CN106284317B - 一种建筑桩基施工方法 - Google Patents
一种建筑桩基施工方法 Download PDFInfo
- Publication number
- CN106284317B CN106284317B CN201610796630.3A CN201610796630A CN106284317B CN 106284317 B CN106284317 B CN 106284317B CN 201610796630 A CN201610796630 A CN 201610796630A CN 106284317 B CN106284317 B CN 106284317B
- Authority
- CN
- China
- Prior art keywords
- hole
- drilling
- pile foundation
- construction method
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 30
- 238000005553 drilling Methods 0.000 claims abstract description 50
- 239000004567 concrete Substances 0.000 claims abstract description 20
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 7
- 239000010959 steel Substances 0.000 claims abstract description 7
- 238000009434 installation Methods 0.000 claims abstract description 5
- 230000002787 reinforcement Effects 0.000 claims abstract description 4
- 230000010410 reperfusion Effects 0.000 claims abstract description 4
- 238000000034 method Methods 0.000 claims description 12
- 238000000465 moulding Methods 0.000 claims description 12
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 6
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 230000010412 perfusion Effects 0.000 claims description 3
- 238000009411 base construction Methods 0.000 claims 1
- 238000007711 solidification Methods 0.000 claims 1
- 230000008023 solidification Effects 0.000 claims 1
- 239000002689 soil Substances 0.000 description 5
- 238000010586 diagram Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 239000004927 clay Substances 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 2
- 230000015271 coagulation Effects 0.000 description 2
- 238000005345 coagulation Methods 0.000 description 2
- 239000007788 liquid Substances 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 241001074085 Scophthalmus aquosus Species 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000008094 contradictory effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 239000012535 impurity Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 238000004537 pulping Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/44—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0007—Production methods using a mold
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610796630.3A CN106284317B (zh) | 2016-08-31 | 2016-08-31 | 一种建筑桩基施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610796630.3A CN106284317B (zh) | 2016-08-31 | 2016-08-31 | 一种建筑桩基施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106284317A CN106284317A (zh) | 2017-01-04 |
CN106284317B true CN106284317B (zh) | 2018-07-03 |
Family
ID=57709446
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610796630.3A Active CN106284317B (zh) | 2016-08-31 | 2016-08-31 | 一种建筑桩基施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106284317B (zh) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108360972A (zh) * | 2018-01-23 | 2018-08-03 | 四川公路桥梁建设集团有限公司 | 一种旋挖钻机与冲击钻机组合进行钻孔灌注桩施工方法 |
CN108978698A (zh) * | 2018-07-18 | 2018-12-11 | 中建七局第建筑有限公司 | 一种建筑桩基施工方法 |
