Putrajaya line
Putrajaya Line | |
---|---|
Overview | |
Other name(s) | MRT 2, MRT Line 2, PY Line, PYL |
Native name | MRT Laluan Putrajaya |
Status | Operational |
Owner | MRT Corp |
Line number | 12 (yellow) |
Locale | Klang Valley |
Termini |
|
Stations | 36 and 5 reserved[1][Note 1] |
Website | myrapid |
Service | |
Type | Rapid transit |
System | Rapid KL |
Services | Kwasa Damansara–Putrajaya Sentral |
Operator(s) | Rapid Rail |
Depot(s) | Sungai Buloh Depot Serdang Depot |
Rolling stock | 49 Hyundai Rotem four-car trainsets (wide profile) |
Daily ridership | 138,192 (Q3 2024)[2] |
Ridership | 29.56 million (2023) |
History | |
Opened | Phase 1: 16 June 2022 Kwasa Damansara PY01 – Kampung Batu PY13 Phase 2: 16 March 2023 Kentonmen PY14 – Putrajaya Sentral PY41 |
Technical | |
Line length | 57.7 km (35.9 mi)[3] Elevated: 44.2 km (27.5 mi) Underground: 13.5 km (8.4 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 750 V DC third rail |
Conduction system | Automated and driverless |
Operating speed | 100 km/h (62 mph) |
The MRT Putrajaya Line, is the second Mass Rapid Transit (MRT) line in Klang Valley, Malaysia, and the third fully automated and driverless rail system in the country. It was previously known as the MRT Sungai Buloh–Serdang–Putrajaya Line. The line stretches from Kwasa Damansara to Putrajaya and runs through densely populated areas such as Sri Damansara, Kepong, Batu, Jalan Ipoh, Sentul, Kampung Baru, Jalan Tun Razak, KLCC, Tun Razak Exchange, Kuchai Lama, Seri Kembangan and Cyberjaya.
Phase 1 operations of the line between Kwasa Damansara and Kampung Batu commenced on 16 June 2022.[4] While the Phase 2 which covers the remaining of the line including the underground stretch was opened on 16 March 2023.[5]
The line is numbered 12 and coloured yellow on official transit maps.
The line was developed and owned by MRT Corp but operated as part of the Rapid KL network by Rapid Rail. It also forms part of the Klang Valley Integrated Transit System.
The line, totalling 57.7 km (35 miles 68 chains) in length, includes 5.5 km (3.4 mi) annexed from the MRT Kajang Line, making it the longest metro line in Malaysia, and one of the longest driverless rapid transit lines in the world. The line includes a 13.5 km (8.4 mi) underground section. A total of 37 stations, 11 of them underground, were built.
Route
[edit]The MRT starts in Kwasa Damansara where it annexed the section from here to Sungai Buloh from the MRT Kajang Line. From Sungai Buloh, the line runs parallel with the KTM Komuter line to Kepong Sentral/Sri Damansara Timur. However, there are a few stations the MRT line between the two which is not served by the KTM.
The MRT then continues towards the towns of Kepong and Jinjang. As of the first phase, the Putrajaya line ends at Kampung Batu. At Jalan Ipoh, the line starts going underground while Jalan Ipoh itself being the only station on the network to be half-sunken/sub-surface. The line carries under the Ipoh Road to Titiwangsa which will interchange with the LRT Ampang/Sri Petaling, KL Monorail and future MRT Circle lines. The line then runs under the Hospital Kuala Lumpur and meets the connecting station to LRT Kelana Jaya line (also underground) at Ampang Park. Persiaran KLCC serves as a second station in the KLCC subdistrict, itself also served by the LRT Kelana Jaya Line. The line continues to Tun Razak Exchange, interchanging with the Kajang line. The Putrajaya Line reunites with the Ampang/Sri Petaling line at Chan Sow Lin.
