- CN106884675A CN106884675A CN201710232613.1A CN201710232613A CN106884675A CN 106884675 A CN106884675 A CN 106884675A CN 201710232613 A CN201710232613 A CN 201710232613A CN 106884675 A CN106884675 A CN 106884675A
- Authority
- CN
- China
- Prior art keywords
- slurry
- technique
- filling
- underground goaf
- consolidated fill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28C—PREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28C5/00—Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions
- B28C5/08—Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions using driven mechanical means affecting the mixing
- B28C5/0875—Mixing in separate stages involving different containers for each stage
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Soil Conditioners And Soil-Stabilizing Materials (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Processing Of Solid Wastes (AREA)
Abstract
The present invention proposes the technique that a kind of consolidated fill slurry fills underground goaf, the mine tailing waste residue that factory produces will be first selected to be released from refuse bin bottom discharging valve, thin material is obtained through multiple crushing and screening and be transferred in sandstone finished product bin, then stir and must fill slurry in thin material, sludge slurry, cementing material, water being sent into filling slurry stirring system together in proportion, be finally pumped to underground goaf.This invention simplifies broken barren rock technological process in filling slurry preparation process, grinding flowsheet is not needed, improving filling slurry level using the sludge slurry for selecting factory's ore dressing to produce matches somebody with somebody, and adjusts filling slurry stirring technique, the continuity of filling slurry preparation is realized, filling cost is reduced.
Description
Technical field
The present invention relates to filling in mine slurry technical field, and in particular to a kind of consolidated fill slurry fills underground goaf
Technique.
Background technology
By the use of gravity separation technology produce mine tailing as filling in mine material when, need to select factory produce rejects crush
Etc. handling process, below treatment to certain granularity, then mixed with cementing material be prepared into filling slurry be fills up to it is mined out
Area.And fine grain content is very low in the broken material of waste residue, broken material finish mix slurry poor fluidity, it is often necessary to which addition is a large amount of
Cement could be conveyed using force (forcing) pump.The country is to reduce cement consumption and improve filling slurry mobility, generally uses sieve
Point, the multistage technology flow such as broken, ore grinding, complete to reach above-mentioned purpose by various devices and equipment.Therefore related process needs volume
The outer increase flow such as ore grinding, thereby results in that whole facility floor space is larger, and capital expenditure is high, and operating cost is high, plant maintenance
It is complicated.
It is cementing that the A of Chinese patent CN 104696008 " method of Wasterock Cemented Filling underground stope " disclose a kind of rubble
The method for filling underground stope, effectively improves big and filling slurry poor fluidity the problem of cement consumption, but still suffer from as
Lower problem:
(1) rubble crushing system includes oscillating feeder, jaw crusher, toothed roll crusher, rotary screen, technological process
Complexity, one section of screening system is crushed using two sections, causes to invest excessive, and operating cost is high.
(2) metaling is milled into powder by the qualified metaling of 15mm using Raymond mill after crushing, to increase casting resin
Fine grained in slurry, improves casting resin level and matches somebody with somebody, and increased grinding flowsheet, causes technological process complicated, and operating cost is high.
(3) the bulky grain aggregate containing 15mm in filling slurry, is stirred using agitator, easily stirs insufficient,
Such as need stirring abundant, mixing time need to be increased, cause filling slurry to prepare discontinuous.
Therefore it is badly in need of developing the new filling slurry and filling process of a kind of intensity high, good fluidity, low cost.
The content of the invention
For above-mentioned problem, the present invention proposes the technique that a kind of consolidated fill slurry fills underground goaf,
Broken barren rock technological process in filling slurry preparation process is simplified, it is not necessary to grinding flowsheet, using the ore deposit for selecting factory's ore dressing to produce
Mud improves filling slurry level and matches somebody with somebody, and adjusts filling slurry stirring technique, realizes the continuity of filling slurry preparation, reduces and fills
Fill into this.