CN110206053A (zh) * | 2019-05-21 | 2019-09-06 | 筑邦建设集团股份有限公司 | 建筑桩基的施工方法 |
CN113006706B (zh) * | 2020-12-16 | 2023-04-07 | 宁波市政工程建设集团股份有限公司 | 钢-混旋挖钻机作业平台及其施工方法 |
CN114045854A (zh) * | 2021-08-03 | 2022-02-15 | 中建三局集团华南有限公司 | 一种复杂地质条件下桥梁桩基复合施工方法 |
CN114197455A (zh) * | 2021-12-29 | 2022-03-18 | 山西四建集团有限公司 | 一种建筑桩基施工方法 |
CN114875899B (zh) * | 2022-06-11 | 2024-05-31 | 一山(北京)岩土工程有限公司 | 坚硬地层成孔成桩施工工艺 |
CN116025282A (zh) * | 2022-12-17 | 2023-04-28 | 中交建筑集团有限公司 | 多孤石地层超大直径灌注桩复合成孔施工方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202090339U (zh) * | 2011-04-07 | 2011-12-28 | 河南省电力公司郑州供电公司 | 变电站基建扩底桩 |
CN103334428A (zh) * | 2013-06-24 | 2013-10-02 | 河海大学 | 一种圆盘式混凝土灌注桩及其施工工艺 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4817156B2 (ja) * | 1999-08-31 | 2011-11-16 | 三谷セキサン株式会社 | 既製杭 |
CN100558990C (zh) * | 2005-09-21 | 2009-11-11 | 曹兴明 | 钻孔注浆搅拌扩底压灌混凝土方法及装置 |
CN104563148B (zh) * | 2014-12-29 | 2016-02-03 | 重庆工商职业学院 | 建筑桩基施工方法 |
CN104988907A (zh) * | 2015-08-02 | 2015-10-21 | 王继忠 | 一种混凝土桩的施工方法 |
CN105064336A (zh) * | 2015-08-07 | 2015-11-18 | 中国铁建大桥工程局集团有限公司 | 一种三段式扩底桩的成孔施工方法 |
-
2016
- 2016-08-31 CN CN201610796630.3A patent/CN106284317B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202090339U (zh) * | 2011-04-07 | 2011-12-28 | 河南省电力公司郑州供电公司 | 变电站基建扩底桩 |
CN103334428A (zh) * | 2013-06-24 | 2013-10-02 | 河海大学 | 一种圆盘式混凝土灌注桩及其施工工艺 |
Also Published As
Publication number | Publication date |
---|---|
CN106284317A (zh) | 2017-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106284317B (zh) | 一种建筑桩基施工方法 | |
US11214938B2 (en) | Construction method for pouring concrete in karst cave | |
CN103835284B (zh) | 一种岩溶地区钻孔灌注桩结构及施工方法 | |
CN109440762B (zh) | 一种排水泵站用灌注桩的施工方法 | |
CN103184734B (zh) | 一种植入注浆组合桩的施工方法 | |
WO2018210019A1 (zh) | 潜孔冲击旋喷复合桩成桩方法 | |
CN201280720Y (zh) | 小直径自平衡根键灌注桩根键顶推装置 | |
CN109594564A (zh) | 一种地铁深基坑明挖防坍塌施工方法 | |
CN203741820U (zh) | 一种岩溶地区钻孔灌注桩结构 | |
CN203403404U (zh) | 高效灌注桩设备 | |
CN105714834A (zh) | 一种硬质地层预成孔后注浆h型钢桩的施工工艺 | |
CN203213101U (zh) | 一种植入注浆组合桩 | |
CN102619224A (zh) | 变截面钻孔灌注桩(锚杆)的施工方法及钻具 | |
CN109183790A (zh) | 一种螺纹桩及其施工工具和施工方法 | |
CN111364449A (zh) | 一种针对预制管桩贯穿溶洞的施工方法及结构 | |
CN108049401A (zh) | 一种螺纹夯扩桩及其施工方法 | |
CN212052717U (zh) | 一种针对预制管桩贯穿溶洞的结构 | |
CN111042121B (zh) | 钻孔回填端承桩基础的施工方法 | |
CN105002891B (zh) | 一种钻孔灌注桩免桩间土开挖施工方法 | |
CN110206053A (zh) | 建筑桩基的施工方法 | |
CN108316288A (zh) | 半护筒压灌桩施工设备及施工方法 | |
CN103603341A (zh) | 废渣填充超高强桩基成形方法 | |
CN101338560A (zh) | 钢筋混凝土桩的施工方法 | |
CN106120714A (zh) | 一种提高空心桩承载力的装置及其使用方法 | |
RU2492294C1 (ru) | Трубобетонная свая с усиленным основанием и способ ее сооружения |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Yufeng Inventor after: Zhang Haixiang Inventor after: Wang Chenbin Inventor after: Huang Lingfang Inventor after: Yao Meifang Inventor after: Zhang Linxiang Inventor before: Zhang Haixiang Inventor before: Wang Chenbin Inventor before: Huang Lingfang Inventor before: Yao Meifang Inventor before: Zhang Linxiang |
|
GR01 | Patent grant | ||
GR01 | Patent grant |