CN104790651B - 建筑外架钢管对接方法 - Google Patents

建筑外架钢管对接方法 Download PDF

Info

Publication number
CN104790651B
CN104790651B CN201510051704.6A CN201510051704A CN104790651B CN 104790651 B CN104790651 B CN 104790651B CN 201510051704 A CN201510051704 A CN 201510051704A CN 104790651 B CN104790651 B CN 104790651B
Authority
CN
China
Prior art keywords
steel pipe
sleeve
butt joint
worm
erect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510051704.6A
Other languages
English (en)
Other versions
CN104790651A (zh
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Chuangu Heavy Industry Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510051704.6A priority Critical patent/CN104790651B/zh
Publication of CN104790651A publication Critical patent/CN104790651A/zh
Application granted granted Critical
Publication of CN104790651B publication Critical patent/CN104790651B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种建筑外架钢管对接方法,包括辅助对接结构;所述辅助对接机构包括上套筒、下套筒、支撑轴、稳定杆和涡轮蜗杆减速机构;对接钢管过程如下:第一步,将下套筒的开合套筒固定于竖立的第一根钢管上,安装好稳定杆;第二根钢管平着接近,将其固定在上套筒上;第二步,由扳手缓缓拧动蜗杆端部D或F处,通过涡轮蜗杆减速机构驱动上套筒竖立,待竖立的第一根钢管慢慢竖立起来;将钢管联接扣件放入竖立的第二根钢管头部;第三步,拧动H处,松开稳定杆;第四步,缓缓拧动G处螺钉,让支撑轴、待竖立的第一根钢管慢慢降下,对上钢管联接扣件;第五步,拧紧钢管联接扣件,卸下该对接机构,既完成钢管的对接。本发明具有较好的社会和经济效益。

