CN103939300B - 一种海上风电整机安装方法 - Google Patents

一种海上风电整机安装方法 Download PDF

Info

Publication number
CN103939300B
CN103939300B CN201410155140.6A CN201410155140A CN103939300B CN 103939300 B CN103939300 B CN 103939300B CN 201410155140 A CN201410155140 A CN 201410155140A CN 103939300 B CN103939300 B CN 103939300B
Authority
CN
China
Prior art keywords
ship
installation
crane
fan
crane transport
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410155140.6A
Other languages
English (en)
Other versions
CN103939300A (zh
Inventor
丁红岩
张浦阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201410155140.6A priority Critical patent/CN103939300B/zh
Publication of CN103939300A publication Critical patent/CN103939300A/zh
Application granted granted Critical
Publication of CN103939300B publication Critical patent/CN103939300B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Wind Motors (AREA)

Abstract

本发明公开了一种海上风电整机安装方法,将运载有风机整机的滚装船、设有压载空舱的吊机运输船和设有压载空舱的风机安装船就位;对吊机运输船加载使其插体插入风机安装船的插孔中;吊机运输船减载同时风机安装船加载,并利用竖向螺栓将插体和插孔锁紧,使吊机运输船和风机安装船紧密连接在一起;利用吊机运输船的吊装装置将风机整机吊起并安装于风机安装船所固定的筒型基础上部;利用负压下沉安装施工方法将筒型基础及风机整机一体施工安装。本发明将吊机运输船和风机安装船形成一个能够共同运动的安装平台,从而使吊装装置吊起风机整机安装到筒型基础的操作简单易行,安装精度完全可控,所需施工窗口期短,施工安装效果和经济效果明显。