In order to realize above-mentioned purpose, the present invention uses following technical scheme:
A kind of consolidated fill slurry fills the technique of underground goaf, and step is as follows:
1) will select factory produce mine tailing waste residue from refuse bin release, and by adhesive tape conveyor transport to sifting vibrating sieve into
Row first paragraph is sieved;
2) thin material under sieve is sent in sandstone finished product bin through adhesive tape conveyor, thick material is through adhesive tape conveyor on sieve
Feeding disintegrating machine, delivering to sifting vibrating sieve after crushing again through adhesive tape conveyor carries out second segment screening;
3) repeat step 2) to material all by sifting vibrating sieve;
4) the thin material in finished product sand material storehouse is delivered to filling slurry stirring system through disk feeder, then by than
Example by sludge slurry, cementing material and appropriate water addition filling slurry stirring system, obtains filling slurry respectively after stirring;
5) filling slurry is sent by pumping to underground goaf, you can.
Preferably, the refuse bin bottom is provided with the ore drawing valve of discharging.
Preferably, step 1), 3) in sifting vibrating sieve be circular vibrating screen.
Preferably, the circular vibrating screen mesh size is 5mm.
Preferably, step 2) described in disintegrating machine be vertical shaft crusher.
Preferably, step 4) in by sludge slurry add filling slurry stirring system be specially will first select factory produce sludge starch
It is sent by pumping in sludge dashpot, is then added in filling slurry stirring system by pumping.
Preferably, sludge slurry first uses the dense treatment of concentrator before sludge dashpot is delivered to.
Preferably, step 4) in by cementing material add filling slurry stirring system it is micro- specifically by cementing bin bottom
Powder scale is quantitatively added in filling slurry stirring system.
Preferably, step 4) in filling slurry stirring system be made up of two sections of continuous mixers.
Preferably, two sections of continuous mixers are horizontal mixer.
Due to using above-mentioned technical scheme, the beneficial effects of the invention are as follows:Prepared this invention simplifies filling slurry
Barren rock technological process is crushed in journey, it is not necessary to grinding flowsheet, improving filling slurry level using the sludge slurry for selecting factory's ore dressing to produce matches somebody with somebody,
Adjustment filling slurry stirring technique, realizes the continuity of filling slurry preparation, reduces filling cost.
(1) to only have ore drawing valve, circular vibrating screen, vertical shaft crusher and each technology room material defeated for rejects crushing system
Send and constituted with adhesive tape conveyor, technological process is simplified, using prescreening system so that disintegrating machine operating efficiency is higher, carries
Equipment functional reliability high, reduces investment, reduces filling cost.
(2) the sludge slurry for selecting factory originally to produce need to drain into tailings reservoir for piling using dry after dense, press filtration, and the present invention will select factory
The sludge slurry of generation saves Liao Xuan factory and office reason sludge slurry pressure by being added directly to filling slurry preparation system after dense, on the one hand
Filter and tailings reservoir for piling cost, it is real to realize that the sludge for selecting factory to produce slurry, mine tailing waste residue are recycled, eliminate sludge slurry and
The influence that mine tailing waste residue is caused to environment;On the other hand improve filling slurry level using sludge slurry to match somebody with somebody, that realizes filling slurry can
Transporting, is improved filling slurry level using primary grinding generation fine fraction powder and matched somebody with somebody relative to prior art, has saved ore grinding
Cost, simplifies technological process, reduces filling cost.
(3) filling slurry prepares stirring system using two sections of Horizontal stirrings, is stirred using agitator relative to prior art,
Realize stirring work continuity so that filling slurry stirring more fully, reduces the possibility that material conveys plugging, improves
Filling slurry can transporting.