Description

建筑外架钢管对接方法
技术领域
本申请是申请号为201210473604.9,申请日为2012年11月20日,发明创造名称为“建筑外架钢管辅助对接机构”的发明专利申请的分案申请。
背景技术
在高层建筑建设中,搭接钢管外架是必不可少的,也是十分重要的。但是在其架设过程全是由人工来完成,尤其是在竖直钢管上对接一条竖直钢管时,难度十分大。往往得需要力气大、技术熟练的工人才能胜任这项任务。并且危险性非常高,一有不慎,就会造成严重的后果。
目前,还没有能够用于搭接外架钢管,减轻工人劳动和提高安全性的装置。
发明内容
本发明的目的,就是针对现有建筑实践中存在的问题,而提供了一种用于架设竖直的钢管的技术方案,该方案不但具有机构结构简单,而且它操作方便。
本发明解决其技术问题所采取的技术方案是:一种建筑外架钢管对接方法,包括辅助对接结构;所述辅助对接机构由以下几部分构成,上套筒,上套筒是由一侧铰链联接另一侧通过螺栓联接的两个半圆弧组成的,在每一半圆弧上分别固定有一个转轴;下套筒,下套筒截面为8字形双套筒,包括固定套筒和开合套筒,其中开合套筒是由一侧铰链联接另一侧螺栓联接的两个半圆弧组成的,所述固定套筒上设有一个紧固螺钉;一支撑轴,所述支撑轴下部插在下套筒的固定套筒中,并在与所述紧固螺钉配合的支撑轴上设有自上而下的渐深的楔形槽;一稳定杆,稳定杆上端与上套筒一侧的转轴活结,稳定杆下端与下套筒固定连接;一蜗轮蜗杆减速机构,所述蜗轮蜗杆减速机构固定在支撑轴的顶部,蜗轮轴与上套筒的另一转轴同轴连接,蜗杆轴为手动操作部;对接钢管过程如下:第一步,一人站在需要竖立钢管位置处,将下套筒的开合套筒固定于竖立的第二根钢管上,安装好稳定杆;另一人从楼面将待竖立的第一根钢管平着接近,站在需要竖立钢管位置处的人将其固定在上套筒上;第二步,由扳手缓缓拧动蜗杆端部,通过蜗轮蜗杆减速机构驱动上套筒竖立,待竖立的第一根钢管竖立起来;将钢管联接扣件放入竖立的第二根钢管头部;第三步,拧动位于稳定杆下端的螺母,松开稳定杆;第四步,拧动紧固螺钉,让支撑轴、待竖立的第一根钢管降下,对上钢管联接扣件;第五步,拧紧钢管联接扣件,卸下辅助对接机构,即完成钢管的对接。
本发明的有益效果是:针对工地上没有这种机械产品,本发明是一种简单的辅助工件,可以帮助建筑工人减轻体力劳动,具有很高的社会和经济效益。
附图说明
图1为本发明的主视图;
图2为本发明的左视图;
图3为本发明的右视图;
图4为蜗轮蜗杆机构;
图5为转轴和联接头头部结构示意图之侧视图;
图6为转轴和联接头头部结构示意图之俯视图;
图7为图1中的EE剖视图;
图8为图1中的CC剖视图;
图9A-9E为本方案辅助对接钢管过程示意图;
图中:1上套筒,2转轴,21联接头,3下套筒,31固定套筒,32开合套筒,33紧固螺钉,4支撑轴,41楔形槽,5稳定杆,6蜗轮蜗杆减速机构,61蜗轮轴,62蜗杆轴,71第一根钢管,72第二根钢管,73钢管联接扣件。
具体实施方式
如图1~图8所示,
为能清楚说明本方案的技术特点,下面通过一个具体实施方式,并结合其附图,对本方案进行阐述。
该种建筑外架钢管辅助对接机构,由以下几部分构成,上套筒1,上套筒1是由一侧铰链联接另一侧通过螺栓联接的两个半圆弧组成的,螺栓孔为阶梯孔,这样包覆需要连接的外架杆件。在每一半圆弧上分别固定有一个转轴2,该转轴2头部成十字形弧形体,形成联接头21,如图5、图6所示,联接头竖直方向为直线,直线两头部有两螺栓孔,水平方向成半圆弧,其半径等于上套筒外径,联接头两头部有两个螺栓孔,转轴通过四个螺栓固定于所述的上套筒1上。
下套筒3,下套筒3截面为8字形双套筒,包括固定套筒31和开合套筒32,其中开合套筒是由一侧铰链联接另一侧螺栓联接的两个半圆弧组成的,螺栓孔为阶梯孔,这样包覆需要连接的外架杆件。固定套筒上设有一个紧固螺钉33,用于固定支撑轴4。
支撑轴4,支撑轴4下部插在下套筒的固定套筒31中,并在与所述紧固螺钉配合的支撑轴上设有自上而下的渐深的楔形槽41,支撑轴上端成箱体结构用于安装蜗轮蜗杆减速机构6。
稳定杆5,稳定杆上端有圆形孔,套在转轴上,由螺母进行轴向固定,可转动,实现与上套筒1的连接;稳定杆下端开口,通过螺母固定在下套筒3上。这样既可保证上套筒在竖直面内的平稳转动。
蜗轮蜗杆减速机构6,蜗轮蜗杆减速机构固定在支撑轴4的顶部,蜗轮轴61与上套筒的另一转轴同轴连接,蜗杆轴62为手动操作部,操作部为一六角螺母形状,可以使用扳手进行操作。
如图9A-9E所示,本方案辅助对接钢管过程如下:
第一步,一人站在需要竖立钢管位置处,将下套筒3的开合套筒固定于竖立的第一根钢管71上,安装好稳定杆5。另一人从楼面将待竖立的第二根钢管72平着接近,站在需要竖立钢管位置处的人将其固定在上套筒上,如图9A所示。
第二步,由扳手缓缓拧动蜗杆端部D或F处,通过蜗轮蜗杆减速机构驱动上套筒竖立,这样待竖立的第一根钢管71慢慢竖立起来。且由于蜗轮蜗杆的自锁性,由于钢管的重力,在工人力气不足或停止操作时,能防止钢管倒落。将钢管联接扣件73放入竖立的第二根钢管72头部,如图9B所示。
第三步,拧动H处,松开稳定杆5,如图9C所示。
第四步,缓缓拧动G处紧固螺钉,让支撑轴4、待竖立的第一根钢管71慢慢降下,对上钢管联接扣件,如图9D。
第五步,拧紧钢管联接扣件,卸下该对接机构,即完成钢管的对接,如图9E。
除说明书所述的技术特征外,均为本专业技术人员的已知技术。

