CN107217669B CN201710213769.5A CN201710213769A CN107217669B CN 107217669 B CN107217669 B CN 107217669B CN 201710213769 A CN201710213769 A CN 201710213769A CN 107217669 B CN107217669 B CN 107217669B
Authority
CN
China
Prior art keywords
base
foundation
supporting
ground beam
lifting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710213769.5A
Other languages
Chinese (zh)
Other versions
CN107217669A (en
Inventor
刘海祥
陈亮
鲁文妍
龙志勇
唐云清
张民
柯敏勇
洪欣
胥祥龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing R & D Tech Group Co ltd
Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Original Assignee
Nanjing R & D Tech Group Co ltd
Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing R & D Tech Group Co ltd, Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources filed Critical Nanjing R & D Tech Group Co ltd
Priority to CN201710213769.5A priority Critical patent/CN107217669B/en
Publication of CN107217669A publication Critical patent/CN107217669A/en
Application granted granted Critical
Publication of CN107217669B publication Critical patent/CN107217669B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/02Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Foundations (AREA)

Abstract

The invention relates to pile pulling equipment and a quick moving method thereof, and belongs to the technical field of pile removal in projects such as water conservancy projects, highways, railways, municipal administration, bridges and the like. The pile pulling equipment comprises a door-type bracket, a lifting device and a workbench for installing the lifting device, wherein the door-type bracket comprises two supporting legs which are oppositely arranged and a girder group which spans a pile to be pulled, two ends of the girder group respectively fall on one supporting leg, and the workbench is fixed on the girder group; the landing leg is including locating the floor beam on the foundation, riding the base on the floor beam, the stand of fixing on the base and locating on the stand and be used for supporting the bracket of girder group one end, and the base is the tripod type base that has four column feet of supporting on the foundation. The pile pulling device and the quick moving method thereof are suitable for various space heights, occupy less working sites, and are convenient, quick and safe to move.

Description

拔桩设备及其快速移动方法Pile pulling equipment and its rapid movement method

技术领域Technical field

本发明涉及一种拔桩设备及其快速移动方法,属于水利、公路、铁路、市政、桥梁等工程中桩的撤去技术领域。The invention relates to a pile pulling equipment and a rapid moving method thereof, and belongs to the technical field of pile removal in water conservancy, highway, railway, municipal administration, bridge and other projects.

背景技术Background technique

现有地铁隧洞施工中,需要将影响隧洞施工的整桩提至安全高度,即将影响隧洞施工的整桩完全拔出或者部分拔出。In the existing subway tunnel construction, the entire pile that affects the tunnel construction needs to be raised to a safe height, that is, the entire pile that affects the tunnel construction needs to be completely or partially pulled out.

据申请人了解,现有国内外的拔桩设备,拔出大型桩体的设备的体型普遍很大,施工难度明显很大,受限于空间,危险性大;而使用较小的设备又达不到施工的要求,无法拔出大型桩。According to the applicant's understanding, among the existing pile pulling equipment at home and abroad, the equipment for pulling out large piles is generally very large, the construction difficulty is obviously very difficult, the space is limited, and the risk is high; while the use of smaller equipment requires up to Large piles cannot be pulled out without construction requirements.

采用有国内外的拔桩设备进行拔桩时,需要将地面进行硬化作为拔桩设备的工作平台。据申请人了解,在采用反力架进行拔桩时,需要硬化的场地很大,对于场地要求高,但是,实际拔桩时,施工受限于场地空间等,不能达到现有反力架拔桩要求。同时,需要将拔桩设备进行移动时,必须将拔桩设备进行分解拆除再进行拼装。When using domestic and foreign pile pulling equipment to pull out piles, the ground needs to be hardened as a working platform for the pile pulling equipment. According to the applicant's understanding, when using a reaction frame to pull out piles, the site that needs to be hardened is very large and the site requirements are high. However, when actually pulling out piles, the construction is limited by the site space, etc., and the existing reaction frame cannot be pulled out. pile requirements. At the same time, when the pile pulling equipment needs to be moved, the pile pulling equipment must be disassembled and then assembled.