Description

一种海上风电整机安装方法
技术领域
本发明涉及一种海上建筑物的施工方法,具体的说,是涉及一种海上风电整机安装方法。
背景技术
目前在海上风电工程中,海上风电机组的安装一般分为基础、风机塔筒、风机机头及风机叶片四个部分,由运输船舶运输到海上建造位置,先进行基础施工,再通过运输和吊装船舶依次安装风机塔筒、风机机头和风机叶片,最后完成整机调试。
上述传统施工方法需要较长的窗口施工期,加大了海上施工队费用。更重要的是,上述传统施工方法中由于已经安装的结构处于固定状态,船舶和吊机都处于漂浮状态,因此只有在风流、浪流都很小的海洋环境下才能保证施工安装精度。
发明内容
本发明要解决的是现有海上风电机组安装方法施工周期长、安装所需海洋环境条件要求高等技术问题,提供一种海上风电整机安装方法,能够将基础、风机塔筒、风机机头及风机叶片一体化安装,从而提高安装精度,缩短海上施工时间,减少施工费用。
为了解决上述技术问题,本发明通过以下的技术方案予以实现:
一种海上风电整机安装方法,包括如下步骤:
(1)滚装船、吊机运输船和风机安装船就位到风机安装地点;
其中,所述滚装船运载有多台风机整机,所述风机整机包括风机塔筒、风机机头和风机叶片;
所述吊机运输船的船体上设置有吊装装置,所述吊机运输船的底部设置有压载空舱,所述吊机运输船前端设置有插体;
所述风机安装船的底部设置有压载空舱,所述风机安装船的后端设置有插孔,所述风机安装船的前端设置有U形槽,所述U形槽底部固定连接有筒型基础;
所述吊机运输船的插体与所述风机安装船的插孔相匹配,以使所述插体能够插入所述插孔中;
(2)对所述吊机运输船的压载空舱加载,使所述吊机运输船吃水深度加大,直至所述吊机运输船的插体对准于所述风机安装船的插孔;
(3)将所述吊机运输船的插体插入所述风机安装船的插孔中,使所述吊机运输船和所述风机安装船连接在一起;
(4)对所述吊机运输船的压载空舱减载至空舱,同时所述风机安装船的压载空舱加载,使其加载量大于等于对所述吊机运输船的压载空舱的减载量,以使所述插体上表面与所述插孔内的上表面紧密贴合;
(5)利用竖向螺栓将所述插体和所述插孔锁紧固定;
(6)利用所述吊机运输船的吊装装置将所述滚装船上的所述风机整机吊起,并吊装至所述风机安装船的所述U形槽位置,将所述风机整机安装于所述筒型基础上部;
(7)放松所述筒型基础与所述U形槽的连接,利用负压下沉安装施工方法,将所述筒型基础及其上部安装的所述风机整机一体施工安装到设计安装地点。
所述吊机运输船的吊装装置为固定的吊机或可移动的履带吊。
本发明的有益效果是:
本发明将吊机运输船和风机安装船进行适当改造,并利用向上的浮力和向下的压载力,将吊机运输船和风机安装船通过插体和插孔结构紧密连接在一起,形成一个能够共同运动的大型安装平台,从而使吊机运输船上的风机整机与风机安装船上的筒型基础没有相对运动、步调完全一致,进而使得吊装装置吊起风机整机安装到筒型基础的操作过程简单易行,不需要严苛的海洋环境条件,安装精度完全可控,所需施工窗口期短,施工安装效果和经济效果明显。
附图说明
图1是本发明所提供的滚装船的结构示意图;
图2是图1的侧视图;
图3是吊机运输船的结构示意图;
图4是图3的底部平面图;
图5是吊机运输船和风机安装船的工作状态示意图;
图6是图5的A-A剖面图。
图中:1、滚装船;2、吊机运输船;3、风机安装船;4、风机整机;5、吊机;6、插体;7、第一压载空舱;8、插孔;9、第二压载空舱;10、筒型基础;11、竖向螺栓;12、U形槽。
具体实施方式
为能进一步了解本发明的发明内容、特点及效果,兹例举以下实施例,并配合附图详细说明如下:
本实施例披露了一种海上风电整机安装方法,该方法中涉及的施工设备主要包括一艘可以运载多台风机整机4的滚装船1、一艘吊机运输船2和一艘风机安装船3。
如图1和图2所示,滚装船1上运载有10台风机整机4,每台风机整机4包括风机塔筒、风机机头和风机叶片。风机整机4位于滚装船1船体甲板两排布置,并且均位于甲板滚装传输设备上,运输时固定不动,安装时可依次滚动吊装安装。
如图3和图4所示,吊机运输船2的船体底部设置有第一压载空舱7,第一压载空舱7可进行压载和减载,从而控制吊机运输船2吃水深度的变化。吊机运输船2的船体上设置有固定的吊机5,吊机5还可以替换为可移动的履带吊等吊装装置。吊机运输船2的前端设置有插体6,插体6可以插入风机安装船3上预留的插孔8,从而将吊机运输船2与风机安装船3组成一体。插体6上还设置有用于安装竖向螺栓11的螺栓孔。
如图5所示,风机安装船3的船体底部设置有第二压载空舱9,第二压载空舱9可进行压载和减载,从而控制风机安装船3吃水深度的变化。风机安装船3的后端设置有插孔8,插孔8与风机安装船3前端的插体6相匹配,可以使插体6插入其中,从而将吊机运输船2与风机安装船3组成一体。插孔8上也设置有用于安装竖向螺栓11的螺栓孔,该螺栓孔与插体6上的螺栓孔相对应。如图6所示,风机安装船3的前端设置有U形槽12,U形槽12的底部临时固定连接有底部开口的筒型基础10,U形槽12对筒型基础10的临时固定连接可以是螺栓连接、焊接或铰接等具体方式,防止筒型基础10左右滑动即可。
本实施例的海上风电整机安装方法的具体施工步骤如下:
滚装船1、吊机运输船2和风机安装船3相继就位到风机安装地点上。
对吊机运输船2的第一压载空舱7加载,使吊机运输船2的吃水深度加大,直至吊机运输船2的插体6对准于风机安装船3的插孔8。
将吊机运输船2的插体6插入风机安装船3的插孔8中,使吊机运输船2和风机安装船3连接在一起。
对吊机运输船2的第一压载空舱7减载至空舱,同时风机安装船3的第二压载空舱9加载,使其加载量大于等于对吊机运输船2的第一压载空舱7的减载量。这样利用吊机运输船2减载后提供的方向向上的浮力与风机安装船3加载后提供的方向向下的压力,使插体6的上表面与插孔8内的上表面紧密贴合,进而将吊机运输船2和风机安装船3紧密的连接在一起。
利用竖向螺栓11将吊机运输船2的插体6和风机安装船3的插孔8锁紧固定,防止吊机运输船2和风机安装船3左右错动,如图6所示。
利用吊机运输船2上的吊机5将滚装船1上的风机整机4吊起,并吊装至风机安装船3的U形槽12位置,将风机整机4安装于筒型基础10上部,形成基础-风机一体系统。
放松筒型基础10与U形槽12的连接,利用负压下沉安装施工方法,将筒型基础10及其上部安装的风机整机4一体施工安装到设计安装地点。
尽管上面结合附图对本发明的优选实施例进行了描述,但是本发明并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,并不是限制性的,本领域的普通技术人员在本发明的启示下,在不脱离本发明宗旨和权利要求所保护的范围情况下,还可以作出很多形式的具体变换,这些均属于本发明的保护范围之内。