Claims (1)

1.一种建筑外架钢管对接方法,包括辅助对接机构;其特征在于:所述辅助对接机构由以下几部分构成,上套筒,上套筒是由一侧铰链联接另一侧通过螺栓联接的两个半圆弧组成的,在每一半圆弧上分别固定有一个转轴;下套筒,下套筒截面为8字形双套筒,包括固定套筒和开合套筒,其中开合套筒是由一侧铰链联接另一侧螺栓联接的两个半圆弧组成的,所述固定套筒上设有一个紧固螺钉;一支撑轴,所述支撑轴下部插在下套筒的固定套筒中,并在与所述紧固螺钉配合的支撑轴上设有自上而下的渐深的楔形槽;一稳定杆,稳定杆上端与上套筒一侧的转轴活结,稳定杆下端与下套筒固定连接;一蜗轮蜗杆减速机构,所述蜗轮蜗杆减速机构固定在支撑轴的顶部,蜗轮轴与上套筒的另一转轴同轴连接,蜗杆轴为手动操作部;对接钢管过程如下:第一步,一人站在需要竖立钢管位置处,将下套筒的开合套筒固定于竖立的第二根钢管上,安装好稳定杆;另一人从楼面将待竖立的第一根钢管平着接近,站在需要竖立钢管位置处的人将其固定在上套筒上;第二步,由扳手缓缓拧动蜗杆端部,通过蜗轮蜗杆减速机构驱动上套筒竖立,待竖立的第一根钢管竖立起来;将钢管联接扣件放入竖立的第二根钢管头部;第三步,拧动位于稳定杆下端的螺母,松开稳定杆;第四步,拧动紧固螺钉,让支撑轴、待竖立的第一根钢管降下,对上钢管联接扣件;第五步,拧紧钢管联接扣件,卸下辅助对接机构,即完成钢管的对接。
CN201510051704.6A 2012-11-20 2012-11-20 建筑外架钢管对接方法 Active CN104790651B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510051704.6A CN104790651B (zh) 2012-11-20 2012-11-20 建筑外架钢管对接方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510051704.6A CN104790651B (zh) 2012-11-20 2012-11-20 建筑外架钢管对接方法
CN201210473604.9A CN102953544B (zh) 2012-11-20 2012-11-20 建筑外架钢管辅助对接机构

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201210473604.9A Division CN102953544B (zh) 2012-11-20 2012-11-20 建筑外架钢管辅助对接机构

Publications (2)

Publication Number Publication Date
CN104790651A CN104790651A (zh) 2015-07-22
CN104790651B true CN104790651B (zh) 2017-01-18

Family

ID=47762880

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201510051704.6A Active CN104790651B (zh) 2012-11-20 2012-11-20 建筑外架钢管对接方法
CN201210473604.9A Expired - Fee Related CN102953544B (zh) 2012-11-20 2012-11-20 建筑外架钢管辅助对接机构
CN201510051539.4A Active CN104746867B (zh) 2012-11-20 2012-11-20 操作较为便利的建筑外架钢管辅助对接机构

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201210473604.9A Expired - Fee Related CN102953544B (zh) 2012-11-20 2012-11-20 建筑外架钢管辅助对接机构
CN201510051539.4A Active CN104746867B (zh) 2012-11-20 2012-11-20 操作较为便利的建筑外架钢管辅助对接机构

Country Status (1)