发明内容Contents of the invention

本发明要解决的技术问题是针对现有技术不足,提出一种适用于各种空间高度且场地占用少并方便快速安全移动的拔桩设备及其快速移动方法。The technical problem to be solved by the present invention is to address the shortcomings of the existing technology and propose a pile pulling equipment and a fast moving method that are suitable for various space heights, occupy less space, and are convenient for fast and safe movement.

本发明为解决上述技术问题提出的技术方案之一是:一种拔桩设备,包括门型支架、起吊装置和用于起吊装置安装的工作台,所述门型支架包括相对设置的两个支腿和横跨待拔桩的大梁组,所述大梁组的两端处分别落在一个支腿上,所述工作台固定在大梁组上;所述支腿包括设于地基上的地梁、骑于地梁上的底座、固定在底座上的立柱和设于立柱上并用于支撑大梁组一端的托架,所述底座是具有四个支撑在地基上的柱脚的鼎型底座。One of the technical solutions proposed by the present invention to solve the above technical problems is: a pile pulling equipment, which includes a portal bracket, a lifting device and a workbench for installing the lifting device. The portal bracket includes two opposite supports. The legs and the girder group across the piles to be pulled out, the two ends of the girder group respectively fall on a support leg, the workbench is fixed on the girder group; the support leg includes a ground beam located on the foundation, There is a base that rides on the ground beam, a column that is fixed on the base, and a bracket that is located on the column and used to support one end of the girder group. The base is a tripod-shaped base with four column feet supported on the foundation.

本发明采用上述技术方案的效果是:1)通过设置门型支架,门型支架的支腿包括设于地基上的地梁、骑于地梁上的底座、固定在底座上的立柱和设于立柱上并用于支撑大梁组一端的托架,门型支架的大梁组上固定有用于起吊装置安装的工作台上,各连接处传力简洁,确保两个底座的8根支腿受力均匀,适用于各种空间高度,也可将不同直径桩体快速安全拔出,整个装置场地占用少;2)由于设有地梁,底座落在地梁上,底座上部的设备由底座和地梁进行分担,使压力进一步分散,地面的受力大小不变的情况下,使设备所占有的空间大幅度减小,充分利用了荷载扩散的原理。The present invention adopts the above technical solution and has the following effects: 1) By setting up a portal bracket, the legs of the portal bracket include a ground beam installed on the foundation, a base riding on the ground beam, a column fixed on the base and a The bracket is used to support one end of the girder group on the column. The girder group of the portal bracket is fixed with a workbench for the installation of the lifting device. The force transmission at each connection is simple, ensuring that the eight legs of the two bases are evenly stressed. It is suitable for various space heights, and can also quickly and safely pull out piles of different diameters. The entire device occupies less space; 2) Since there is a ground beam, the base falls on the ground beam, and the equipment on the upper part of the base is carried out by the base and the ground beam. Sharing further disperses the pressure. While the force on the ground remains unchanged, the space occupied by the equipment is greatly reduced, making full use of the principle of load diffusion.

上述技术方案之一的改进是:所述底座包括两根骑于地梁上并相对设置的底座横梁以及四个柱脚,所述四个柱脚两两分别设于地梁两侧且位于地梁同一侧的两个柱脚之间焊接有连接梁,每根底座横梁的两端均穿过一个柱脚并与该柱脚焊接固定,所述柱脚支撑在地基上且柱脚顶部固定有用于与立柱螺栓连接的顶板。An improvement of one of the above technical solutions is that the base includes two base beams that ride on the ground beams and are arranged oppositely, and four column feet. The four column feet are respectively provided on both sides of the ground beam and located on the ground. A connecting beam is welded between two column feet on the same side of the beam. Both ends of each base beam pass through a column foot and are welded and fixed with the column foot. The column foot is supported on the foundation and the top of the column foot is fixed. To the roof bolted to the column.

