List view
Stuff we want to include in the first "official" release of the framework.
No due date•24/147 issues closedStuff we want do later. These tickets are intentionally postponed because usually not core or fundamental.
No due date•6/36 issues closed- No due date•2/20 issues closed
Stuff we probably won’t do soon. We refer to these tickets and sometimes look through them, but they are easy to ignore, somewhat intentionally ignored.
No due date•1/4 issues closedStuff we scheduled to do next. We never change or rename this milestone.
No due date•15/62 issues closedStuff we must do soon. We never change or rename this milestone.
No due date•245/285 issues closed