Brief description of the drawings
Fig. 1 is present invention process schematic flow sheet;
In figure:1- cementing material charging gears, 2- concentrators, 3- buffering tank diameters, 4- Pulp pumps, mono- section of mixer of 5-,
Bis- sections of mixers of 6-, 7- rubber conveyers, 8- milltailings refuse bins, 9- ore drawing valves, 10- rubber conveyers, 11- circles shake
Sieve, 12- vertical shaft crushers, 13- rubber conveyers, 14- rubber conveyers, 15- circular vibrating screens, 16- rubber conveyers, 17- glue
Band conveyer, 18- finished product bins, 19- linear vibrating screens.
Specific embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention,
Technical scheme in the embodiment of the present invention is clearly and completely described.Based on embodiments of the invention, the common skill in this area
The every other embodiment that art personnel are obtained under the premise of creative work is not made, belongs to the model of present invention protection
Enclose.
The invention discloses the technique that a kind of consolidated fill slurry fills underground goaf, step is as follows:
1) by draw valve goalkeeper select factory produce mine tailing waste residue from refuse bin release, and by adhesive tape conveyor transport to
Sifting vibrating sieve carries out first paragraph screening;
2) thin material under sieve is sent in sandstone finished product bin through adhesive tape conveyor, thick material is through adhesive tape conveyor on sieve
Feeding vertical shaft crusher, delivering to sifting vibrating sieve after crushing again through adhesive tape conveyor carries out second segment screening;
3) repeat step 2) all sieved by sifting vibrating to material, i.e., through repeatedly crushing and screening repeatedly;
4) the thin material in finished product sand material storehouse is delivered to filling slurry stirring system through disk feeder, then by than
Example by sludge slurry, cementing material and appropriate water addition filling slurry stirring system, obtains filling slurry respectively after stirring;
5) filling slurry is sent by pumping to underground goaf, you can.
As illustrated, by ore drawing valve, the mine tailing waste residue feeding adhesive tape conveyor that factory produces will be selected, through adhesive tape conveyor
Into sifting vibrating sieve, oversize treats that lower step is crushed into vertical shaft crusher, and the lower 5mm materials of sieve are through adhesive tape conveyor shakeout
Stone finished product bin.
Product after crusher in crushing goes check screening vibratory sieve, oversize to be returned through adhesive tape conveyor through adhesive tape conveyor
Disintegrating machine is returned to crush again.The lower 5mm products of sieve then remove sandstone finished product bin through adhesive tape conveyor.Repeat to mine tailing waste residue to have crushed
Entirely.
Qualified below 5mm fine sands in finished product sand material storehouse feed adhesive tape conveyor and send through the disk feeder of bin bottom
To filling slurry stirring system.Filling slurry stirring system is made up of two sections of horizontal continuous mixers;The sludge for selecting factory to produce is starched
It is pumped to again in sludge dashpot after first passing through the dense treatment of concentrator, system is then stirred added to filling slurry by pumping again
In system;Cementing material is quantitatively added in filling slurry stirring system by cementing bin bottom micro mist scale, according to cementing material
Addition, sludge slurry addition, the mine tailing waste residue addition of broken rear 5mm add a certain amount of water and pass through two sections of stirring system
After continuous mixer stirring mixing, it is made qualified filling slurry and is sent by pumping to underground goaf.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although with reference to the foregoing embodiments
The present invention has been described in detail, it will be understood by those within the art that:It still can be to foregoing each implementation
Technical scheme described in example is modified, or carries out equivalent to which part technical characteristic;And these modification or
Replace, do not make the spirit and scope of the essence disengaging various embodiments of the present invention technical scheme of appropriate technical solution.
Claims (10)
1. the technique that a kind of consolidated fill slurry fills underground goaf, it is characterised in that step is as follows:
1) the mine tailing waste residue that factory produces will be selected to be released from refuse bin, and is transported to sifting vibrating to sieve by adhesive tape conveyor and carried out the
One section of screening;
2) thin material under sieve is sent in sandstone finished product bin through adhesive tape conveyor, thick material is sent into through adhesive tape conveyor on sieve
Disintegrating machine, delivering to sifting vibrating sieve after crushing again through adhesive tape conveyor carries out second segment screening;
3) repeat step 2) to material all by sifting vibrating sieve;
4) the thin material in finished product sand material storehouse is delivered to filling slurry stirring system through disk feeder, is then divided in proportion
Not by sludge slurry, cementing material and appropriate water addition filling slurry stirring system, filling slurry is obtained after stirring;
5) filling slurry is sent by pumping to underground goaf, you can.