本发明采用上述技术方案的效果是:1)由于设有地梁和底座,地梁刚度与地基刚度优化匹配,使底座四个柱脚最先将荷载传递至地表,地表产生变形后,增加的荷载逐步分担至地梁,并向地梁的梁端不断传递,同时通过底座的底座横梁同时向地梁的梁两侧传递,充分利用了荷载扩散的原理,整体受力均匀,设备所占有的空间大幅度减小,或者说占地平面一定,竖向反力成倍增加;2)由于底座横梁和柱脚制为一体,底座横梁只是落在地梁,通过栓接连接上部设备的立柱,较远距离移动是只需将两部分分开进行移动。The effect of the present invention adopting the above technical solution is: 1) Since the ground beam and the base are provided, the stiffness of the ground beam is optimally matched with the stiffness of the foundation, so that the four column feet of the base are the first to transmit the load to the ground surface. After the ground surface is deformed, the increased The load is gradually distributed to the ground beam and continuously transmitted to the beam ends of the ground beam. At the same time, it is transmitted to both sides of the ground beam through the base beam of the base. The principle of load diffusion is fully utilized. The overall force is uniform and the equipment occupies The space is greatly reduced, or the floor space is fixed, and the vertical reaction force is doubled; 2) Since the base beam and column feet are integrated, the base beam only falls on the ground beam and is bolted to the column of the upper equipment. To move over longer distances, just move the two parts separately.

上述技术方案之一的进一步改进是:每个柱脚上均螺栓连接固定有一个立柱,每个立柱与托架之间设有缓冲垫。A further improvement of one of the above technical solutions is that a column is bolted to each column foot, and a buffer pad is provided between each column and the bracket.

上述技术方案之一的更进一步改进是:所述托架是由两根托架横梁和连接两根托架横梁的两根托架纵梁组成的井字形托架,每根托架横梁的两端分别落在一个立柱上,每根托架横梁的腹面中部处固定有用于支撑大梁组的支撑板。A further improvement of one of the above technical solutions is that the bracket is a tic-shaped bracket composed of two bracket beams and two bracket longitudinal beams connecting the two bracket beams, and the two bracket beams of each bracket are Each end falls on a column respectively, and a support plate for supporting the girder group is fixed at the middle of the belly of each bracket beam.

上述技术方案之一的完善之一是:所述柱脚的下部处固定有用于抬升门型支架和起吊装置的托台。One improvement of one of the above technical solutions is that a bracket for lifting the portal bracket and the lifting device is fixed at the lower part of the column foot.

上述技术方案之一的完善之二是:所述大梁组是由两上两下并排布置的四片大梁组成,所述工作台是固定在大梁组间的横向联系件。The second improvement of one of the above technical solutions is that the girder group is composed of four girder pieces arranged side by side two up and two down, and the workbench is a transverse connecting member fixed between the girder groups.

上述技术方案之一的完善之三是:所述起吊装置为穿心千斤顶。The third improvement of one of the above technical solutions is that the lifting device is a through-hole jack.

本发明为解决上述技术问题提出的技术方案之二是:一种拔桩设备快速移动方法,用于快速移动上述的拔桩设备,包括以下步骤:The second technical solution proposed by the present invention to solve the above technical problems is: a method for quickly moving pile pulling equipment, which is used to quickly move the above pile pulling equipment, including the following steps:

1)所述起吊装置先卸除载荷,然后将托举千斤顶固定在每个支腿中底座的托台下方处的地基上;1) The lifting device first removes the load, and then fixes the lifting jack on the foundation below the supporting platform of the base of each leg;

