FFFF GitHub · Where software is built
[go: up one dir, main page]

Skip to content

Milestones

List 6C5B view

  • Add unit tests to set automatic runs for Continuous Integration

    Overdue by 6 year(s)
    Due by April 30, 2019
  • Build on best practices on the top of Blazor. This will add support for LESS and normal CSS as an option to SCSS default. It will investigate on possible Rx based Messaging architecture for Bionic apps.

    Overdue by 7 year(s)
    Due by January 15, 2019
    0/1 issues closed
  • Bionic CLI for PWA.

    Overdue by 7 year(s)
    Due by December 16, 2018
    0/4 issues closed
  • Ensure that current functionality works fine in OSX, Linux and Windows. Currently everything is working well in OSX. There's a minor hurdle in Linux but quite a few issues on Windows. During this process, code should be further simplified and reused. A new lib will be introduced to hold reusable pieces of functionality between CLI and Plugins. Keep new features to a minimum.

    Overdue by 7 year(s)
    Due by October 31, 2018
    4/6 issues closed
0