2. the technique that consolidated fill slurry according to claim 1 fills underground goaf, it is characterised in that:The waste residue
Orlop portion is provided with the ore drawing valve of discharging.
3. the technique that consolidated fill slurry according to claim 1 fills underground goaf, it is characterised in that:Step 1),
3) sifting vibrating sieve is circular vibrating screen in.
4. the consolidated fill slurry according to claim 1 or claim 3 fills the technique of underground goaf, and its feature exists
In:The circular vibrating screen mesh size is 5mm.
5. the technique that consolidated fill slurry according to claim 1 fills underground goaf, it is characterised in that:Step 2) in
The disintegrating machine is vertical shaft crusher.
6. the technique that consolidated fill slurry according to claim 1 fills underground goaf, it is characterised in that:Step 4) in
Adding filling slurry stirring system to be specially in sludge slurry will first select the sludge slurry of factory's generation to be sent by pumping in sludge dashpot,
Then it is added in filling slurry stirring system by pumping.
7. the technique that consolidated fill slurry according to claim 6 fills underground goaf, it is characterised in that:Sludge slurry exists
The dense treatment of concentrator is first used before delivering to sludge dashpot.
8. the technique that consolidated fill slurry according to claim 1 fills underground goaf, it is characterised in that:Step 4) in
Filling slurry stirring system is added quantitatively to be added to filling slurry specifically by cementing bin bottom micro mist scale cementing material
In stirring system.
9. the technique that consolidated fill slurry according to claim 1 fills underground goaf, it is characterised in that:Step 4) in
Filling slurry stirring system is made up of two sections of continuous mixers.
10. the technique that consolidated fill slurry according to claim 9 fills underground goaf, it is characterised in that:Described two
Section continuous mixer is horizontal mixer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710232613.1A CN106884675A (en) | 2017-04-11 | 2017-04-11 | The technique that a kind of consolidated fill slurry fills underground goaf |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710232613.1A CN106884675A (en) | 2017-04-11 | 2017-04-11 | The technique that a kind of consolidated fill slurry fills underground goaf |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106884675A true CN106884675A (en) | 2017-06-23 |
Family
ID=59183899
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710232613.1A Pending CN106884675A (en) | 2017-04-11 | 2017-04-11 | The technique that a kind of consolidated fill slurry fills underground goaf |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106884675A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107246279A (en) * | 2017-07-11 | 2017-10-13 | 太原理工大学 | Underground selecting and purchasing sieve, which is mixed, fills the cementing construction filling system of integrated spoil and method |
CN107379246A (en) * | 2017-07-06 | 2017-11-24 | 中建路桥集团有限公司 | A kind of complex vibration mixer that can carry out being classified processing to raw material |
CN107476821A (en) * | 2017-09-26 | 2017-12-15 | 北京科技大学 | A kind of ultra-fine crude tailings Paste-filling System and method |
CN108252734A (en) * | 2017-12-18 | 2018-07-06 | 金川集团股份有限公司 | A kind of placement method of Desending slicing Drift stoping underground goaf |
CN110821558A (en) * | 2019-11-16 | 2020-02-21 | 中国水利水电第九工程局有限公司 | Preparation method of filling slurry in mine goaf |