2)通过托举千斤顶顶住托台以进行地梁上方处的门型支架和起吊装置整体起升,然后在每个底座下方铺设一条沿拔桩设备预定移动方向延伸的垫板或运行有拖车的轨道,所述垫板是摩擦系数≤0.05的板材,再通过托举千斤顶整体下落地梁上方处的门型支架和起吊装置并将底座支撑在所述垫板上或将底座支撑在所述拖车上;2) Use a lifting jack to hold up the pallet to lift the portal bracket and lifting device above the ground beam as a whole, and then lay a pad extending in the intended movement direction of the pile pulling equipment or run a trailer under each base. track, the backing plate is a plate with friction coefficient ≤ 0.05, and then the portal bracket and lifting device above the floor beam are lowered by the lifting jack and the base is supported on the backing plate or the base is supported on the on a trailer;

3)在地梁或底座上分别固定有绳索,通过牵拉所述绳索分别拉动地梁或底座沿预定移动方向移动到设定位置,在拉动地梁或底座移动时,所述底座始终骑于地梁上方处;3) There are ropes fixed on the ground beam or the base respectively. By pulling the ropes, the ground beam or the base is moved to the set position along the predetermined movement direction. When the ground beam or the base is pulled to move, the base always rides on it. Above the ground beam;

4)接着再一次将托举千斤顶固定在每个支腿中底座的托台下方处的地基上,通过托举千斤顶顶住托台以进行地梁上方处的门型支架和起吊装置的第二次整体起升,然后将垫板或拖车抽出,再通过托举千斤顶整体下落地梁上方处的门型支架和起吊装置并将底座支撑在所述地基上。4) Then once again fix the lifting jack on the foundation below the supporting platform of the base of each leg, and use the lifting jack to hold the supporting platform for the second step of the portal bracket and lifting device above the ground beam. First lift it as a whole, then pull out the pad or trailer, and then use the lifting jack to lower it as a whole to the portal bracket and lifting device above the floor beam and support the base on the foundation.

本发明采用上述技术方案的效果是:1)直接通过牵拉绳索分别拉动地梁或底座沿预定移动方向移动到设定位置,由于在拉动地梁或底座移动时,底座始终骑于地梁上方处,这样十分安全,保证门型支架和起吊装置整体快速安全移动;2)本方法采用特制的底座,将底座落在地梁上,底座上部的设备由底座和地梁进行分担,使压力进一步分散,地面的受力大小不变的情况下,使设备所占有的空间大幅度减小,充分利用了荷载扩散的原理。The effect of the present invention adopting the above technical solution is: 1) The ground beam or the base is directly pulled by the pulling rope to move to the set position along the predetermined movement direction, because when the ground beam or the base is pulled to move, the base always rides on the ground beam. This is very safe and ensures that the portal bracket and the lifting device can move quickly and safely as a whole; 2) This method uses a special base to drop the base on the ground beam, and the equipment on the upper part of the base is shared by the base and the ground beam, so that the pressure is further Dispersed, the space occupied by the equipment is greatly reduced while the force on the ground remains unchanged, making full use of the principle of load diffusion.

上述技术方案之二的改进是:所述起吊装置是穿心千斤顶或卷扬机。An improvement of the second technical solution is: the lifting device is a through jack or a winch.

上述技术方案之二的改进是:所述地基是板式地基、箱式地基、框架式地基、沉入式地基、地表式地基、钢结构地基、钢筋混凝土地基或组合结构地基。An improvement of the second technical solution is: the foundation is a slab foundation, a box foundation, a frame foundation, a sunken foundation, a surface foundation, a steel structure foundation, a reinforced concrete foundation or a composite structure foundation.

附图说明Description of the drawings

下面结合附图对本发明作进一步说明:The present invention will be further described below in conjunction with the accompanying drawings:

图1是本发明实施例拔桩设备的结构示意图一。Figure 1 is a schematic structural diagram of the pile pulling equipment according to the embodiment of the present invention.

图2是本发明实施例拔桩设备的结构示意图二。Figure 2 is a second structural schematic diagram of the pile pulling equipment according to the embodiment of the present invention.