After thru provisional Bandar Malaysia North and South stations, the MRT Putrajaya line resurfaces at Taman Desa portal, just before Kuchai station. Once again, the line meets with the LRT Sri Petaling line at Sungai Besi,[6] then continuing to serve Serdang. Following this, the line briefly parallels KTM and KLIA Transit (airport express) until Serdang Raya Selatan, and veers off to Universiti Putra Malaysia and the Seri Kembangan subdistrict. The MRT line then enters Sepang constituency, having 3 stops including two in Cyberjaya, before ending at Putrajaya Sentral, where it interchanges with the KLIA Transit. The station may be integrated with the proposed Putrajaya Monorail in the future. Putrajaya Sentral will also be the southernmost station under the Rapid KL rail network.[7]
History
[edit]Initial planning and construction
[edit]The MRT2 project was initially planned to be between Kuala Lumpur and Port Klang, similar to Shah Alam Line's alignment.[8][9] However, by October 2014, it was revised to be from Sungai Buloh, Selayang to Pandan.[10]
The project was official approved by the Federal government in March 2015 and allocated RM23 billion in the 2015 Budget[11][12] and construction was expected to begin by November 2015.[13][14] However, construction was delayed due to adjustments to the alignment to extend the line to Putrajaya and to provide connectivity to the proposed High Speed Rail project.[15] Construction officially begun in September 2016 with a groundbreaking ceremony at the site of the future Putrajaya Sentral MRT station by former Prime Minister Dato' Seri Najib Tun Razak.[16][17]
On 10 October 2017, An explosion has occurred at the Mass Rapid Transit (MRT) station construction site in Bandar Malaysia. According to the police, it was believed that the explosion happened because of an old unexploded bomb from the Second World War through the initial investigation. Three Bangladesh workers were seriously injured and two of them lost their legs while another suffered injuries on the hands and legs.[18]
On 3 March 2018, A construction worker died while two others survived when a launching gantry at an MRT construction site in Jalan Jinjang (Work Package V203), collapsed at around 11:40pm.[19]
Project re-tender and cost cutting
[edit]After the fall of BN led Federal government in May 2018, the new PH led Federal government, citing the mounting national debt and concerns with the direct negotiation tender process, proposed various cost cutting measures to a lists of federal government projects, including the MRT2 project. In October 2018, then Finance Minister, Lim Guan Eng announced the decision to change the project structure as well as terminate the contract from MMC-Gamuda and re-tender the unfinished underground portion of the project by an open tender process, due to the fact the Federal Government and MMC-Gamuda have failed to reach an agreement relating to the underground portion of the construction project. This decision had caused a lot of protests from MMC-Gamuda and workers due to the fact that some 20,000 workers tend to lose their job.[20][21][22] Due to budget concerns, and a re-tender, construction costs proposed by MMC-Gamuda is about half what it was previously. The two Bandar Malaysia Stations have also been cancelled and listed as provisional. The cost for construction of the underground portion is now RM13.11 billion. This brought to the entire cost for this project to be RM30.53 billion from the RM39.35 billion previously. This means MMC-Gamuda now secured the contract of the underground section and allowed to continue the construction.[23][24]
Phase 1
[edit]By 3 April 2021, The Construction progress of Phase One section of the MRT Putrajaya Line (Kwasa Damansara – Kampung Batu) is at 97% and was planned to begin operations in August 2021.[25] However, this was postponed multiple times due to the COVID-19 movement control order in Malaysia[26] and that the line requires furthering testing. The MRT Putrajaya Line Phase 1 operations of the MRT Putrajaya Line was official launched by then Prime Minister Ismail Sabri Yaakob on 16 June 2022 at 3pm,[27] along with 1 month of free rides for all public transportation services under RapidKL including the MRT.[28]
Phase 2
[edit]By 23 December 2022, the construction works of MRT Putrajaya Line Phase 2 were completed and the operational readiness phase was in progress. Because the tests could take longer than usual to pass, the opening date of Phase 2 was expected in March 2023, delayed two months from the original January 2023 deadline.[29]
Phase 2 of the MRT Putrajaya Line was officially launched by Prime Minister Anwar Ibrahim at the Serdang Depot on 16 March 2023 at 3pm.[30] Free rides for the MRT Putrajaya Line were also announced effective from 16 March 2023 until 31 March 2023.[31]
The total cost of the project was ultimately put at RM56.93 billion.[32]
Station designs
[edit]Elevated station concepts
[edit]The proposed design for the elevated stations is based on the “Serambi” concept. This concept is focused on the inspiring interaction and communication at a foyer or entrance space of a house such as the entrance space at a traditional rumah kampung or rumah panjang. The design opted is a simple and timeless design, which is derived from various design concepts, including that of the Japanese zen concept. Other aspects include open space, natural lighting and ventilation, and natural visual effects via play of lighting and shadows.[33]
Compared to the Kajang Line's elevated station design, the columns have been pushed to the sides of the station, giving the stations an open and airy feel.
