In the precedence-constrained scheduling problem (we call it the PS problem), the goal is to schedule a set of jobs with precedence constraints on a set of identical machines so as to minimize the overall time for processing them (called the makespan).
Scheduling jobs with precedence constraints on a set of identical machines to minimize the total processing time (makespan) is a fundamental problem in ...
Apr 28, 2014 · Scheduling jobs with precedence constraints on a set of identical machines to minimize the total processing time (makespan) is a fundamental problem in ...
This work introduces a general model of malleable job scheduling, where each machine has a (possibly different) speed for each job, and the processing time ...
Precedence-Constrained Scheduling of Malleable Jobs with Preemption
link.springer.com › content › pdf
In the precedence-constrained scheduling problem (we call it the PS problem), the goal is to schedule a set of jobs with precedence constraints on a set of ...
Usually, precedence constraints are given by a partial order on the set of jobs, and each job requires all its predecessors to be completed before it can start.
We consider the preemption version of the Minimum Makespan Workflow Scheduling of Malleable Jobs with Precedence Constraints (MMWS-MP) problem [24], [27] and ...
People also ask
Which scheduling algorithm schedules periodic tasks using a static priority policy with preemption?
The objective of the scheduler is to maximize the sum of the values of the jobs that complete by their respective deadlines. The scheduler can use preemption to ...
An approximation algorithm for scheduling malleable tasks with precedence constraints is proposed and it is shown that the result is very close to the best ...
In this paper we propose an approximation algorithm for scheduling malleable tasks with precedence constraints. Based on an interesting model for malleable ...