图3是图1中底座和地梁的装配示意图。Figure 3 is a schematic diagram of the assembly of the base and the ground beam in Figure 1.

图4是图3的仰视图。FIG. 4 is a bottom view of FIG. 3 .

图5是本发明实施例的拔桩设备快速移动方法的移动布置图。Figure 5 is a movement layout diagram of the rapid movement method of pile pulling equipment according to the embodiment of the present invention.

图6是图5的左视图。FIG. 6 is a left side view of FIG. 5 .

具体实施方式Detailed ways

实施例Example

本实施例的拔桩设备,如图1和图2所示,包括门型支架1、起吊装置2和用于起吊装置安装的工作台3。起吊装置2采用穿心千斤顶。The pile pulling equipment of this embodiment, as shown in Figures 1 and 2, includes a portal bracket 1, a lifting device 2 and a workbench 3 for installing the lifting device. The lifting device 2 adopts a through-hole jack.

门型支架1包括相对设置的两个支腿和横跨待拔桩的大梁组4,大梁组4的两端处分别落在一个支腿上,工作台3固定在大梁组4上。The portal bracket 1 includes two opposite supporting legs and a girder group 4 spanning the piles to be pulled out. Both ends of the girder group 4 fall on one of the supporting legs respectively, and the workbench 3 is fixed on the girder group 4.

支腿包括设于地基上的地梁5、骑于地梁5上的底座6、固定在底座6上的立柱7和设于立柱上并用于支撑大梁组4一端的托架8,底座6是具有四个支撑在地基上的柱脚6-2的鼎型底座。立柱7是可拼接的立柱,穿心千斤顶是至少一台千斤顶,工作台3是千斤顶平台。The support legs include a ground beam 5 located on the foundation, a base 6 riding on the ground beam 5, a column 7 fixed on the base 6, and a bracket 8 located on the column and used to support one end of the girder group 4. The base 6 is A tripod-shaped base with four legs 6-2 supported on the foundation. The upright column 7 is a splicable upright column, the through-hole jack is at least one jack, and the workbench 3 is a jack platform.

如图3和图4所示,本实施例的底座6包括两根骑于地梁5上并相对设置的底座横梁6-1以及四个柱脚6-2,四个柱脚6-2两两分别设于地梁5两侧且位于地梁同一侧的两个柱脚6-2之间焊接有连接梁6-3,每根底座横梁6-1的两端均穿过一个柱脚6-2并与该柱脚焊接固定,柱脚6-2支撑在地基上且柱脚顶部固定有用于与立柱7螺栓连接的顶板6-4。本实施例的每个柱脚6-2上均螺栓连接固定有一个立柱7,每个立柱7与托架8之间设有缓冲垫。As shown in Figures 3 and 4, the base 6 of this embodiment includes two base beams 6-1 that ride on the ground beam 5 and are arranged oppositely, and four column feet 6-2. The four column feet 6-2 are two A connecting beam 6-3 is welded between two column feet 6-2 respectively located on both sides of the ground beam 5 and located on the same side of the ground beam. Both ends of each base beam 6-1 pass through a column foot 6 -2 and are welded and fixed with the column foot. The column foot 6-2 is supported on the foundation and the top of the column foot is fixed with a top plate 6-4 for bolt connection with the column 7. In this embodiment, each column foot 6 - 2 is bolted and fixed with a column 7 , and a buffer pad is provided between each column 7 and the bracket 8 .

大梁组4是由两上两下并排布置的四片大梁组成,工作台3是固定在大梁组4间的横向联系件。大梁组4可以通过优化,形成承载力较强的叠合梁、鱼腹型梁等形式,降低现场吊装要求,使常用的15吨或25吨吊车满足现工作,更为有利。The beam set 4 is composed of four beams arranged side by side, two up and two down. The workbench 3 is a transverse connecting piece fixed between the beam sets 4. Girder group 4 can be optimized to form composite beams, fish-belly beams and other forms with strong bearing capacity, which can reduce on-site lifting requirements and make the commonly used 15-ton or 25-ton cranes suitable for current work, which is more beneficial.