Underground station concepts
[edit]Each of the underground stations will carry its own individual theme, similar to that of the Kajang Line stations. The proposed designs range from preserving the rustic, reflecting tidal rhythm, promoting well-being, vibrancy, pulse of life, discovering culture, molding forms, inspired by nature to streamlined flow.[33]
List of stations
[edit]28 (23 elevated + 1 half-sunken + 4 underground) out of 35 stations (excluding the ones on the MRT Kajang Line) are expected to have feeder bus services.
Kwasa Damansara station, along with the adjoining Sungai Buloh and Kampung Selamat stations were previously built as part of the MRT Kajang Line. These three stations are currently annexed by the Putrajaya Line, thus making Kwasa Damansara the interchange station between the two MRT lines.
Station Code | Station Name | Image | Opened | Platform type | Position | Park & Ride | Connecting Bus Lines | Working Name | Interchange/Notes |
PY01 | Kwasa Damansara | 16 June 2022 | Stacked Island | Elevated | ✓ | N/A | Kota Damansara | Northern terminus of both the MRT Putrajaya Line and MRT Kajang Line.
Cross-platform interchange with KG04 MRT Kajang Line. | |
PY02 | Rubber Research Institute (RRI) | - | - | - | - | - | - | RRI | Provisional station[34] |
PY03 | Kampung Selamat | 16 June 2022 | Side | Elevated | N/A | 1 line | Kampung Baru Sungai Buloh | Exit to D'Sara Sentral. | |
PY04 | Sungai Buloh | Island | ✓ | 6 lines | N/A | Connecting station, without paid area integration, to KA08 KTM Tanjung Malim-Port Klang Line and KTM ETS. | |||
PY05 | Damansara Damai | Island | Elevated | N/A | 1 line | N/A | |||
PY06 | Sri Damansara Barat | Island | ✓ | 1 line | Sri Damansara West | ||||
PY07 | Sri Damansara Sentral | Side | ✓ | 3 lines | Sri Damansara East | ||||
PY08 | Sri Damansara Timur | Island | ✓ | 3 lines | Kepong Sentral | Connecting station, without paid-area integration, to KA07 Kepong Sentral for the KTM Tanjung Malim-Port Klang Line and KTM ETS. | |||
PY09 | Metro Prima | Island | ✓ | 5 lines | Metro Prima | Feeder bus T112 to KA06 Kepong for the KTM Tanjung Malim-Port Klang Line.
Exit to AEON Mall Metro Prima. | |||
PY10 | Kepong Baru | Island | N/A | 1 line | Kepong Baru | ||||
PY11 | Jinjang | Island | ✓ | 3 lines | Jinjang | ||||
PY12 | Sri Delima | Island | N/A | 3 lines | Seri Delima | Exit to Brem Mall Kepong. | |||
PY13 | Kampung Batu | Island | ✓ | 3 lines | Kampung Batu | Connecting station, without paid-area integration, with KC03 KTM Batu Caves-Pulau Sebang Line. | |||
PY14 | Kentonmen | 16 March 2023 | Side | Elevated | ✓ | 3 lines | Kentonmen | ||
PY15 | Jalan Ipoh | Island | Half-sunken | N/A | 3 lines | Jalan Ipoh | Underground alignment begins after this station
Exit to Mutiara Complex. | ||
PY16 | Sentul Barat | Island | Underground | N/A | 3 lines | Sentul West |
Theme: Preserving The Rustic | ||
PY17 | Titiwangsa | Island | N/A | 6 lines | Titiwangsa | Interchange station with AG3 SP3 MR11 LRT Ampang Line, LRT Sri Petaling Line and KL Monorail.
