The Kamburu Hydroelectric Power Station, also Kamburu Dam is a rock-filled embankment dam on the Tana River in Kenya which straddles the border of Embu and Machakos Counties in Eastern Province. The primary purpose of the dam is hydroelectric power generation and it supports a 93 MW power station. Construction on the dam began in 1971 and it was completed in 1975, with the power station getting commissioned the same year. US$23 million of the US$47 million project cost was provided by the World Bank. The power station is operated by the Kenya Electricity Generating Company and is part of the Seven Forks Scheme.[1][2]

Kamburu Dam
Kamburu Dam is located in Kenya
Kamburu Dam
Location of Kamburu Dam in Kenya
CountryKenya
LocationEmbu County/Machakos County, Eastern Province
Coordinates0°49′45″S 37°40′04″E / 0.8291°S 37.6679°E / -0.8291; 37.6679
PurposePower
StatusOperational
Construction began1971
Opening date1974; 50 years ago (1974)
Construction costUS$47 million
Owner(s)Kenya Electricity Generating Company
Dam and spillways
Type of damEmbankment
ImpoundsTana River
Height52 m (171 ft)
Length730 m (2,400 ft)
Reservoir
Total capacity123,000,000 m3 (100,000 acre⋅ft)
Kamburu Power Station
Operator(s)Kenya Electricity Generating Company
Commission date1974
Hydraulic head82 m (269 ft)
Turbines3 x 31 MW Francis-type
Installed capacity93 MW (125,000 hp)

The 52 m (171 ft) tall dam creates a reservoir with a storage capacity of 123,000,000 m3 (100,000 acre⋅ft). The power station is located underground just below the left toe and contains three 31 MW Francis turbine-generators. The difference in elevation between the reservoir and power station affords a net hydraulic head of 82 m (269 ft). Water discharged from the power station travels down a 3,040 m (9,970 ft) long tailrace tunnel before reaching the Tana at Gitaru Reservoir.[3]

See also

edit

References

edit
  1. ^ "Kamburu Power Station". Kenya Electricity Generating Company. Retrieved 21 February 2015.
  2. ^ "Kenya - Kamburu Hydroelectric Project (English)". World Bank. Retrieved 21 February 2015.
  3. ^ "Kenya - Appraisal of the Kamburu Hydroelectric Project" (PDF). World Bank. 31 May 1971. pp. Annex 5. Retrieved 21 February 2015.