地梁5是由钢箱梁或工字型钢组成的地梁,柱脚6-2是圆柱形状的柱脚。The ground beam 5 is a ground beam composed of a steel box beam or an I-shaped steel, and the column foot 6-2 is a cylindrical column foot.

柱脚6-2的下部处固定有用于抬升门型支架1和起吊装置2的托台6-5。A pallet 6-5 for lifting the portal bracket 1 and the lifting device 2 is fixed at the lower part of the column foot 6-2.

托架8是由两根托架横梁和连接两根托架横梁的两根托架纵梁组成的井字形托架,每根托架横梁的两端分别落在一个立柱7上,每根托架横梁的腹面中部处固定有用于支撑大梁组4的支撑板。The bracket 8 is a tic-shaped bracket composed of two bracket beams and two bracket longitudinal beams connecting the two bracket beams. The two ends of each bracket beam fall on a column 7 respectively. A support plate for supporting the girder group 4 is fixed at the middle part of the web of the frame cross beam.

如图5和图6所示,本实施例的拔桩设备快速移动方法,用于快速移动上述拔桩设备,包括以下步骤:As shown in Figures 5 and 6, the method for quickly moving pile pulling equipment in this embodiment is used to quickly move the above pile pulling equipment, including the following steps:

1)起吊装置2先卸除载荷,然后将托举千斤顶9固定在每个支腿中底座6的托台6-5下方处的地基上;1) The lifting device 2 first removes the load, and then fixes the lifting jack 9 on the foundation below the bracket 6-5 of the base 6 in each leg;

2)通过托举千斤顶9顶住托台6-5以进行地梁5上方处的门型支架1和起吊装置2整体起升,然后在每个底座6下方铺设一条沿拔桩设备预定移动方向延伸的垫板10或运行有拖车的轨道(图中未示出),垫板10是摩擦系数≤0.05的板材,再通过托举千斤顶9整体下落地梁5上方处的门型支架1和起吊装置2并将底座6支撑在垫板10上或将底座6支撑在拖车上;2) Use the lifting jack 9 to hold up the supporting platform 6-5 to lift the portal bracket 1 and the lifting device 2 above the ground beam 5 as a whole, and then lay a strip under each base 6 along the predetermined movement direction of the pile pulling equipment. The extended pad 10 or the track with a trailer (not shown in the figure), the pad 10 is a plate with a friction coefficient ≤ 0.05, and then the portal bracket 1 above the floor beam 5 is lowered by the lifting jack 9 and lifted Device 2 and support the base 6 on the pad 10 or support the base 6 on the trailer;

3)在地梁5或底座6上分别固定有绳索,通过牵拉绳索分别拉动地梁5或底座6沿预定移动方向移动到设定位置,在拉动地梁5或底座6移动时,底座6始终骑于地梁5上方处;3) A rope is fixed on the ground beam 5 or the base 6 respectively. By pulling the rope, the ground beam 5 or the base 6 is pulled to move to the set position along the predetermined movement direction. When the ground beam 5 or the base 6 is pulled to move, the base 6 Always ride above ground beam 5;

4)接着再一次将托举千斤顶9固定在每个支腿中底座6的托台6-5下方处的地基上,通过托举千斤顶9顶住托台6-5以进行地梁上方处的门型支架1和起吊装置2的第二次整体起升,然后将垫板10或拖车抽出,再通过托举千斤顶9整体下落地梁上方处的门型支架1和起吊装置2并将底座6支撑在地基上。4) Then once again fix the lifting jack 9 on the foundation below the supporting platform 6-5 of the base 6 in each leg, and use the lifting jack 9 to withstand the supporting platform 6-5 to carry out lifting above the ground beam. The portal bracket 1 and the lifting device 2 are lifted as a whole for the second time, and then the pad 10 or the trailer is pulled out, and then the portal bracket 1 and the lifting device 2 above the floor beam are lowered as a whole through the lifting jack 9 and the base 6 is lifted. Supported on foundation.