Claims (2)

1.一种海上风电整机安装方法,其特征在于,包括如下步骤:
(1)滚装船、吊机运输船和风机安装船就位到设计安装地点;
其中,所述滚装船运载有多台风电整机,所述风电整机包括风机塔筒、风机机头和风机叶片;
所述吊机运输船的船体上设置有吊装装置,所述吊机运输船的底部设置有压载空舱,所述吊机运输船前端设置有插体;
所述风机安装船的底部设置有压载空舱,所述风机安装船的后端设置有插孔,所述风机安装船的前端设置有U形槽,所述U形槽底部固定连接有筒型基础;
所述吊机运输船的插体与所述风机安装船的插孔相匹配,以使所述插体能够插入所述插孔中;
(2)对所述吊机运输船的压载空舱加载,使所述吊机运输船吃水深度加大,直至所述吊机运输船的插体对准于所述风机安装船的插孔;
(3)将所述吊机运输船的插体插入所述风机安装船的插孔中,使所述吊机运输船和所述风机安装船连接在一起;
(4)对所述吊机运输船的压载空舱减载至空舱,同时所述风机安装船的压载空舱加载,使其加载量大于等于对所述吊机运输船的压载空舱的减载量,以使所述插体上表面与所述插孔内的上表面紧密贴合;
(5)利用竖向螺栓将所述插体和所述插孔锁紧固定;
(6)利用所述吊机运输船的吊装装置将所述滚装船上的所述风电整机吊起,并吊装至所述风机安装船的所述U形槽位置,将所述风电整机安装于所述筒型基础上部;
(7)放松所述筒型基础与所述U形槽的连接,利用负压下沉安装施工方法,将所述筒型基础及其上部安装的所述风电整机一体施工安装到设计安装地点。
2.根据权利要求1所述的一种海上风电整机安装方法,其特征在于,所述吊机运输船的吊装装置为固定的吊机或可移动的履带吊。
CN201410155140.6A 2014-04-17 2014-04-17 一种海上风电整机安装方法 Expired - Fee Related CN103939300B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410155140.6A CN103939300B (zh) 2014-04-17 2014-04-17 一种海上风电整机安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410155140.6A CN103939300B (zh) 2014-04-17 2014-04-17 一种海上风电整机安装方法

Publications (2)

Publication Number Publication Date
CN103939300A CN103939300A (zh) 2014-07-23
CN103939300B true CN103939300B (zh) 2016-03-30

Family

ID=51187132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410155140.6A Expired - Fee Related CN103939300B (zh) 2014-04-17 2014-04-17 一种海上风电整机安装方法

Country Status (1)

Country Link
CN (1) CN103939300B (zh)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105058052B (zh) * 2015-08-28 2017-07-25 中国能源建设集团湖南火电建设有限公司 一种3mw风力发电机组安装方法
CN108951593B (zh) * 2018-07-24 2023-12-08 中国电建集团华东勘测设计研究院有限公司 基于四桶导管架复合基础的海上风机安装系统及安装方法
CN110805528B (zh) * 2019-11-15 2020-07-31 中天科技集团海洋工程有限公司 一种叶轮式风机的吊装工艺
CN111997839B (zh) * 2020-09-09 2021-07-13 贵州工程应用技术学院 一种高可靠性保证风力发电机叶片转轴安装精度的装置
CN113090470B (zh) * 2021-04-13 2022-07-12 保利长大工程有限公司 一种海上风机的安装方法
CN113417311A (zh) * 2021-06-16 2021-09-21 张浦阳 一种海上风电多筒导管架基础施工方法
CN114670976B (zh) * 2022-03-11 2023-05-16 上海勘测设计研究院有限公司 一种背压式海上风电整机运输安装船及方法
CN114715336B (zh) * 2022-04-08 2023-05-26 长江勘测规划设计研究有限责任公司 适用于深水的海上风电筒型基础运输安装一体化船舶及安装方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999043956A1 (en) * 1998-02-27 1999-09-02 Bonus Energy A/S Method for installation of wind turbines at sea, fundation for wind turbines and use of such foundation
WO2003093584A1 (en) * 2002-05-01 2003-11-13 Marine Structure Consultants (Msc) B.V. Method and vessel for manipulating an offshore construction
CN101903235A (zh) * 2007-12-21 2010-12-01 维斯塔斯风力系统集团公司 安装离岸风轮机的方法与驳船系统
CN102926948A (zh) * 2012-11-19 2013-02-13 天津大学 一种海上风电整机安装方法
WO2014057156A1 (es) * 2012-10-08 2014-04-17 Iberdrola Ingenieria Y Construcción, S. A. U. Embarcación para transportar e instalar una plataforma flotante y procedimiento de transporte e instalación de una plataforma flotante que emplea dicha embarcación