Proposed interchange with CC08 MRT Circle Line. Theme: Tidal Rhythm | |||
PY18 | Hospital Kuala Lumpur | Diverging Island | N/A | N/A | Hospital Kuala Lumpur |
Theme: Promoting Well-Being | |||
PY19 | Raja Uda–UTM | Island | N/A | 2 lines | Kampung Baru North |
Theme: Resonating Heritage | |||
PY20 | Ampang Park | Stacked | N/A | 2 lines | Ampang Park | Connecting station, without paid-area integration, with KJ9 LRT Kelana Jaya Line.
Theme: Vibrancy Exit to Intermark Mall. | |||
PY21 | Persiaran KLCC | Stacked | N/A | N/A | KLCC East |
Theme: Pulse of Life | |||
PY22 | Conlay–Kompleks Kraf | Island | N/A | N/A | Conlay |
Theme: Discovering Culture | |||
PY23 | Tun Razak Exchange–Samsung Galaxy (TRX) | Stacked Island | N/A | 1 line | Tun Razak Exchange | Cross-platform interchange with KG20 MRT Kajang Line.
Theme: Islamic Corporate Exit to The Exchange TRX via an underground passageway. | |||
PY24 | Chan Sow Lin | Island | N/A | 4 lines | Chan Sow Lin | Interchange station with AG11 SP11 LRT Ampang and Sri Petaling Lines.
Theme: Moulding Forms | |||
PY25 | Bandar Malaysia Utara | - | - | ✓ | ✓ | Bandar Malaysia North | Provisional station[35]
Theme: Inspired By Nature | ||
PY26 | Bandar Malaysia Selatan | - | - | ✓ | ✓ | Bandar Malaysia South | Provisional station[35]
Proposed interchange with KTM Batu Caves-Pulau Sebang Line, ERL KLIA Transit and KTM ETS. Theme: Streamlined Flow | ||
PY27 | Kuchai | 16 March 2023 | Island | Elevated | ✓ | 5 lines | Kuchai Lama | Proposed interchange with CC27 MRT Circle Line | |
PY28 | Taman Naga Emas | Island | ✓ | 1 line | Taman Naga Emas | ||||
PY29 | Sungai Besi | Side | ✓ | 3 lines | Sungai Besi | Interchange station with SP16 LRT Sri Petaling Line. | |||
PY30 | Taman Teknologi | - | - | - | - | Technology Park | Provisional station | ||
PY31 | Serdang Raya Utara | Island | Elevated | ✓ | 3 lines | Serdang Raya North | Exit to One South | ||
PY32 | Serdang Raya Selatan | Island | ✓ | 1 line | Serdang Raya South | Exit to South City Plaza | |||
PY33 | Serdang Jaya | Island | N/A | 4 lines | Seri Kembangan | ||||
PY34 | UPM | Island | ✓ | 3 lines | UPM | Exit to Universiti Putra Malaysia (UPM) | |||
PY35 | Taman Universiti | - | Side | - | - | - | Taman Universiti | Provisional station | |
PY36 | Taman Equine | 16 March 2023 | Island | Elevated | ✓ | 3 lines | Equine Park | ||
PY37 | Putra Permai | Island | N/A | 2 line | Taman Putra Permai | ||||
PY38 | 16 Sierra | Island | N/A | ✓ | 16 Sierra | ||||
PY39 | Cyberjaya Utara–Finexus | Island | ✓ | 2 lines | Cyberjaya North | ||||
PY40 | Cyberjaya City Centre–Limkokwing | Island | N/A | 2 lines | N/A | ||||
PY41 | Putrajaya Sentral | Island | ✓ | 8 lines | Putrajaya Sentral | Southern terminus. Connecting station, without paid-area integration, with KT3 ERL KLIA Transit and proposed 14 Putrajaya Monorail. |
Rolling stock
[edit]The rolling stock is provided by HAP Consortium which consists of Hyundai Rotem, Apex Communications and POSCO Engineering. The trains are fully automatic with a capacity of 1,200 passengers in a 4-car trainsets formation.[36]
The 4-car trainsets are maintained at 2 purpose-built facilities, Sungai Buloh and Serdang depots, located nearby Kwasa Damansara and the proposed Taman Universiti stations respectively.[37]
The front and back of the trainsets resemble a duck's bill, which is why they are called "Ducky".