在本实施例的拔桩设备快速移动方法中:起吊装置2是穿心千斤顶或卷扬机。地基是板式地基、箱式地基、框架式地基、沉入式地基、地表式地基、钢结构地基、钢筋混凝土地基或组合结构地基,等等。In the quick moving method of pile pulling equipment in this embodiment: the lifting device 2 is a through jack or a winch. The foundation is a slab foundation, a box foundation, a frame foundation, a sunken foundation, a surface foundation, a steel structure foundation, a reinforced concrete foundation or a composite structure foundation, etc.

本发明不局限于上述实施例。凡采用等同替换形成的技术方案,均落在本发明要求的保护范围。The present invention is not limited to the above-described embodiment. All technical solutions formed by using equivalent substitutions fall within the protection scope required by the present invention.

Claims (3)

1. The pile pulling equipment comprises a door-shaped bracket, a lifting device and a workbench for mounting the lifting device, wherein the door-shaped bracket comprises two supporting legs which are oppositely arranged and a girder group which spans a pile to be pulled, two ends of the girder group respectively fall on one supporting leg, and the workbench is fixed on the girder group; the support leg comprises a ground beam arranged on a foundation, a base riding on the ground beam, a stand column fixed on the base and a bracket arranged on the stand column and used for supporting one end of the girder group, the base is a tripod type base with four column feet supported on the foundation,
the method is characterized by comprising the following steps of:
1) The lifting device firstly removes load, and then fixes the lifting jack on the foundation below the supporting table of the base in each supporting leg;
2) The lifting jack is used for supporting the supporting table to integrally lift the door-shaped support and the lifting device above the ground beam, then a base plate extending along the preset moving direction of the pile pulling equipment or a track running with a trailer is paved below each base, the base plate is a plate with the friction coefficient less than or equal to 0.05, and then the lifting jack integrally falls down the door-shaped support and the lifting device above the ground beam to support the base on the base plate or the trailer;
3) Ropes are respectively fixed on the ground beam or the base, the ground beam or the base is respectively pulled to move to a set position along a preset moving direction by pulling the ropes, and when the ground beam or the base is pulled to move, the base always rides on the ground beam;
4) Then fixing the lifting jack on the foundation below the supporting platform of the base in each supporting leg again, supporting the supporting platform through the lifting jack to carry out second integral lifting of the door-shaped support and the lifting device above the ground beam, then withdrawing the base plate or the trailer, and integrally falling the door-shaped support and the lifting device above the ground beam through the lifting jack and supporting the base on the foundation.
2. A method of rapidly moving pile pulling apparatus according to claim 1, wherein: the lifting device is a penetrating jack or a winch.
3. A method of rapidly moving pile pulling apparatus according to claim 1, wherein: the foundation is a slab foundation, a box foundation, a frame foundation, a sunk foundation, a ground surface type foundation, a steel structure foundation, a reinforced concrete foundation or a combined structure foundation.
CN201710213769.5A 2017-04-01 2017-04-01 Pile pulling equipment and quick moving method thereof Active CN107217669B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710213769.5A CN107217669B (en) 2017-04-01 2017-04-01 Pile pulling equipment and quick moving method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710213769.5A CN107217669B (en) 2017-04-01 2017-04-01 Pile pulling equipment and quick moving method thereof

Publications (2)

Publication Number Publication Date
CN107217669A CN107217669A (en) 2017-09-29
CN107217669B true CN107217669B (en) 2023-10-27

Family

ID=59927569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710213769.5A Active CN107217669B (en) 2017-04-01 2017-04-01 Pile pulling equipment and quick moving method thereof

Country Status (1)