CN111042817A (en) * | 2019-12-06 | 2020-04-21 | 长沙矿山研究院有限责任公司 | Partition cemented prop wall-cutting filling mining method |
CN111206956A (en) * | 2020-01-10 | 2020-05-29 | 中国矿业大学 | A method for filling and strengthening of leftover coal pillars in goaf by room-type coal mining method |
CN114293990A (en) * | 2022-01-04 | 2022-04-08 | 长沙有色冶金设计研究院有限公司 | Method for filling open pit |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1483593A (en) * | 1974-08-16 | 1977-08-24 | Cementation Mining Ltd | Collection of aggregate |
GB1484568A (en) * | 1974-08-12 | 1977-09-01 | Cementation Mining Ltd | Shuttering device |
CN1782327A (en) * | 2004-12-03 | 2006-06-07 | 北京中矿机电工程技术研究所 | A method for coal mine gangue pipeline transportation and roadway filling and grouting |
CN101482005A (en) * | 2009-02-02 | 2009-07-15 | 河南理工大学 | Down-hole gross coal dirt-discharging and mine water treating combined process |
CN102814862A (en) * | 2012-08-25 | 2012-12-12 | 葛洲坝集团第五工程有限公司 | Processing system of concrete combined aggregate and construction method |
CN102865101A (en) * | 2012-09-20 | 2013-01-09 | 河北煤炭科学研究院 | Filling method and system of coal mine goaf |
CN202983829U (en) * | 2013-01-05 | 2013-06-12 | 山东汇发矿业科技有限公司 | Barren rock cemented filling system |
CN103899353A (en) * | 2014-04-22 | 2014-07-02 | 贵州晨辉达矿业工程设计有限公司 | Device and method for filling gobs with mine washing tailings |
CN104929683A (en) * | 2015-06-16 | 2015-09-23 | 北京科技大学 | Total-tailings paste filling and stockpiling combined treatment method based on deep-cone thickener |
-
2017
- 2017-04-11 CN CN201710232613.1A patent/CN106884675A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1484568A (en) * | 1974-08-12 | 1977-09-01 | Cementation Mining Ltd | Shuttering device |
GB1483593A (en) * | 1974-08-16 | 1977-08-24 | Cementation Mining Ltd | Collection of aggregate |
CN1782327A (en) * | 2004-12-03 | 2006-06-07 | 北京中矿机电工程技术研究所 | A method for coal mine gangue pipeline transportation and roadway filling and grouting |
CN101482005A (en) * | 2009-02-02 | 2009-07-15 | 河南理工大学 | Down-hole gross coal dirt-discharging and mine water treating combined process |
CN102814862A (en) * | 2012-08-25 | 2012-12-12 | 葛洲坝集团第五工程有限公司 | Processing system of concrete combined aggregate and construction method |
CN102865101A (en) * | 2012-09-20 | 2013-01-09 | 河北煤炭科学研究院 | Filling method and system of coal mine goaf |
CN202983829U (en) * | 2013-01-05 | 2013-06-12 | 山东汇发矿业科技有限公司 | Barren rock cemented filling system |
CN103899353A (en) * | 2014-04-22 | 2014-07-02 | 贵州晨辉达矿业工程设计有限公司 | Device and method for filling gobs with mine washing tailings |
CN104929683A (en) * | 2015-06-16 | 2015-09-23 | 北京科技大学 | Total-tailings paste filling and stockpiling combined treatment method based on deep-cone thickener |
Non-Patent Citations (1)
Title |
---|
国土资源部矿产资源储量司中国国土资源经济研究院: "《中国矿产资源全面节约和高效利用先进技术实践》", 31 March 2017 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107379246A (en) * | 2017-07-06 | 2017-11-24 | 中建路桥集团有限公司 | A kind of complex vibration mixer that can carry out being classified processing to raw material |
CN107379246B (en) * | 2017-07-06 | 2018-07-17 | 中建路桥集团有限公司 | A kind of complex vibration blender that classification processing can be carried out to raw material |
CN107246279A (en) * | 2017-07-11 | 2017-10-13 | 太原理工大学 | Underground selecting and purchasing sieve, which is mixed, fills the cementing construction filling system of integrated spoil and method |
CN107246279B (en) * | 2017-07-11 | 2019-05-28 | 太原理工大学 | Underground, which picks up sieve and mixes, fills the cementing construction filling system of integrated spoil and method |