Country Link
CN (3) CN104790651B (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0513489A1 (de) * 1991-05-15 1992-11-19 Österreichische DOKA Schalungstechnik Gesellschaft m.b.H. Aufstockbarer Gerüstrahmen
CN201728497U (zh) * 2010-04-15 2011-02-02 青岛东方铁塔股份有限公司 法兰、钢管自动对接装置
CN201776589U (zh) * 2010-08-12 2011-03-30 中冶成工上海五冶建设有限公司 钢管管节对接装置
CN102251680A (zh) * 2011-06-03 2011-11-23 浙江精工钢结构有限公司 链式钢管对口器及钢管对接方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001065065A (ja) * 1999-08-30 2001-03-13 Masamichi Ishigami 足場パイプ利用の構造部品
CN2411302Y (zh) * 1999-12-09 2000-12-20 钱水明 脚手架钢管对接定位夹头
CN203022335U (zh) * 2012-11-20 2013-06-26 邓永红 建筑外架钢管辅助对接机构

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0513489A1 (de) * 1991-05-15 1992-11-19 Österreichische DOKA Schalungstechnik Gesellschaft m.b.H. Aufstockbarer Gerüstrahmen
CN201728497U (zh) * 2010-04-15 2011-02-02 青岛东方铁塔股份有限公司 法兰、钢管自动对接装置
CN201776589U (zh) * 2010-08-12 2011-03-30 中冶成工上海五冶建设有限公司 钢管管节对接装置
CN102251680A (zh) * 2011-06-03 2011-11-23 浙江精工钢结构有限公司 链式钢管对口器及钢管对接方法

Also Published As

Publication number Publication date
CN104746867A (zh) 2015-07-01
CN104746867B (zh) 2016-09-14
CN102953544B (zh) 2015-03-25
CN102953544A (zh) 2013-03-06
CN104790651A (zh) 2015-07-22

Similar Documents

Publication Publication Date Title
CN102561669B (zh) 悬挑式脚手架及其施工方法
CN114439211A (zh) 一种建筑脚手架支撑结构
CN206053284U (zh) 一种可爬升式的电梯井操作平台
CN107893532A (zh) 一种可调节式墙柱模板斜向支撑系统
CN104563484B (zh) 一种建筑外架钢管辅助对接机构
CN206467574U (zh) 用于精轧螺纹钢筋锚具套筒紧固器
CN104790651B (zh) 建筑外架钢管对接方法
CN111851987B (zh) 一种附着式短肢工字钢花篮拉杆拉结式悬挑架施工方法
CN103382768A (zh) 多功能建筑工程施工支架组件
CN105781131A (zh) 装配式建筑墙板安装支撑体系及其构建方法
CN106703017B (zh) 一种灌注桩钢筋笼双向螺纹突齿套筒拧紧装置及使用方法
CN205531248U (zh) 一种建筑脚手架构件
CN204748523U (zh) 高位紧固装置
CN104675104B (zh) 一种操作较为便利的建筑外架钢管辅助对接机构
CN203022335U (zh) 建筑外架钢管辅助对接机构
CN105804417A (zh) 装配式建筑墙板安装用斜支撑及其使用方法
CN209990123U (zh) 一种可调连墙件装置
CN204252496U (zh) 建筑工程吊杆便捷安装装置
CN202658871U (zh) 一种脚手架连墙体
CN206346123U (zh) 桥梁维修加固操作装置
CN201539090U (zh) 移动可调式操作架
CN107780644B (zh) 用于电梯井道施工的作业平台及其使用方法
CN215281729U (zh) 一种顶板膨胀螺栓扳手
CN116122566B (zh) 自动开合圆形墩柱钢模板结构
CN216340826U (zh) 一种新型梁侧预埋式外架连墙件

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181122

Address after: 226300 Andong Village Group 2, Sian Town, Tongzhou District, Nantong City, Jiangsu Province

Patentee after: Nantong Shuangyao Stamping Co., Ltd.

Address before: 325600 Niu Dong village, Le Cheng town, Yueqing City, Wenzhou, Zhejiang

Patentee before: Hu Yan

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210715

Address after: 226300 No.188, Pingwu Road, WuJie Town, Tongzhou District, Nantong City, Jiangsu Province

Patentee after: JIANGSU CHUANGU HEAVY INDUSTRY Co.,Ltd.

Address before: 226300 Andong Village Group 2, Sian Town, Tongzhou District, Nantong City, Jiangsu Province

Patentee before: Nantong Shuangyao Stamping Co.,Ltd.