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2434823A (en) * 2006-02-06 2007-08-08 Engineering Business Ltd Transport and installation of offshore structures

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999043956A1 (en) * 1998-02-27 1999-09-02 Bonus Energy A/S Method for installation of wind turbines at sea, fundation for wind turbines and use of such foundation
WO2003093584A1 (en) * 2002-05-01 2003-11-13 Marine Structure Consultants (Msc) B.V. Method and vessel for manipulating an offshore construction
CN101903235A (zh) * 2007-12-21 2010-12-01 维斯塔斯风力系统集团公司 安装离岸风轮机的方法与驳船系统
WO2014057156A1 (es) * 2012-10-08 2014-04-17 Iberdrola Ingenieria Y Construcción, S. A. U. Embarcación para transportar e instalar una plataforma flotante y procedimiento de transporte e instalación de una plataforma flotante que emplea dicha embarcación
CN102926948A (zh) * 2012-11-19 2013-02-13 天津大学 一种海上风电整机安装方法

Also Published As

Publication number Publication date
CN103939300A (zh) 2014-07-23

Similar Documents

Publication Publication Date Title
CN103939300B (zh) 一种海上风电整机安装方法
CN104192272B (zh) 自航自升式风电运输安装船及风电机组的安装方法
EP2917097B1 (en) Floatable transportation and installation structure for transportation and installation of a floating wind turbine, a floating wind turbine and method for transportation and installation of the same
CN202828023U (zh) 设置有插拔桩装置的浅滩海区抢险作业船
CN102815374B (zh) 设置有插拔桩装置的浅滩海区抢险作业船及船体固定方法
US9022691B2 (en) Method of installing an offshore wind turbine and a transport vessel thereof
DK201170319A (en) A self-propelled semi-submersible offshore wind farm installation vessel with a large crane
CN106965906B (zh) 一种海上三筒基础式风电整机安装船及其一步式施工方法
CN108016575A (zh) 一种浮式风机及tlp平台运输安装一体船及其运输安装方法
EP2818703B1 (en) Ship for installing offshore wind turbine and method for installing offshore wind turbine
CN208085949U (zh) 一种浮式风机及tlp平台运输安装一体船
CN110712721A (zh) 一种海上风场风机安装作业工程船及其作业方法
CN101792012B (zh) 一种海上风机整体运输与安装的方法及专用工程船
CN103693170A (zh) 一种漂浮式海上风电组装平台及用该平台组装海上风机的方法
CN103661827A (zh) 海上潮间带区域的风机总成安装系统及其施工方法
CN103883273A (zh) 利用饱和潜水支持船上的双吊机安装立管的方法
JP5820953B1 (ja) 風力発電装置の組み付け方法、風力発電装置の分解方法、風力発電装置の設置方法、及び風力発電装置の作業用船舶
CN106894953B (zh) 一种海上四筒基础式风电整机安装船及其一步式施工方法
CN114604373B (zh) 一种压载式海上风电整机运输安装船及方法
CN104554639A (zh) 大型近海风电设备安装装备
KR101338358B1 (ko) 해상 풍력발전기 설치선
KR101297669B1 (ko) 해상풍력발전기 설치 전용선을 이용한 해상풍력발전기 설치방법
CN201901538U (zh) 自升式风机安装起重机及海上风机运输安装设备
CN106976808B (zh) 超大型离岸风机水下基座的运输安装方法及运输安装设备
CN108791738A (zh) 一种大型海上风机整体浮托安装方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160330