Formation
[edit]The train consists of four cars, with car 1 facing towards Kwasa Damansara and car 4 facing towards Putrajaya Sentral.
Set designation | 1 | 3 | 4 | 2 |
---|---|---|---|---|
Formation | Cabin | Middle Car | Middle Car | Cabin |
Ridership
[edit]Putrajaya Line Ridership[38][39] | ||||
---|---|---|---|---|
Year | Month/Quarter | Ridership | Annual Ridership | Note |
2024 | Q4 | 34,825,366 | ||
Q3 | 12,713,690 | |||
Q2 | 11,349,890 | |||
Q1 | 10,761,786 | |||
2023 | Q4 | 10,244,894 | 29,555,851 | PY13 Kampung Batu – PY41 Putrajaya Sentral section opened on 16 March 2023 |
Q3 | 8,868,780 | |||
Q2 | 7,223,564 | |||
Q1 | 3,218,613 | |||
2022 | Q4 | 1,904,804 | 4,147,577 | |
Q3 | 1,873,209 | |||
Q2 | 369,564 | PY01 Kwasa Damansara – PY13 Kampung Batu section opened on 16 June 2022 | ||
Q1 | - |
Criticism
[edit]Inaccessibility of stations and inadequate first and last mile connectivity has been criticized by potential users of the new MRT line - a problem which has already led to lower than expected ridership on other public transport lines in the Klang Valley. For example, the Cyberjaya stations are located far away from the main town centre.[40]
References
[edit]- ^ "PUTRAJAYA LINE STATIONS". Archived from the original on 15 January 2021. Retrieved 1 January 2021.
- ^ "Ridership". Rapid Rail Performance Update. RapidKL. 1 November 2024. Archived from the original on 11 November 2024. Retrieved 12 November 2024.
- ^ "MRT Putrajaya Line opens - we've tried it; here's our experience and guide to KV's new rail line - paultan.org". Paul Tan's Automotive News. 15 March 2023. Retrieved 17 March 2023.
- ^ "MRT Corp". www.facebook.com. Archived from the original on 19 May 2022. Retrieved 20 March 2022.
- ^ "Putrajaya MRT line set for full opening on March 16". Free Malaysia Today. Retrieved 3 March 2023.
- ^ "Putrajaya Line". MRT Corp. Archived from the original on 23 September 2022. Retrieved 23 September 2022.
- ^ Tan, Danny (15 April 2019). "Kajang-Putrajaya rail project could be revived – report". paultan.org. Archived from the original on 23 September 2022. Retrieved 23 September 2022.
- ^ "Draft Urban Rail Development Plan" (PDF). Draft Greater KL/ Klang Valley Land Public Transport Master Plan. SPAD. Retrieved 22 February 2012.
- ^ "Gamuda, MMC likely to get RM24.9bil KVMRT 2 tunnelling job". The Star. 15 May 2013. Archived from the original on 15 December 2013. Retrieved 2 September 2013.
- ^ "Original plan was for new MRT2 to start from Sg Buloh and not Selayang". The Star Online. Archived from the original on 5 May 2015. Retrieved 27 April 2015.
- ^ "MRT line 2 from Sg Buloh to Putrajaya gets green light". The Rakyat Post. Archived from the original on 4 March 2016. Retrieved 22 September 2014.
- ^ "Budget 2015: Boon for construction". The Star Online. Archived from the original on 12 October 2014. Retrieved 11 October 2014.
- ^ Ch'ng, Brenda (3 December 2014). "Building of new MRT second line to begin next November". The Star. Star. Star Publication. Archived from the original on 2 December 2020. Retrieved 3 December 2014.
- ^ "New alignment for Sg Buloh-Putrajaya MRT line proposed". The Star Online. Archived from the original on 5 April 2015. Retrieved 3 April 2015.
- ^ "New alignment for Sg Buloh-Putrajaya MRT line proposed". The Star Online. Archived from the original on 5 April 2015. Retrieved 3 April 2015.
- ^ "PM launches RM32b second MRT line to turn Klang Valley into world class city". 15 September 2016. Archived from the original on 15 June 2017. Retrieved 1 June 2017.
- ^ Abas, Azura; Aziz, Fazleena (15 September 2016). "MRT Sg Buloh-Serdang-Putrajaya Line to cut travel time to KL to 30 minutes". Retrieved 23 September 2022.
- ^ "Blast at MRT construction site caused by World War 2 bomb". NST Online. 11 October 2017. Archived from the original on 4 March 2018. Retrieved 4 March 2018.
- ^ "Worker killed as launching gantry collapses at MRT construction site [NSTTV]". NST Online. 4 March 2018. Archived from the original on 4 March 2018. Retrieved 4 March 2018.
- ^ "23% saved on MRT2 above-ground works, underground part to be retendered says Guan Eng - Nation | The Star Online". www.thestar.com.my. Archived from the original on 6 November 2018. Retrieved 6 November 2018.
- ^ "Termination of MMC-Gamuda MRT2 contract a Cabinet decision, says Guan Eng - Nation | The Star Online". www.thestar.com.my. Archived from the original on 6 November 2018. Retrieved 6 November 2018.
- ^ "Azmin confirms setting up of Cabinet committee to review MRT2 contract - Nation | The Star Online". www.thestar.com.my. Archived from the original on 6 November 2018. Retrieved 6 November 2018.
- ^ "MoF: MMC-Gamuda to continue underground MRT2, costs cut to RM13.11b". The Edge Markets. 26 October 2018. Archived from the original on 29 October 2018. Retrieved 29 October 2018.
- ^ "Cabinet accepts MMC-Gamuda offer - Business News | The Star Online". www.thestar.com.my. Archived from the original on 6 November 2018. Retrieved 6 November 2018.
- ^ "Phase one of Putrajaya MRT line almost complete, operations scheduled to start in August | The Star". www.thestar.com.my. Archived from the original on 3 April 2021. Retrieved 3 April 2021.
- ^ "Putrajaya Line MRT Phase 1 Expected To Open In November 2021". 8 July 2021. Archived from the original on 10 July 2021. Retrieved 10 July 2021.
- ^ "First phase of Putrajaya Line opens on June 16". Freemalaysiatoday. 21 May 2022. Retrieved 2 June 2022.
- ^ Muhamad, Hasimi. "Berita gembira! Tambang percuma MRT, LRT, selama sebulan". Astro Awani. Retrieved 16 June 2022.
- ^ "Phase 2 of Putrajaya MRT Line fully operational in March". Freemalaysiatoday. 23 December 2022. Retrieved 23 December 2022.
- ^ "Putrajaya MRT line set for full opening on March 16". Freemalaysiatoday. 3 March 2023. Retrieved 3 March 2023.
- ^ "Free rides on Putrajaya MRT till March 31". Freemalaysiatoday. 16 March 2023. Retrieved 16 March 2023.
- ^ "Urban rail network a reality after almost a decade". The Star. 17 March 2023. Retrieved 29 September 2023.
- ^ a b "Stations". MRT Corp. Archived from the original on 4 March 2018. Retrieved 4 March 2018.
- ^ "Putrajaya Line". MRT Corp. Retrieved 4 March 2023.
- ^ a b seetrustudio03. "Sungai Besi Air Force Base (Bandar Malaysia Utara)". MRT Corp. Archived from the original on 7 September 2021. Retrieved 7 September 2021.
{{cite web}}
: CS1 maint: numeric names: authors list (link) - ^ "MRCB, IJM, Apex among winners of RM4.2b MRT Line 2 jobs - Business News | the Star Online". Archived from the original on 24 June 2016. Retrieved 3 June 2016.
- ^ Progress Report (PDF). MRT Corp. 2012. p. 13. Archived from the original (PDF) on 4 March 2016.
- ^ "Statistic of Rail Transport". Ministry of Transport (Malaysia). Archived from the original on 12 January 2023.
- ^ "Public Transportation Ridership". Ministry of Transport (Malaysia). Retrieved 18 January 2024.
- ^ "Govt should focus on pedestrian walkways, bicycle lanes to increase accessibility to rail stations". Malay Mail. Retrieved 3 March 2023.
Notes
[edit]- ^ Excluding annexed stations from Kajang Line and the cancelled Bandar Malaysia stations