using method | |
CN113308954B (en) | Construction method of anchor rod foam concrete widening roadbed | |
CN209555946U (en) | A kind of reparation structure that high embankment collapses | |
CN217000057U (en) | Town road crosses street pipe and backfills structure | |
CN219604048U (en) | Existing railway high-filling roadbed widening structure | |
CN111270681A (en) | Construction method and structure of support structure suitable for crossing foundation pit pipeline group |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 550081 No. 7, 25 / F, unit 1, building 5, 6 and 7, Dongyuan Fortune Plaza project, intersection of Guanshan road and Changling Road, guanshanhu District, Guiyang City, Guizhou Province Applicant after: Guizhou Zhihua Construction Engineering (Group) Co.,Ltd. Address before: 550081 No. 3, floor 5, building A7, Chengxin Road, guanshanhu District, Guiyang City, Guizhou Province Applicant before: GUIZHOU ZHIHUA CONSTRUCTION ENGINEERING Co.,Ltd. |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190705 |