CN107476821A (en) * | 2017-09-26 | 2017-12-15 | 北京科技大学 | A kind of ultra-fine crude tailings Paste-filling System and method |
CN107476821B (en) * | 2017-09-26 | 2019-05-03 | 北京科技大学 | An ultra-fine full tailings paste filling system |
CN108252734A (en) * | 2017-12-18 | 2018-07-06 | 金川集团股份有限公司 | A kind of placement method of Desending slicing Drift stoping underground goaf |
CN110821558A (en) * | 2019-11-16 | 2020-02-21 | 中国水利水电第九工程局有限公司 | Preparation method of filling slurry in mine goaf |
CN111042817A (en) * | 2019-12-06 | 2020-04-21 | 长沙矿山研究院有限责任公司 | Partition cemented prop wall-cutting filling mining method |
CN111206956A (en) * | 2020-01-10 | 2020-05-29 | 中国矿业大学 | A method for filling and strengthening of leftover coal pillars in goaf by room-type coal mining method |
CN114293990A (en) * | 2022-01-04 | 2022-04-08 | 长沙有色冶金设计研究院有限公司 | Method for filling open pit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106884675A (en) | The technique that a kind of consolidated fill slurry fills underground goaf | |
CN107246279B (en) | Underground, which picks up sieve and mixes, fills the cementing construction filling system of integrated spoil and method | |
CN101987311B (en) | Joint grinding process of FPP mill | |
CN107511241A (en) | A kind of Machine-made Sand production system | |
CN103133033A (en) | Mine phosphogypsum cemented fill slurrying process | |
CN103590851A (en) | Underground waste-rock concrete preparation, pumping and filling system and method | |
CN102128051A (en) | Method for filling gob area with attal in coal mine underhole | |
CN104696008A (en) | Method for filling underground stope with gravels in cemented filling manner | |
CN108816483A (en) | A kind of Machine-made Sand production system | |
CN104832211A (en) | Coal mine gob area filling system | |
CN106499435A (en) | A kind of placement method of underground goaf and filling system | |
CN113649398A (en) | A harmless disposal system for mine tailings | |
CN111841846A (en) | Efficient water-saving type coal resource upgrading process for underground separation and pre-discharge of gangue | |
CN205659763U (en) | Underground mine grit preparation system | |
CN115445741A (en) | A method for producing machine-made sand with high yield from rock waste | |
CN216423035U (en) | TBM back-stoping movable sand mixing and lining complete device | |
CN215611805U (en) | Production facility that mining barren rock preparation aggregate was with having high-efficient dust removal | |
CN105964378A (en) | Mine downhole gravel preparation system and preparation process thereof | |
CN203614129U (en) | Underground waste rock concrete preparation, pumping and filling system | |
CN113638770A (en) | Goaf filling equipment and method and goaf filling structure | |
CN102942321A (en) | Ore muck separation system | |
CN216573552U (en) | Comprehensive treatment system for gold tailings | |
CN213557599U (en) | Asphalt concrete production is with smashing screening plant | |
CN203764371U (en) | Crushing and transport system for deep mined ore | |
CN112643891A (en) | System and pulping method for pulping and filling dry mine tailings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 222004 No. 51 Chaoyang West Road, Haizhou District, Lianyungang City, Jiangsu Province Applicant after: Central Blue Lian Hai Institute of design and Research Co., Ltd. Address before: 222004 No. 51 Chaoyang West Road, Haizhou District, Lianyungang City, Jiangsu Province Applicant before: Lianyungang Design and Research Institute (Lanai Engineering Co.) |
|
CB02 | Change of applicant information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170623 |
|
RJ01 | Rejection of invention patent application after publication |