As Control Process is a Key Part in project life cycle and it is Success this Thesis will show Ho... more As Control Process is a Key Part in project life cycle and it is Success this Thesis will show How to utilize BIM Technology in Progress Monitoring, Project Control, Estimation and Budgeting rather than Traditional Manual method used in Construction Industry till now by do the Followings:
1- Creating Workflow for Progress Monitoring based on BIM Technology which is based on Three Concepts WBS, Tags, Object Identifier (Member Mark).
2- Make the Model more intelligent by adding Additional Information such as Progress data through Tags.
3-Link BIM Model with Primavera P6 by using Object Identifier as Activity Code.
4- Reflect and Present Construction Project in a Virtual environment so each Element has a scope to enable us to understand three Important Parameter Cost, Time, Quality and Quantity needed to Build this element in Real through Quantification Engine of AECOsim and Integration of Part and BOQ Item (Component) and Calculation Formula. these Quantification Process Complies with Quantity Surveying method, Method of Measurement and Quantity Surveying Standards and that enable us to capture Progress in an effective Way.
5-Bentley Authoring Solution (AECOsim Building Designer V8) program used as Quantification Engine to develop Project Takeoff and for Progress Monitoring, Excel Spread Sheet for Estimation and Sharing data, Primavera P6 as Management Program to Generate Progress Report, Synchro Pro for 4D Simulation of Progress.
As Control Process is a Key Part in project life cycle and it is Success this Thesis will show Ho... more As Control Process is a Key Part in project life cycle and it is Success this Thesis will show How to utilize BIM Technology in Progress Monitoring, Project Control, Estimation and Budgeting rather than Traditional Manual method used in Construction Industry till now by do the Followings:
1- Creating Workflow for Progress Monitoring based on BIM Technology which is based on Three Concepts WBS, Tags, Object Identifier (Member Mark).
2- Make the Model more intelligent by adding Additional Information such as Progress data through Tags.
3-Link BIM Model with Primavera P6 by using Object Identifier as Activity Code.
4- Reflect and Present Construction Project in a Virtual environment so each Element has a scope to enable us to understand three Important Parameter Cost, Time, Quality and Quantity needed to Build this element in Real through Quantification Engine of AECOsim and Integration of Part and BOQ Item (Component) and Calculation Formula. these Quantification Process Complies with Quantity Surveying method, Method of Measurement and Quantity Surveying Standards and that enable us to capture Progress in an effective Way.
5-Bentley Authoring Solution (AECOsim Building Designer V8) program used as Quantification Engine to develop Project Takeoff and for Progress Monitoring, Excel Spread Sheet for Estimation and Sharing data, Primavera P6 as Management Program to Generate Progress Report, Synchro Pro for 4D Simulation of Progress.
Uploads
1- Creating Workflow for Progress Monitoring based on BIM Technology which is based on Three Concepts WBS, Tags, Object Identifier (Member Mark).
2- Make the Model more intelligent by adding Additional Information such as Progress data through Tags.
3-Link BIM Model with Primavera P6 by using Object Identifier as Activity Code.
4- Reflect and Present Construction Project in a Virtual environment so each Element has a scope to enable us to understand three Important Parameter Cost, Time, Quality and Quantity needed to Build this element in Real through Quantification Engine of AECOsim and Integration of Part and BOQ Item (Component) and Calculation Formula. these Quantification Process Complies with Quantity Surveying method, Method of Measurement and Quantity Surveying Standards and that enable us to capture Progress in an effective Way.
5-Bentley Authoring Solution (AECOsim Building Designer V8) program used as Quantification Engine to develop Project Takeoff and for Progress Monitoring, Excel Spread Sheet for Estimation and Sharing data, Primavera P6 as Management Program to Generate Progress Report, Synchro Pro for 4D Simulation of Progress.
1- Creating Workflow for Progress Monitoring based on BIM Technology which is based on Three Concepts WBS, Tags, Object Identifier (Member Mark).
2- Make the Model more intelligent by adding Additional Information such as Progress data through Tags.
3-Link BIM Model with Primavera P6 by using Object Identifier as Activity Code.
4- Reflect and Present Construction Project in a Virtual environment so each Element has a scope to enable us to understand three Important Parameter Cost, Time, Quality and Quantity needed to Build this element in Real through Quantification Engine of AECOsim and Integration of Part and BOQ Item (Component) and Calculation Formula. these Quantification Process Complies with Quantity Surveying method, Method of Measurement and Quantity Surveying Standards and that enable us to capture Progress in an effective Way.
5-Bentley Authoring Solution (AECOsim Building Designer V8) program used as Quantification Engine to develop Project Takeoff and for Progress Monitoring, Excel Spread Sheet for Estimation and Sharing data, Primavera P6 as Management Program to Generate Progress Report, Synchro Pro for 4D Simulation of Progress.