Country Link
CN (1) CN107217669B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108266144A (en) * 2018-02-08 2018-07-10 浙江绩丰岩土技术股份有限公司 It is a kind of to pull system and its application method for multiaxis drilling rod
CN115030158B (en) * 2022-05-27 2023-07-18 中铁第六勘察设计院集团有限公司 Assembled device for lifting large-diameter cast-in-place pile and green construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101537976A (en) * 2009-03-20 2009-09-23 史胜海 Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof
CN102635061A (en) * 2012-04-18 2012-08-15 中建二局第三建筑工程有限公司 Mountain stream river-crossing inclined zipper trestle and hoisting method thereof
CN105625486A (en) * 2016-02-26 2016-06-01 福建省新能海上风电研发中心有限公司 Sea foundation pile anti-drawing testing device and testing method thereof
CN205772854U (en) * 2016-05-31 2016-12-07 北京市政建设集团有限责任公司 The walking track of a kind of gantry crane lifting steel truss girder sections supports
CN206873449U (en) * 2017-04-01 2018-01-12 南京瑞迪建设科技有限公司 Pile pulling device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101537976A (en) * 2009-03-20 2009-09-23 史胜海 Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof
CN102635061A (en) * 2012-04-18 2012-08-15 中建二局第三建筑工程有限公司 Mountain stream river-crossing inclined zipper trestle and hoisting method thereof
CN105625486A (en) * 2016-02-26 2016-06-01 福建省新能海上风电研发中心有限公司 Sea foundation pile anti-drawing testing device and testing method thereof
CN205772854U (en) * 2016-05-31 2016-12-07 北京市政建设集团有限责任公司 The walking track of a kind of gantry crane lifting steel truss girder sections supports
CN206873449U (en) * 2017-04-01 2018-01-12 南京瑞迪建设科技有限公司 Pile pulling device

Also Published As

Publication number Publication date
CN107217669A (en) 2017-09-29

Similar Documents

Publication Publication Date Title
CN109183618B (en) Bridge girder erection machine for rapid construction of prefabricated bridge
CN105000482B (en) Tower crane with traveling mechanism
CN101899905B (en) Hoisting and sliding device and hoisting and sliding equipment
CN111038940B (en) Rail-mounted traction system for hoisting and transporting
CN104631333B (en) Arch bridge needle beam, stringer and floorings cast-in-place construction travelling bridge and method
CN204690605U (en) The self-propelled triangular truss hanging basket of large span beam bridge
CN112854008A (en) Prefabricated bridge pier and beam integrated bridge girder erection machine and construction method thereof
CN110468743B (en) Movable hanging bracket for transformation of old bridge pier cap and construction method
CN107217669B (en) Pile pulling equipment and quick moving method thereof
CN207812523U (en) Anchor jacked pile constructing device
CN203961317U (en) Slip list Pin and many truss structures moulding bed
CN211498526U (en) Self-lifting type corrugated steel web cast-in-situ box girder hanging basket
CN110878532A (en) Subway box girder translation construction device and method
CN203238950U (en) Concrete beam formwork supported by trusses suspended in air
CN102659027B (en) Variable-span transit method for girder-erecting gantry crane
CN207987749U (en) Ride cable-styled erection crane
CN110453614A (en) Self-lifting corrugated steel web cast-in-place box girder hanging basket
CN204662929U (en) A kind of cross-line walking fence operation device
CN104746432B (en) The feasible bridge guidance tape in plate-beam transports installs car
CN207032062U (en) Tower with suspended cable available for Large-span Steel Box Beam construction
CN111877165B (en) Bailey beam translation device in limited space and construction method thereof
CN201857761U (en) Hoisting and sliding device and hoisting and sliding equipment
CN108086168A (en) Ride cable-styled erection crane
CN100497834C (en) Construction equipment for integral roof-holding highway bridge top structure
CN111705682A (en) A construction method and equipment for demolition and reconstruction of superstructure of widened bridge across electrified railway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant