10000 minor #11576 Change wording about time for downstream projects (BackE… · symfony/symfony-docs@6ef2b7b · GitHub
[go: up one dir, main page]

Skip to content

Commit 6ef2b7b

Browse files
committed
minor #11576 Change wording about time for downstream projects (BackEndTea)
This PR was submitted for the master branch but it was merged into the 3.4 branch instead (closes #11576). Discussion ---------- Change wording about time for downstream projects I felt the wording here was a bit off. The 'seems like' made it feel like this is something that is still being considered. Commits ------- 1c4d8fc Change wording about time for downstream projects
2 parents aab5280 + 1c4d8fc commit 6ef2b7b

File tree

1 file changed

+1
-1
lines changed

1 file changed

+1
-1
lines changed

contributing/code/security.rst

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -78,7 +78,7 @@ projects. The process works as follows:
7878
date for a joint release (there is no guarantee that all releases will
7979
be at the same time but we will try hard to make them at about the same
8080
time). When the issue is not known to be exploited in the wild, a period
81-
of two weeks seems like a reasonable amount of time.
81+
of two weeks is considered a reasonable amount of time.
8282

8383
The list of downstream projects participating in this process is kept as small
8484
as possible in order to better manage the flow of confidential information

0 commit comments

Comments
 (0)
0